Presentation is loading. Please wait.

Presentation is loading. Please wait.

Engineering H193 - Team Project Spring Quarter 2003 P. 1 Laboratory Quiz, Guidelines for Final Report Draft, Performance Test on Friday Week 5 Day 2.

Similar presentations


Presentation on theme: "Engineering H193 - Team Project Spring Quarter 2003 P. 1 Laboratory Quiz, Guidelines for Final Report Draft, Performance Test on Friday Week 5 Day 2."— Presentation transcript:

1 Engineering H193 - Team Project Spring Quarter 2003 P. 1 Laboratory Quiz, Guidelines for Final Report Draft, Performance Test on Friday Week 5 Day 2

2 Engineering H193 - Team Project Spring Quarter 2003 P. 2 Laboratory Quiz Covers Hands-On Labs Time – Approx 20 Minutes

3 Engineering H193 - Team Project Spring Quarter 2003 P. 3 Draft 1 st Half Final Report Guidelines Prepare a Title Page, Table of Contents, List of Figures, and List of Tables – Page Numbers and Figure Numbers are not required for this draft Do not write an Executive Summary – This will be written when the rest of your team’s report is completed. Write the sections through analysis (Section 6 in Example) Include a List of References – Books, URLs, etc. Put in pages with titles for Appendices that you plan to include

4 Engineering H193 - Team Project Spring Quarter 2003 P. 4 Friday – Flow Chart / Pseudo code Due – Performance Review 3 – Start when LED goes on, maneuver around an obstacle (run into wall, back up, turn) and go up a ramp or steps to Level 2, – Optional Show additional maneuverability (encounter an obstacle on Level 2 and go deal with the obstacle so that your robot can complete the task) This Week


Download ppt "Engineering H193 - Team Project Spring Quarter 2003 P. 1 Laboratory Quiz, Guidelines for Final Report Draft, Performance Test on Friday Week 5 Day 2."

Similar presentations


Ads by Google