Scheduling Under Uncertainty: Planning for the Ubiquitous Grid Neal Sample Pedram Keyani Gio Wiederhold Stanford University.

Similar presentations


Presentation on theme: "Scheduling Under Uncertainty: Planning for the Ubiquitous Grid Neal Sample Pedram Keyani Gio Wiederhold Stanford University."— Presentation transcript:

1 Scheduling Under Uncertainty: Planning for the Ubiquitous Grid Neal Sample Pedram Keyani Gio Wiederhold Stanford University

2 Coordination 2002 2 Why We’re Here Coding Integration/Composition 1970 1990 2010

3 Coordination 2002 3 Sample Composition Tasks Logistics Reservation and distribution systems, “find the best transportation route from A to B” Genomics Framework for composing various processing tools and repositories Modeling Weather prediction, complex chemical systems, basin modeling Composition of services (vs. components, data)

4 Coordination 2002 4 Remote, autonomous Services are not free Fee (£) Execution time Open Service Model GRID – principles UDDI, IETF SLP – protocols Globus, CPAM – runtime support Composition of Large Services

5 Coordination 2002 5 Service Scheduling Goals Closest to Soft Real-time, Job Shop Objectives Minimize transaction time Minimize transaction cost Differences No control over service availability No control over resource allocation No control over workplace loads => Schedules become inaccurate

6 Coordination 2002 6 New Scheduling Requirements Why not traditional scheduling (e.g., CSP)? Runtime performance changes More than just scheduling: rescheduling in the face of runtime hazards Why not traditional rescheduling? No resource allocation/control “Observe, not control”

7 Coordination 2002 7 Scheduling Difficulties Adaptation: Schedules must be adaptive Schedules for T 0 are only guesses Estimates for multiple stages may become invalid => Schedules must be revised during runtime Allocation: The scheduler does not handle resource allocation Means: Competing objectives have orthogonal scheduling techniques Changing goals for tasks or users means vastly increased scheduling complexity

8 Coordination 2002 8 Sample Program //sample program BEGIN out1 = serviceA() out2 = serviceB(out1) out3 = serviceC(out2) out4 = serviceD(out2) END //declarative C A D B

9 Coordination 2002 9 Budgeting Time Maximum allowable execution time Expense Total resources available to lease services Surety Schedule confidence Goal and assessment technique

10 Coordination 2002 10 Program Schedule as a Template Instantiated at runtime Service provider selection, etc. D A C B D D D D D A A A A B B B B B C C C C

11 Coordination 2002 11 Program Schedule as a Template Instantiated at runtime Service provider selection, etc. D A C B D D D D D A A A A B B B B B C C C C

12 Coordination 2002 12 Steps in Scheduling Estimation Planning Invocation Monitoring Completion Rescheduling

13 Coordination 2002 13 CHAIMS Scheduler Program Analyzer Input program Planner Requirements Estimator/ Bidder MonitorDispatcher StatusCosts/TimesControl observeinvokehaggle Budget

14 Coordination 2002 14 t 0 Schedule Selection Guided by runtime “bids” Constrained by budget D A C B D D D D D A A A A B B B B B C C C C 7±2h £50 6±1h £40 5±2h £30 3±1h £30

15 Coordination 2002 15 t 0 Schedule Constraints Budget Time: upper bound- e.g. 22h Cost: upper bound- e.g. £250 Surety:lower bound- e.g. 90% {22, 250, 90} Steered by user preferences/weights = Selection (single value convolution) S1 est [20, 150, 90] = (22-20)*10 + (250-150)*1 + (90-90)*5 = 120 S2 est [22, 175, 95] = (22-22)*10 + (250-175)*1 + (95-90)*5 = 100 S3 est [18, 190, 96] = (22-18)*10 + (250-190)*1 + (96-90)*5 = 130

16 Coordination 2002 16 Program Evaluation and Review Technique (PERT) Service times: most likely(m), optimistic(a) and pessimistic(b) and ; N(0, 1)  (1) expected duration (service) (2) standard deviation (3) expected duration (program) (4) test value (5) expectation test (6) ~expectation test

17 Coordination 2002 17 t 0 Schedule Properties Probability Density Probable Completion Time deadlineBank = £100 surety

18 Coordination 2002 18 Runtime Hazards With resource allocation or without hazards Scheduling becomes trivial Runtime implies t 0 schedule invalidation Sample hazards Delays and slowdowns Stoppages Inaccurate estimations Communication loss Competitive displacement… OSM

