1 1 Hybrid & Module Testing Status Week of 6/6-6/10

2 2 UCSB Hybrid Testing Status

3 3 UCSB Hybrid Testing Failures This Week: 1 shorts in PA Repairable 4 modules repaired Cumulative: 1 with Shorts in PA Repairable 1 Major Scratch in PA Repairable 2 noisy on edge channels Should be ok 1 Smashed APV-PA Bonds Repairable 6 Failed Inspection Never should have sent 1 Broken Ceramic 1 Bad Bond Feet 1 Weak Wirebonds 1 Too Many Opens 4 with unknown failure Effects entire chip(s)

4 4 FNAL Hybrid Testing Status

5 5 FNAL Hybrid Testing Failures This Week:Cumulative: 7 with Shorts in PA Repairable 1 Major Scratch in PA Repairable 1 Damaged during repair 5 Too Many Opens + Noisy 14 with unknown failure Effects entire chip(s)

6 6 US Hybrid Testing Status

7 7 UCSB ARCS Testing Status

8 8 UCSB ARCS Testing Failures This Week None Cumulative 2 with too much current 1 with >2% bad channels 1 with bad DCU Repairable 1 with CF frame shorted to HV Repairable 1 with bad Dec. Mode chip

9 9 UCSB ARCS Testing Results 945 Total Tested 936 Grade A 3 Grade B 6 Grade F This week: 10 of 44032 channels bad (0.023%) Total Production: 304.5 of 643328 channels bad (0.047%)

10 10 FNAL ARCS Testing Status

11 11 FNAL ARCS Testing Failures This Week (8387-8446, 60 modules). 1 mod, real pinholes (8417, chs 1,4,6,7 PASi pulled), OK. 1 mod 30 mkA at 15V (8421, ch 289 PASi pulled), OK. no PHL- 3 SHT (8411, 8430, 8434). Cumulative (7835-8446) 2 grade “B” (mishandling; missing bonds on p/a) 7970 - breakdown current behavior @430V Total of 14 pinholes Grade F – problem with chip #2 (every 8 th channel is identified as PHL-) Grade F-High current 8289 Cumulative (7702-8446, 745 modules, ARCSed 744) 2 grade “B” (mishandling; missing bonds on p/a) 2 grade “F” mishandling 1 grade “F” under study 7970 - breakdown current behavior @430V

12 12 FNAL ARCS Testing Results 747 Total Tested 737 Grade A 2 Grade B 5 Grade F This week: Total Production:

13 13 US ARCS Testing Status

14 14 UCSB LT Testing Status Failed module has too much current

15 15 Modules 30200020008325 – 8345, 8425-8434, 8413-8422 were tested during June 9 – June 13. We did 4 runs. K-Mux errors were happening two times – only in the beginning of new run, program had to be restarted Quick connect between hose and coldbox was damaged and leaking. Replaced quick connect and renewed the liquid – delay in one run. Module 8348 had high leakage current (~2.8uA@450V) and steeper then usual.~2.8uA@450V Modules 8331, 8336-8345, 8431 had high noise in the cold record (~3.5ADC) -> all channels marked NOISY -> xml :-1: Possible reason – no HV bias during cold cycle. Need more quiet time to investigate. Backlog: 54 modules FNAL LT Testing Status

16 16 FNAL LT Testing Status

17 17 US LT Testing Status