A. Baldini PSI July 04 General Introduction Work done in the past 4 months presented in the individual sub-detectors talks: highlights Construction is.

Similar presentations


Presentation on theme: "A. Baldini PSI July 04 General Introduction Work done in the past 4 months presented in the individual sub-detectors talks: highlights Construction is."— Presentation transcript:

1 A. Baldini PSI July 04 General Introduction Work done in the past 4 months presented in the individual sub-detectors talks: highlights Construction is now fully going on but tests are continuing Much more detailed schedule for the next year

2 A. Baldini PSI July 04 INFN & Pisa University A. Baldini, C. Bemporad, F.Cei, S. Giurgola, M.Grassi, F. Morsani, D. Nicolo’, A. Papa, R. Pazzi, F. Raffaelli, F. Sergiampietri, G. Signorelli ICEPP, University of Tokyo Y. Hisamatsu, T. Iwamoto, T. Mashimo, S. Mihara, T. Mori, H. Natori, H. Nishiguchi, W. Ootani, K. Ozone, R. Sawada, Y. Uchiyama, S. Yamada, S. Yamashita KEK, Tsukuba T. Haruyama, A. Maki, Y. Makida, A. Yamamoto, K. Yoshimura Waseda University T. Doke, J. Kikuchi, H. Okada, S. Suzuki, K. Terasawa, M. Yamaguchi Budker Institute, Novosibirsk L.M. Barkov, A.A. Grebenuk, D.G. Grigoriev, B, Khazin, N.M. Ryskulov PSI, Villigen J. Egger, P. Kettle, M. Hildebrandt, S. Ritt, M. Schneebeli INFN & Pavia University A.de Bari, P. Cattaneo, G. Cecchet, G. Nardo’, M. Rossella INFN & Genova University S. Dussoni, F. Gatti, P. Ottonello, D. Pergolesi, R. Valle INFN Roma I D. Zanello INFN & Lecce University S. Spagnolo, C. Chiri, P. Creti, C. Gatto,G. Palama’, M. Panareo, G. Tassielli

3 A. Baldini PSI July 04 Highlights Beam: spot size bigger than previous estimates  MC simulations: is this a problem ? Magnet: interaction with the other experiments Xenon detector: PMTs with double Al layer tested (very good results) work on a modified base (zener diodes) Drift chambers: test of foils stability  introduction of a carbon fiber Timing counter: test in the COBRA field Electronics: new design of the DSR (x-talk) Software: framework chosen. Further people joining the experiment

4 A. Baldini PSI July 04 Construction Beam: Triplet I and II finished BTS specifications sent to Novosibirsk Xenon detector: Cryostat design finished (order in September) 290 PMTs ordered Design of the PMT supporting structure Timing Counter: 2’’ PMTs soon ordered final design started

5 A. Baldini PSI July 04 Tests Neutron test done in the past days (to be continued): initial results Timing counters in Cobra + test of full size at different angles New Xenon test this year with negative pions to test timing resolutions with the new PMTs and final electronics (dsr, Trigger) + calibration wires (spots on a thin wire)

6 A. Baldini PSI July 04 2004 JFMAMJJASOND Beam Time MEG Prac MEGGotta COBRA Calibration (Wed) Beam Line Commiss. Part 1 Platf. Drift Chamber Proto type Timing Counter Test Mechan. Matching LPT Neutr. BG PM + Src Inst Pi- Beam Test Liq. Purif. Full Calorimeter Trigger DAQ Test

7 A. Baldini PSI July 04 20052006 JFMAMJJASONDJFMA Beam Time ShutdownMEGGotta?MEG Shutdown COBRA Field Map Beam Line BTS Test Commiss. Part 2 Full Beam Line Test Drift Chamber Mounting Mounting & Testing Timing Counter BG Test BG Test Inst LPT PMT testing + calibration Full Calorimeter Cryo. Installation Crane+ Tent Assembly Studies (Wed + remote) Test Trigger Inst DAQ DC Electr. Inst