19 Coordination 2002 19 Definition + Detection execution time 0 80 100 minimum surety  hazard 90 surety % PROGRESSIVE HAZARD serviceA start serviceB start (serviceB slow)

20 Coordination 2002 20 Definition + Detection execution time 0 80 100 minimum surety  hazard 90 surety % CATASTROPHIC HAZARD 0% serviceA start serviceB start (serviceB fails)

21 Coordination 2002 21 Monitoring Observe, not control CPAM runtime support Parameter presetting ESTIMATE(…) primitive for service cost Used a t 0 and t reschedule Service progress EXAMINE(…) primitive Used with PERT to detect surety hazards C A D B

22 Coordination 2002 22 Schedule Repair Simple cost model: early termination = linear £ recovery Greedy selection of single repair – O(s*r) execution time 0 80 100  t hazard 90 surety % C A D B t repair

23 Coordination 2002 23 Strategy 1: service replacement Pro: minimize £ lost Pro: boost surety Con: lost investment of £ and time Con: concedes recovery chance execution time 0 80 100  t hazard 90 surety % C A D B t repair B’

24 Coordination 2002 24 Strategy 2: service duplication Pro: large boost surety Pro: leverages recovery chance Con: large £ cost execution time 0 80 100  t hazard 90 surety % C A D B t repair B’

25 Coordination 2002 25 Strategy 3: pushdown repair Pro: cheap, no £ lost Pro: no time lost Con: cannot handle all hazard types, e.g. catastrophic hazards Con: requires recovery chance execution time 0 80 100  t hazard 90 surety % C A D B t repair C’ x

26 Coordination 2002 26 Strategy 4: do nothing/bail-out Pro: no additional £ cost Pro: ideal solution for partitioning hazards Con: generally non-effective Con: depends on self-recovery execution time 0 80 100  t hazard 90 surety % t repair C A D B

27 Coordination 2002 27 Experimental Results Rescheduling options Limit repair options to one strategy Limits flexibility and effectiveness Use all strategies Setup 1000 random DAG schedules, 2-10 services 1-3 hazards per execution Fixed service availability All schedules are recoverable

28 Coordination 2002 28 “The Numbers” Value of close finishes? (!= 100% surety)

29 Coordination 2002 29 Why the Differences? Catastrophic hazard Service provider failure - Cannot be solved by “do nothing” Pseudo-hazard Communication failure, network partition Looks exactly like catastrophic hazard Can’t terminate for £ recovery - Appropriate solution is “do nothing” Slowdown hazard (actual or apparent) Not a complete failure, multiple solutions - “do nothing” may be ideal or futile

30 Coordination 2002 30 A Fundamental Weakness Observations of progress are only secondary indicators of current work rate projected finish  finish time

31 Coordination 2002 31 Open Questions Mundane issues Taxonomy of hazard/solution combinations Vary service provider densities Monitor resolution adjustments Networks are not free or zero latency Unstudied effect delayed status information Pseudo-hazards What is a good amount of delay to avoid them? (without getting into deeper trouble…) Accuracy of t 0 service cost estimates ~hazard with delayed detection 1-way hazard

32 Coordination 2002 32 (Deeper) Open Questions User preferences only used in generating initial (t 0 ) schedule fixed least cost repair (  =  surety / repair cost) Best cost repair (success sensitive to preference?) Second order cost effects £ left over in budget is purchasing power What is the value of that purchasing power? Sampling for cost estimates during runtime Surety = time + progress (+ budget balance) Penalty regimes

33 Coordination 2002 33 (Deeper) Open Questions Simultaneous rescheduling Use more than one strategy for a hazard NP – reduction to Hamiltonian Path NP here might not be that hard… Approximations are acceptable Small set Strong constraints NP is worst case, not average case…

34 Coordination 2002 34 (Deeper) Open Questions on time target start/run finish + data transportation costs + Completing the cost model

35 Coordination 2002 35 (Deeper) Open Questions client ready to start hold fee lateearlyon time target start/run reservation finish client ready for data +-+ ++ data transportation costs + Completing the cost model

36 Coordination 2002 36 Conclusions Initial results given artificial hazards Seemingly effective rescheduling strategies Difficult to characterize the solutions Should translate well out of the sandbox and into an actual runtime Clear directions for continued research Project home http://www-db.stanford.edu/CHAIMS/