1 20-Nov-06 FALC - KEK Global Design Effort 1 GDE Report Barry Barish Caltech / GDE 20-Nov-06 RDR Design Freeze

2 20-Nov-06 FALC - KEK Global Design Effort 2 Outline Agenda Items –Progress towards the RDR –Provisional cost estimates –Discussion on the review process of the RDR –Site aspects of RDR Additional Items –GDE Coordination of Global R&D Program –Common Fund – Request for FY07

3 20-Nov-06 FALC - KEK Global Design Effort 3 Progress toward RDR

4 20-Nov-06 FALC - KEK Global Design Effort 4 Baseline to a RDR Jan JulyDec 2006 Freeze Configuration Organize for RDR Bangalore Review Design/Cost Methodology Review Initial Design / Cost Review Final Design / Cost RDR Document Design and CostingPreliminary RDR Released FrascatiVancouverValencia

5 20-Nov-06 FALC - KEK Global Design Effort 5 Vancouver Cost Data

6 20-Nov-06 FALC - KEK Global Design Effort 6 Costs by Area System

7 20-Nov-06 FALC - KEK Global Design Effort 7 Costs by Technical & Global System

8 20-Nov-06 FALC - KEK Global Design Effort 8 Optimizing Cost to Performance RDR MBCCB 2  14mr IRs supported central injectorssupported Removal of service tunnelrejected conventional e+ sourcerejected RF unit modifications (24  26 cav/klys) supportedsubmitted reduced RF in DR (6  9mm  z ) supportedin prep DR race-track lattice (CFS)supportedin prep reduced static cryo overheadsupportedin prep removal linac RF overheadsupportedin prep single-stage bunch compressorrejected e- source: common pre-acceleratorsupportedin prep

9 20-Nov-06 FALC - KEK Global Design Effort 9 Vancouver Costs for BDS Cost drivers –CF&S –Magnet system –Vacuum system –Installation –Dumps & Collimators Total Cost Additional costs for IR20 and IR2

10 20-Nov-06 FALC - KEK Global Design Effort 10 2/20 mrad  14/14 mrad Motivation –Reduce costs 2 mrad beam line expensive, risky, especially extraction line Common collider hall –Advantages Improved radiation conditions in the extraction lines Better performance of downstream diagnostics Easier design and operation of extraction optics and magnets Reduced back scattering from extraction line elements –Disadvantages Impact on physics (appears minor at present). Simpler incoming beam optics R&D on small crossing angles will continue as alternative

11 20-Nov-06 FALC - KEK Global Design Effort 11 On-surface Detector Assembly Vancouver WBS considered the underground halls sized at 32m (W) x 72m (L) each to allow underground assembly of the largest considered detector. Conventional Facilities Schedule gives detector hall is ready for detector assembly 5 yrs from project start –If so, cannot fit our goal of “7years until first beam” and “8years until physics run” Surface assembly allows to save 2-2.5 years and allows to fit into this goal –The collider hall size may be smaller (~40-50%) in this case –A building on surface is needed, but savings may be still substantial Optimization needs to be done

12 20-Nov-06 FALC - KEK Global Design Effort 12 CMS assembly approach Assembled on the surface in parallel with underground work Allows pre-commissioning before lowering Lowering using dedicated heavy lifting equipment Potential for big time saving Reduce size of underground hall required On-surface assembly

13 20-Nov-06 FALC - KEK Global Design Effort 13 Cost details of new 14/14 baseline Updates from CF&S Magnets to be included Should we go to a single IR and push pull system and save 30% of BCD costs?

14 20-Nov-06 FALC - KEK Global Design Effort 14 Push-Pull Evaluation Initiated by GDE & WWS at the end of September Detailed list of questions to be studied developed: Large group of accelerator and detector colleagues, from ILC and other projects, is participating in design and discussion of these question The task force of detector experts was formed to contribute to detailed evaluation of the whole set of technical issues http://www-project.slac.stanford.edu/ilc/acceldev/beamdelivery/rdr/docs/push-pull/

15 20-Nov-06 FALC - KEK Global Design Effort 15 Cost Reductions Logged Our efforts at Valencia identified another 4.91%!

