Presentation is loading. Please wait.

Presentation is loading. Please wait.

Keutsch 24” 78” Met CO 24” 30” Met 24” 18” AC 20” interior 40” exterior Doors 4” Holes for sampling tubing, several on top of each other 4” Holes for tubing.

Similar presentations


Presentation on theme: "Keutsch 24” 78” Met CO 24” 30” Met 24” 18” AC 20” interior 40” exterior Doors 4” Holes for sampling tubing, several on top of each other 4” Holes for tubing."— Presentation transcript:

1 Keutsch 24” 78” Met CO 24” 30” Met 24” 18” AC 20” interior 40” exterior Doors 4” Holes for sampling tubing, several on top of each other 4” Holes for tubing to pump shed Current Container new layout Faloona 32” 68” Main door Old CG comp Holzinger? 24” 30” Old GC Workspace 24” 36” Work space and storage 24” 48” Tower Location

2 26’ interior length Mobile Lab, 28 ft exterior GC/Mass spec 24” 60” Cohen HONO 24” 60” Goldstein PTRMS 32” 36” Cohen comp 25 ” 20” Cohen Blue NOy gradient 40” 38” Cohen Dye NOy Flux 40” 38” Cohen comp 25 ” 20” GC/MS Aerosol 24” 60” Door 45” AC 20” interior 40” exterior Roll up door Thornton 36” 46” This end will be near new scaffolding tower.

3 17’ interior length Jimenez AMS 42” 25” Jimenez Computer 24” 36 ” New Container, 20 ft exterior Jimenez Thermal denuder 24” 96” Jimenez DMA 24” 36” Brune TEOM 24” 48” Table Dye Brune Electronic Rack 36” UPS Vong Computer 30” 19” Covert 30” 19” This end will be near scaffolding tower. Please note: this trailer will be quite full, and there was no space left for doors and other obstacles which might be present. Some shuffling might occur.


Download ppt "Keutsch 24” 78” Met CO 24” 30” Met 24” 18” AC 20” interior 40” exterior Doors 4” Holes for sampling tubing, several on top of each other 4” Holes for tubing."

Similar presentations


Ads by Google