1 Commissioning Needs MOM (m. apollonio) RUN Schedule –Dry Run –DAQ / Detectors / Target Proton Absorber –polarity inversion SHIFTERS ! Future MoM.

Similar presentations


Presentation on theme: "1 Commissioning Needs MOM (m. apollonio) RUN Schedule –Dry Run –DAQ / Detectors / Target Proton Absorber –polarity inversion SHIFTERS ! Future MoM."— Presentation transcript:

1 1 Commissioning Needs MOM (m. apollonio) RUN Schedule –Dry Run –DAQ / Detectors / Target Proton Absorber –polarity inversion SHIFTERS ! Future MoM

2 2 MA Giorgio Cecchet - GC GA MP HN AA Mom shifter

3 3 GC ????? AA?? the unkown shifter … This is Machine Physics!!! Do we want to do something?

4 4 Thanks Paul !!! cushion day / no run

5 5 DRY RUN on Nov 2 nd –Verify procedures –Verify slow control (EPICS), with special regard to magnets –verify BLM (dummy trigger with gate generator) DAQ experts around … –JSG from Nov 1 st, VV from Nov 3 rd TARGET crew –Anyone around on Nov 3 rd ? Proton Absorber –polarity inversion on Nov 29 th : test again with + particles –Study effect of polyethilene multilayers

6 6 SHIFTERS ! –Nov 3 : anyone ??? –Nov [4,7]: Gail Hanson –Nov [8,12]: Milorad Popovic –Nov 13: Andri Alekou (?) –Nov [15,22]: Henry Nebrensky –Nov [22,26]: Andri Alekou (?) –Nov [26 …]: Unnamed Shifter …

7 7 Moms (present & future) –[…, Nov2] MA –[Nov2, Nov25] Giorgio Cecchet –[Nov26, Dec1] GC (check fund availability) –[Dec 2, Dec 20] No certain name … –January and beyond … ditto