Presentation is loading. Please wait.

Presentation is loading. Please wait.

1 F - MAN Pool - Concept - Dipl.-Ing. Eckhard Kuhla Project Manager EKonsult GmbH ++ 49 8105-777838

Similar presentations


Presentation on theme: "1 F - MAN Pool - Concept - Dipl.-Ing. Eckhard Kuhla Project Manager EKonsult GmbH ++ 49 8105-777838"— Presentation transcript:

1 1 F - MAN Pool - Concept - Dipl.-Ing. Eckhard Kuhla Project Manager EKonsult GmbH ++ 49 8105-777838 ek@ekonsult.de

2 2 Project F-MAN - Goals Development of 3 modules (Tracking / Tracing, Data Processing, Asset Management) Europe wide testing of a prototype Development of the F-MAN Pool - tool set - Financed by EU - Members: CP, SNCF (via SIGMA), SZ (via PI), Software-, Telecom - companies, Universities - Project running time: 01.10.2001 – 30.09.2004 - Status: Software tools ready Start field testing 1.3.04

3 Background -EUROP – Pool cancelled without substitution -Wagonlink(Railion etc) project also stopped -EC is pushing „New Wagon Status“: a „liberalized“ RIV (like P-Wagons), with this: -Big players tend to control their own assets and to reach bilateral agreements -Unclear billing process for loaded / empty wagons

4 4 F-Man Pool Concept (1) POOL - Dedicated wagons at - Different locations - type oriented OfferBid „OUT “ „IN“ „loaded“ „empty“ Goals - reducing the empties - asset control Preconditions - virtual access (location control) - physical access (operation) - „IN“ / „OUT“ control (incl. accounting system) - loaded / empty control (optional)

5 5 F-MAN Pool Concept (2) - Contracting between RU and the Pool Manager („pool dedication“) Contract time fees, pay/payback process revenue participation - Wagon transportation to a defined location - After wagon request: „bid / offer“ – process or fixed fee usage - Dedication pool client  wagon („client dedication“) - Automatic starting of the billing process (from „OUT  IN“) - (Optional: loading information) - After „IN“ (- Pool) information: return trip to location of empties

6 6 Tools - Telematic box with position / status information (On Board Terminal) - Decision support with Business rules bid /offer procedure defined access / exit rules management incentives to create win/win situation - Billing capabilities as a function of status indication pool usage time transportation prices for the empties

7 7 Added Value Compared with recent pool experiences: - asset control via real time management (by OBT),that means - cost allocation to user and cost mode with - automatic billing, is - a „Wagon Pool Ltd.“ possible - with productivity control and higher wagon availability - commercial incentives for the pool participants

8 8 Problem / Solutions - Pool Access only via wagons with an OBT  Matter of a Business Case for the wagon owner - Balancing between own usage and pool operation  Selection of short-, medium-, and long termed contract - Geographical gap between location of empties and loading terminal, unbalanced volume flows  Optimisation tool available by F-MAN - „Sufficient“ free wagon capacities  Case to Case solutions Pool wagons are „revenue units“

9 9 F-MAN at your Service  Please feel free to visit us on our web page www.fman.org or phone us: ++ 49 8105 777838  We would be happy to present our concept, ideas and experiences. Thank you!


Download ppt "1 F - MAN Pool - Concept - Dipl.-Ing. Eckhard Kuhla Project Manager EKonsult GmbH ++ 49 8105-777838"

Similar presentations


Ads by Google