Presentation is loading. Please wait.

Presentation is loading. Please wait.

High Power Hg Target Conceptual Design Review Equipment Installation at CERN V.B. Graves P.T. Spampinato T.A. Gabriel Oak Ridge National Laboratory February.

Similar presentations


Presentation on theme: "High Power Hg Target Conceptual Design Review Equipment Installation at CERN V.B. Graves P.T. Spampinato T.A. Gabriel Oak Ridge National Laboratory February."— Presentation transcript:

1 High Power Hg Target Conceptual Design Review Equipment Installation at CERN V.B. Graves P.T. Spampinato T.A. Gabriel Oak Ridge National Laboratory February 7-8, 2005

2 O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 2 Conceptual Design Review 7-8 Feb 05 Outline  Facility layout & constraints  Modularity  Assembly sequence  Post-experiment operations

3 O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 3 Conceptual Design Review 7-8 Feb 05 CERN Tunnel Plan View A. Fabich, CERN Access from ground level Experiment Setup

4 O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 4 Conceptual Design Review 7-8 Feb 05 TT2A Photos Photos from A. Fabich, CERN Tunnel Width 400cm (158") Width 1.3m (51")

5 O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 5 Conceptual Design Review 7-8 Feb 05 Facility Constraints  No overhead lifting capability within tunnel  Mobile crane used to lower equipment from ground level to tunnel floor  All components must have lifting points  Components moved manually  Modularity required  Component footprint size limitation is 1.3m x 3m

6 O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 6 Conceptual Design Review 7-8 Feb 05 System Modules  Solenoid  Target module (inside solenoid)  Hg delivery system  Hydraulic pump & controls

7 O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 7 Conceptual Design Review 7-8 Feb 05 Assembly Sequence  Align solenoid to beam, set elevation and tilt  Fiducials assumed to be on solenoid  Manually insert target module into bore of solenoid  Beam windows on primary & secondary containment can be used as fiducials to insure proper insertion depth  Position Hg delivery system  Align Hg delivery system as required, set elevation and tilt  Alignment precision dictated by size of downbeam window on secondary containment  Connect flexible hoses  Leak check primary containment  Load Hg if not already in sump tank  Position hydraulic reservoir  Connect hydraulics & instruments

8 O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 8 Conceptual Design Review 7-8 Feb 05 Post-Experiment Operations  Minimize operator time near equipment  Prefer to leave target module and delivery system intact for this operation  Lower Hg system and solenoid together  Retract Hg system, adding support for target module as it exits solenoid  Must have adequate clearance in front of beam stop  Move solenoid and Hg system out of beam line  May need to operate Hg system one last time to move majority of Hg into sump tank (depends on type of sump drain valve used)  System isolated for radiation decay


Download ppt "High Power Hg Target Conceptual Design Review Equipment Installation at CERN V.B. Graves P.T. Spampinato T.A. Gabriel Oak Ridge National Laboratory February."

Similar presentations


Ads by Google