1 The Perfect Shower Team – Clean Mikal Tirfe Sandra Wiese Negar Ehsan Tony Carosa Tim Plummer

2 Agenda  Project Description (Sandra)  Design Objectives  High Level Implementation (Tony)  Digital Control Unit  User Interface (Negar)  Analog Controls  Mechanical System (Tim)  Risk and Contingency Plan  Cost Estimate (Mikal)  Division of Labor  Schedule

3 Primary Design Objectives  To control the temperature of the shower  Control the water pressure of the shower  Manual user override  Safe in shower user interface  Shower ready indicator  Build a working model

4 Secondary Design Objectives  Continuous flow system  Four user presets  Low hot water warning  Advanced user interface (such as optical or voice)  Longest shower estimator  Power System  Metric/English unit selection

5 High Level Implementation

6 Digital Control Unit

7

8 User Interface  Safe for in shower use  Four seven segment LED displays  Six function buttons (On/Off, Temp set, Pressure set, Up, Down, Emergency off)  Five LEDs to indicate display mode

9 Analog Temperature Controls

10 Analog Pressure Controls

11 Mechanical System  Build complete demo system  Water pump  PVC piping  Catch tub

12 Risk and Contingency Plan Possible Risks  Not able to build motor controller  Sensor characteristics are not good enough for our purposes  Unable to meet safety standards  Team member unable to fulfill designated tasks Solution to Risk  Use stepper motor and digital control  Refine baseline objectives  External shower control  Re-evaluate schedule, workload, and baseline objectives

13 Cost Estimate  Mechanical parts$200.00  Digital Components$200.00  Analog Components$100.00  Total$500.00

14 Division of Labor and Responsibilities Sandra: Team Coordinator, Analog System Tony: System Interfaces, Digital System Negar: Analog System, User Interface Mikal: Digital System, User Interface Tim: Digital System, Mechanical System

15 Project Schedule

16 Questions?