Presentation is loading. Please wait.

Presentation is loading. Please wait.

DTE Hydrogen Technology Park Project. The Project Team:  Ed Chao  Marshall Chase  Kris Jadd  Doug Glancy Advisors:  Dr. Thomas P. Lyon Dow Professor.

Similar presentations


Presentation on theme: "DTE Hydrogen Technology Park Project. The Project Team:  Ed Chao  Marshall Chase  Kris Jadd  Doug Glancy Advisors:  Dr. Thomas P. Lyon Dow Professor."— Presentation transcript:

1 DTE Hydrogen Technology Park Project

2 The Project Team:  Ed Chao  Marshall Chase  Kris Jadd  Doug Glancy Advisors:  Dr. Thomas P. Lyon Dow Professor of Sustainable Science, Technology, and Commerce  Dr. Gregory A. Keoleian Co-Director, Center for Sustainable Systems  Secondary Advisor: Dr. Gautam Kaul, Finance Professor

3 The Client:  DTE Energy’s Technology Investments unit A diversified energy company involved in the development and management of energy- related businesses and services nationwide.  Other participants: US Department of Energy DaimlerChrysler BP

4 What are they doing?  “Distributed Hydrogen Generation” On-site generation of hydrogen, using electricity from the grid and solar cells to split water into hydrogen and oxygen Use hydrogen to fuel vehicles or generate electricity using fuel cells.

5 Hydrogen Fuel Cells

6 Liquid hydrogen storage tank One option: Fuel cell vehicles

7 Why are they looking at hydrogen?  DTE wants to evaluate the feasibility of using hydrogen as an energy carrier. Potential to reduce greenhouse gas emissions and reduce dependence on foreign oil.  Can store electricity from renewable and other sources  Can be used in automobiles to replace gasoline Determine economic viability of the distributed hydrogen generation model. Gain experience in using hydrogen – potential competitive advantage

8 So where’s the problem?  Hydrogen currently isn’t a financially viable alternative to the existing energy and vehicle fueling infrastructure.  But this might change: Many regulatory and market factors affect the viability of a hydrogen infrastructure  Price of oil  Electricity cost differentials  Regulations (RPSes, carbon regulations, etc)

9 Where do we fit in?  Help DTE evaluate two things: What might future regulatory & market landscapes look like? What are the implications of these future scenarios for the viability of DTE’s distributed hydrogen generation model?  Ultimate goals: Decide whether this distribution system has a chance of succeeding in the energy market. Provide DTE with the tools to conduct ongoing evaluations as circumstances change.

10 How? Literature review Interview energy & policy researchers and professionals Define market, policy and other variables likely to affect distributed hydrogen generation Develop set of likely scenarios based on above variables Design software input-output model using the above variables and scenarios to evaluate the financial and competitive viability and environmental impacts of DTE’s proposed stations.

11 Methodology  Phase I: Project inception – May 30 Initial review of existing models in the field Literature review Initial client interviews Site Visit  Phase II: June 1-September 1 Continue interviews and lit. review begin drafting model units and scenarios Deliverable: Initial model units and scenarios for presentation to advisors and client  Phase III: September 1-December 20 Continue drafting model units and fleshing out scenarios Plug scenario variables into models, gather output Draft recommendations based on scenarios and model output Deliverables: Scenarios, models, and draft recommendations to advisors and client  Phase IV: January 2-April 15 Draft reports submitted to advisors and client Revisions as needed Final reports and presentations to client and school Training of DTE representatives to use models

12 Project Roles: Primary client contact: Ed Chao Primary advisor contact: Marshall Team Finances: Kris Information controller: Marshall Team coordinator & meeting planner: Ed Team social chair: Kris

13 Budget  Travel to project site, other DTE facilities, and interview and research sites  Travel to one conference for presentation of results  Telephone calls for interviews & discussions  Data and reference material  Relevant modeling software purchase and training  Opus binding, 7 copies @ $150/copy  Administrative overhead (photocopying, etc)  Total  $500  $1200  $150  $1500  $3000  $1050  $500  $7900

14 Results/Deliverables  Distributed hydrogen energy station evaluation software-based model.  Explanation of scenario forecasts, and discussion of conclusions and recommendations based on those scenarios.  Presentation of the model, scenarios used, and recommendations to DTE representatives.  Presentation and bound paper to fulfill the SNRE Master’s Project academic requirement.


Download ppt "DTE Hydrogen Technology Park Project. The Project Team:  Ed Chao  Marshall Chase  Kris Jadd  Doug Glancy Advisors:  Dr. Thomas P. Lyon Dow Professor."

Similar presentations


Ads by Google