16 20-Nov-06 FALC - KEK Global Design Effort 16 ILC Documents Several reports for different audiences Brochure – non-technical audiences, ready now “Quantum Universe” level booklet ~30 pages Executive Summary ~ 30 pages Physics motivation, accelerator and detectors RDR Report ~ 300 pages high level description of the accelerator DCR Report ~ 250 pages physics and detectors

17 20-Nov-06 FALC - KEK Global Design Effort 17 RDR Report RDR is a high level description of the accelerator, CFS, sites and costs A snapshot of what we propose to build –not a history of R&D, design evolution, and alternatives Editors: –Nan Phinney (SLAC), Nobu Toge (KEK), Nick Walker (DESY) Original schedule was complete draft now, but has been pushed back because of cost iterations

18 20-Nov-06 FALC - KEK Global Design Effort 18 Reviewing RDR & Costs

19 20-Nov-06 FALC - KEK Global Design Effort 19 Plans until Beijing (Feb. '07) NovemberDecemberJanuaryFebruary Valencia Further cost consolidation CCR preparation & submission Cost & Design Freeze 30/11 Prepare for Full Cost Review SLAC Cost Review 14-16/12 MAC 10-12/01/07 Final cost corrections and documentation Agency cost briefings Beijing: RDR draft published RDR final editing RDR prepare 1 st drafts 2006 2007

20 20-Nov-06 FALC - KEK Global Design Effort 20 Charge for MAC Review On Wednesday 10, Thursday 11 and Friday 12 (until noon) January 2007, there will be an ILC MAC meeting at the Cockcroft Institute, Daresbury, UK. The major item for the meeting is the ILC cost and overall design, with specific MAC tasks: –Review the soundness of the overall RDR concept, identify any areas of concern, note what R&D is still needed, and comment on whether the performance parameters can be met. –Review the cost methodology and identify any areas of concern. This will be the first occasion at which costs will be presented outside of the GDE.

21 20-Nov-06 FALC - KEK Global Design Effort 21 What Happens after Beijing? Public Release of Draft RDR and Preliminary Costing at Beijing –Cost Reviews, etc –Finalize RDR by Summer 2007? Enter into Engineering Design Phase –Planning underway internally –Design will evolve through value engineering and R&D program –General Goal is to have Construction Proposal ready by 2010

22 20-Nov-06 FALC - KEK Global Design Effort 22 Proposed RDR Review Process

23 20-Nov-06 FALC - KEK Global Design Effort 23 Presentation Strategy The GDE is purposefully constituted as a tri-regional design team whose goal is to produce by 2009 a Technical Design Report (TDR) which will contain a detailed, engineering-based design and cost for the ILC. The initial step towards the TDR was to establish a Reference Design Report (RDR) which will define a self-consistent set of ILC design parameters and associated implementation scope. The RDR also contains an initial estimate of cost at the 20% level which is mostly parametric in nature. This initial cost estimate is at sufficient detail to permit a) trend analysis for cost reduction/optimization and b) give guidance for the R&D and industrialization that must accompany the engineering design process of the TDR.

24 20-Nov-06 FALC - KEK Global Design Effort 24 Cost Review Guideline An international team should be convened prior to completion of the RDR to review those aspects of the RDR cost estimate that strongly influence the TDR. Given the intermediate nature of the RDR estimate as discussed above, it would seem premature to review in detail every aspect of an ILC cost estimate. Rather this review team should: –review cost trends and relative costs of sub-systems as they relate to potential scope changes to be incorporated in the TDR –review cost trends and relative costs of sub-systems and comment on their relevance to the R&D program needed to complete the TDR –review the methodology used in the estimate to ensure that it is appropriate for establishing an accurate TDR cost assessment. Evaluate that the method and format of estimation can serve the needs of regional authorities as they develop plans for potential involvement as partners in the ILC

25 20-Nov-06 FALC - KEK Global Design Effort 25 Siting Aspects of RDR & Candidate Sites

26 20-Nov-06 FALC - KEK Global Design Effort 26 Site Aspects of RDR Three Samples Sites –ILC Conventional Facilities Group: Jean-Luc Baldy (CERN), Vic Kuchler (Fermilab) and Atsushi Enomoto (KEK) + Support Group –Sample Site Analysis - Europe (CERN); Japan (?); US (Fermilab) also, TESLA for reference and Russia unsolicited –Conventional Facilities are expensive! Make narrow definition for “host costs” - goal ~ 25% of total.

