Presentation is loading. Please wait.

Presentation is loading. Please wait.

GLAST LAT ProjectLAT Operations Planning, 23 March 2005 1 GLAST Large Area Telescope LAT Operations Planning 23 March 2005 Rob Cameron

Similar presentations


Presentation on theme: "GLAST LAT ProjectLAT Operations Planning, 23 March 2005 1 GLAST Large Area Telescope LAT Operations Planning 23 March 2005 Rob Cameron"— Presentation transcript:

1 GLAST LAT ProjectLAT Operations Planning, 23 March 2005 1 GLAST Large Area Telescope LAT Operations Planning 23 March 2005 Rob Cameron rac@slac.stanford.edu 650-926-2989 Gamma-ray Large Area Space Telescope

2 GLAST LAT ProjectLAT Operations Planning, 23 March 2005 2 LAT Operations Planning  Purpose of these meetings –manage the ISOC –coordinate activities involving and supporting LAT operations (online and offline) –coordinate resource allocations and resource planning for LAT operations –provide coherent planning for the transition from LAT development and construction phase to operating phase –Parallel the LAT Managers Face to Face meetings, and eventually replace LAT F2F meetings after LAT Project Office closes

3 GLAST LAT ProjectLAT Operations Planning, 23 March 2005 3 Participants  Participants in these meetings –Leads for major elements in the ISOC Online operations: commanding, health and safety Flight Software and Data Flow Lab support PVO + calibration and analysis methods Pipeline processing and delivery of LAT science data Data analysis software and tools –Others as necessary GLAST Project Office Project Science LAT Operations Steering Committee SLAC management

4 GLAST LAT ProjectLAT Operations Planning, 23 March 2005 4 ISOC Organization ISOC Commanding, Health & Safety Timeline Planning Command Generation Command V&V Health & Safety Configuration Tracking Flight Software Code Maintenance Code V&V Testbed Maintenance Performance V&O Calibration Performance Trending Standard Source Monitoring IRF Generation Science Products Level 1 CRs, gammas, diagnostics Level 2 Transients, GRBs Pipeline Operation Science Analysis Tools Simulation/Recon Science Tools Infrastructure Administrative Support

5 GLAST LAT ProjectLAT Operations Planning, 23 March 2005 5 The ISOC in the LAT Collaboration  ISOC has close connections to LAT Science Groups –e.g. Working with Calibration and Analysis Methods Group to incorporate improvements to event reconstruction into ISOC processing and products  ISOC has broad involvement in the LAT collaboration –e.g. instrument performance analysis and tool development are coordinated by the ISOC across the collaboration

6 GLAST LAT ProjectLAT Operations Planning, 23 March 2005 6 SLAC Funding for ISOC  Separation of costs for ISOC operations support and LAT research scientists at SLAC  DOE applies $5M p.a. cap for ISOC operations  Numbers below are TBR –staff not finalized (e.g. FSW, SDP) –resource sharing with LAT Project not finalized RollupFY05 Ops ScienceFY06 OpsScienceFY07 OpsScienceFY08 Ops Science FTE17.40 13.10 29.95 13.60 29.15 13.60 28.15 13.50 MGT 1.00 - 2.50 0.50 2.50 0.50 2.50 0.50 CHS 8.10 2.00 9.80 2.00 9.00 2.00 8.00 2.00 FSW 2.90 0.50 9.00 0.50 9.00 0.50 9.00 0.50 PVO 1.00 5.10 1.00 5.10 1.00 5.10 1.00 5.00 SDP - - - - - - - - SAS 4.40 5.50 6.40 5.50 6.40 5.50 6.40 5.50 SUP - - 1.25 - - - $K (excl M&S) 3,770 2,189 4,719 2,397 4,532 2,481 4,540 2,545

7 GLAST LAT ProjectLAT Operations Planning, 23 March 2005 7 Logistics  Meeting schedule –Face to Face, or VRVS? –Biweekly, weekly, monthly? –Wednesdays, 2pm PT, or other?  Meeting format –Standard round-table summaries? –specific agenda items? –both? –Materials: Powerpoint,PDF,Confluence,URL?  Location –“Kavli” conference room, 084/room 188  Mailing list(s)  Web site(s)

8 GLAST LAT ProjectLAT Operations Planning, 23 March 2005 8 Agenda Items  LAT Configuration and Tracking Database  ISOC Facility areas –research activity to be concentrated in new KIPAC building –operations support to be concentrated in 084 –LAT Dataflow lab should stay in 084, where it is –move and expansion of ISOC operations facility from 210 to 084 as KIPAC vacates 084 –office shuffles in 084?  Staffing plans for ISOC  Coordination with I&T –support for I&T activities in 2005, 2006 –transition from I&T to ISOC-led operations  Ground tests, I&T support, and Data Challenges –Unified support -> a model for the future?  Other items?


Download ppt "GLAST LAT ProjectLAT Operations Planning, 23 March 2005 1 GLAST Large Area Telescope LAT Operations Planning 23 March 2005 Rob Cameron"

Similar presentations


Ads by Google