Presentation is loading. Please wait.

Presentation is loading. Please wait.

UGDIE KICK-OFF MEETING F-MAN 1 ΑΝΝΕΧ 1-A by UGDIE.

Similar presentations


Presentation on theme: "UGDIE KICK-OFF MEETING F-MAN 1 ΑΝΝΕΧ 1-A by UGDIE."— Presentation transcript:

1 UGDIE KICK-OFF MEETING F-MAN 1 ΑΝΝΕΧ 1-A by UGDIE

2 UGDIE KICK-OFF MEETING F-MAN 2 WP6 - Assessment and Evaluation To evaluate project results through the performance analysis of the prototype To identify F-MAN added value To perform impact and cost-benefit analysis

3 UGDIE KICK-OFF MEETING F-MAN 3 Evaluation planning –definition of verification objectives and relevant indicators –qualitative estimation of potential impacts –selection and definition of assessment methods –planning of verification procedures Evaluation reporting –configuration management –evaluation meetings –final assessment –Peer Review activities co-ordination WP6 - Assessment and Evaluation

4 UGDIE KICK-OFF MEETING F-MAN 4 Duration: 30 months D12 - Evaluation plan at t 0 + 6 (draft) D12 - Evaluation plan at t 0 + 24 (final) D13 - Evaluation results at t 0 + 30 WP6 - Assessment and Evaluation

5 UGDIE KICK-OFF MEETING F-MAN 5 WP6 - Link with other WPs For the success of the project, it is mandatory a complete information exchange between the WPs and the evaluation team

6 UGDIE KICK-OFF MEETING F-MAN 6 WP6 - Typical validation tables Planning Summary Review of All Application and their Validation Sites

7 UGDIE KICK-OFF MEETING F-MAN 7 WP6 - Typical validation tables Definition of Expected Impacts of Application for Different Target Group

8 UGDIE KICK-OFF MEETING F-MAN 8 WP6 - Typical validation tables Definition of Validation Objectives with respect to Categories of Assessment and User Groups Involved in Validation

9 UGDIE KICK-OFF MEETING F-MAN 9 WP6 - Typical validation tables Verification Plan Summary

10 UGDIE KICK-OFF MEETING F-MAN 10 WP6 - Typical validation tables Tracking of User Needs

11 UGDIE KICK-OFF MEETING F-MAN 11  Description of Application  Description of Impacts  Description of Verification Sites  Definition of European Added Value  Definition of Indicators to be assessed  Description of the verification procedure (simulation vs. real-operation)  Description of the role of users during verification  Criteria for the definition of the verification scenarios  Level of confidence of the verification results  Overall definition of success  User Acceptance WP6 - Evaluation: planning baseline

12 UGDIE KICK-OFF MEETING F-MAN 12  Interface between the European Commission and the Consortium  Quarterly Management Reports  Periodic Reports  Cost Statements  FULL COMPLIANCE WITH THE EC GUIDELINES WP8 - Project Management

13 UGDIE KICK-OFF MEETING F-MAN 13 WP8 - Project Management


Download ppt "UGDIE KICK-OFF MEETING F-MAN 1 ΑΝΝΕΧ 1-A by UGDIE."

Similar presentations


Ads by Google