27 20-Nov-06 FALC - KEK Global Design Effort 27 Costs by Technical & Global System

28 20-Nov-06 FALC - KEK Global Design Effort 28 Site Aspects of RDR Three Samples Sites –ILC Conventional Facilities Group: Jean-Luc Baldy (CERN), Vic Kuchler (Fermilab) and Atsushi Enomoto (KEK) + Support Group –Sample Site Analysis - Europe (CERN); Japan (?); US (Fermilab) also, TESLA for reference and Russia unsolicited –Conventional Facilities are expensive! Make narrow definition for “host costs” - goal ~ 25% of total. Costing Regional – Best estimates in “own” system of costing. They are close to equal, meaning the RDR siting chapter can concentrate on requirements, technical features, cost drivers, safety issues, other issues etc. Need “true” candidate sites within ~ 1-2 years for realistic engineering design. How do we solicit candidate sites

29 20-Nov-06 FALC - KEK Global Design Effort 29 Coordinating Global R&D

30 20-Nov-06 FALC - KEK Global Design Effort 30 The ‘S’ R&D Task Forces S0 High-Gradient Cavities S1 High-Gradient Cryomodule S2 Test Linac S3 Damping Ring S4 Beam Delivery S5…Sn To address priority R&D items, RDB has convened several ‘task forces’. S0-S3 will report on Friday AM GDE plenary

31 20-Nov-06 FALC - KEK Global Design Effort 31 The ‘S’ R&D Task Forces Addresses current ‘poor’ yield for EP cavities Primary goal: establish parameters for routinely producing 35 MV/m EP’d cavities –required  80% yield S0 High-Gradient Cavities S1 High-Gradient Cryomodule S2 Test Linac S3 Damping Ring S4 Beam Delivery S5…Sn H. Hayano, T. Higo, L. Lilje, J. Mammosser, H. Padamsee, M. Ross, K. Saito

32 20-Nov-06 FALC - KEK Global Design Effort 32 Common Fund Status and FY07 Request

33 20-Nov-06 FALC - KEK Global Design Effort 33 FALC Report – May 06

34 20-Nov-06 FALC - KEK Global Design Effort 34 FALC Report – May 06

35 20-Nov-06 FALC - KEK Global Design Effort 35 FY06FY07FY08 Max, Mora, M&S, Travel, Web$377 Costing Support - 3 FTE$150$300 EDMS Support - 3 FTE$150$300 Meeting Support$50 Unsupported Travel (MAC, etc)$50 Project Manager$100$200 Communications$100 Detector Review (new – extra)$50 TOTAL Central Support Needed$377$1,027$1,427 Can reduce by any offset support from labs DESY EDMS 2FTE($100)($200) TOTAL - Common Fund$377$927$1,250 Projected Budgets

36 20-Nov-06 FALC - KEK Global Design Effort 36 Summary Status of Costing –First costing available at Vancouver (July) –Cost to performance optimization Status & Plans for design modifications –Several proposals accepted and some rejected –Changes having physics impact (Valencia) –Complete RDR by Beijing Meetings Global planning for critical R&D beginning –Formation of ‘S’ task forces

37 20-Nov-06 FALC - KEK Global Design Effort 37 Final Discussion Points Discussion Items –The MAC Review in January? Preview of RDR and Costs or list of items? –Informing ILCSC (Feb 4?) –Informing FALC ? –Strategy for Release – ICFA Feb –International Cost Review (FALC Sponsored?) How are we going to approach getting candidate sites? Who solicits? Common Fund Request