Presentation is loading. Please wait.

Presentation is loading. Please wait.

A.Chekhtman1 GLAST LAT ProjectInstrument Analysis meeting, January, 20, 2006 Status of calorimeter calibration. Alexandre Chekhtman NRL/GMU Gamma-ray Large.

Similar presentations


Presentation on theme: "A.Chekhtman1 GLAST LAT ProjectInstrument Analysis meeting, January, 20, 2006 Status of calorimeter calibration. Alexandre Chekhtman NRL/GMU Gamma-ray Large."— Presentation transcript:

1 A.Chekhtman1 GLAST LAT ProjectInstrument Analysis meeting, January, 20, 2006 Status of calorimeter calibration. Alexandre Chekhtman NRL/GMU Gamma-ray Large Area Space Telescope

2 A.Chekhtman2 GLAST LAT ProjectInstrument Analysis meeting, January, 20, 2006 Tresholds calibration calibDAC (run 135005271) –pedestals, relgain, fle2adc, fhe2adc, lac2adc, uld2adc muTrg (runs 135005296, 135005297, 135005298) –Bias between FLE/FHE thresholds for charge injection and muons Additional input – adc2nrg tables –We used data from 8-towers configuration + preship data for recently added towers. Output: –Xml files for FLE, FHE, LAC and ULD for all required configuration Difficulties: –Bug in the algorithm for smoothing sparsed characterisation tables caused some LAC and FHE to be too low producing high trigger rate and occupancy – has been fixed –For some channels required FLE thershold could not be set – the algorithm incorrectly returned FLEDAC=7f in this case Fixed

3 A.Chekhtman3 GLAST LAT ProjectInstrument Analysis meeting, January, 20, 2006 Energy scale calibration Inputs: –calibGen (runs 135005279 and 135005280) Nonlinearity calibration –B13 (run 135005337) Pedestals –B30, runs 135005404 – 135005524, excluding 135005406(file missing) and 135005494 (bad) 26 M events Separate batch job for each tower –CPU time ~3 hours per tower –All towers processed in parallel Outputs: ci_intnonlin.digitization-v3r4p4_135005279_digi_DIGI.xml mc_peds.digitization-v3r4p4_135005337_digi_DIGI.xml mc_asym.digitization-v3r4p4_135005404_digi_DIGI.xml mc_mpd.digitization-v3r4p4_135005404_digi_DIGI.xml


Download ppt "A.Chekhtman1 GLAST LAT ProjectInstrument Analysis meeting, January, 20, 2006 Status of calorimeter calibration. Alexandre Chekhtman NRL/GMU Gamma-ray Large."

Similar presentations


Ads by Google