Presentation is loading. Please wait.

Presentation is loading. Please wait.

1 Tracking Tests of DHC Tower Update - 10/01/2003 Kurt Francis - Northern Illinois University.

Similar presentations


Presentation on theme: "1 Tracking Tests of DHC Tower Update - 10/01/2003 Kurt Francis - Northern Illinois University."— Presentation transcript:

1 1 Tracking Tests of DHC Tower Update - 10/01/2003 Kurt Francis - Northern Illinois University

2 2 PMT 2 TOP 16 42 6 73 3 x55 1 x247 PMT 1 BOTTOM 41 74 x x7 3 266 3 1552 Array 11 Array 12 Array 4 Array 9 Array 3 Array 6 Array 2 Array 7 Array 8 Array 10 Array 5 Array 1 1 24 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7 3 1 2 3 4 5 6 7 3 MIP 1 2 3 4 5 6 7 Layer 1 Layer 2 Layer 3 Layer 4 Dynode 12 1 2 3 4 5 6 7 Paddle1 Paddle2

3 3 Current Status 63/4601 = 1.6% events have all 32 channels active, even the channels not connected to cells, looks like bad data but I have no explanation yet. –Could be PMT –Could be QDC –Could be triggering system generating extra long trigger

4 4

5 5

6 6

7 7

8 8

9 9

10 10

11 11

12 12

13 13

14 14 Next Steps Track down source of 32 channel events Try to use dynode-12 signal from second PMT to create 4-way coincidence trigger or to replace one of the Paddles Still want to do more tests with Light Yield and S.P.E.


Download ppt "1 Tracking Tests of DHC Tower Update - 10/01/2003 Kurt Francis - Northern Illinois University."

Similar presentations


Ads by Google