1 UCSB Silicon Workshop: Shutdown Review Ankush Mitra Academia Sinica

2 11 May 06UCSB Silicon Workshop: SVX3D2 PDB Review Went through EVERY ladder PDB Entry Checked they were up to date and relevant Did any chips recover ? Can we fix any old problem Some ladders appeared to have recovered Did we do any good ? Waiting for the verdict

3 11 May 06UCSB Silicon Workshop: SVX3D3 April: Month of Bore Both plugs pulled out New challenge: Keep SVX < 0C throughout Diamond Installation Very tricky installation…but did a good job See Peter Dong’s talk New dew-point sensors installed at Sili-Baggy Replaced dead SVX & ISL RH sensor It appears we had no problems: A successful plug pull

4 11 May 06UCSB Silicon Workshop: SVX3D4 Sili-Baggy Humidity during installation Diamond Install COT Baggy Opened Slight change in Sili-Baggy

5 11 May 06UCSB Silicon Workshop: SVX3D5 …what else ? VRB Load Balancing Looks it worked: See Mark’s talk CCC Installation A buffer for the Clock to the SRC: See Shulamit’s Talk CAEN Work Fixed a CAEN Backplane Swapped out 3 CAEN PS Making more L00 crowbars Making a replica of Jen’s PS Test stand at FCC Avoid the need to bring CAEN supplies back and forth One worry: Now need to send a bunch of PS back to CAEN What will be the turn around time ??? Chiller work Both chillers overhauled Filters replaced The ISL “Hit me baby one more time” flow meter replaced PS-GUI: Introduced power by crate option Brought back two spare ladders from SciDet for “play” @ FCC This workshop!!!!