Presentation is loading. Please wait.

Presentation is loading. Please wait.

LANE’S BALANCE Construction Phase - Sediment Delivery  Q + S ~ Q s + d s Post-Construction - Sediment Delivery  Q ++ S -- ~ Q s - d s + Incision.

Similar presentations


Presentation on theme: "LANE’S BALANCE Construction Phase - Sediment Delivery  Q + S ~ Q s + d s Post-Construction - Sediment Delivery  Q ++ S -- ~ Q s - d s + Incision."— Presentation transcript:

1

2 LANE’S BALANCE

3

4 Construction Phase - Sediment Delivery  Q + S ~ Q s + d s Post-Construction - Sediment Delivery  Q ++ S -- ~ Q s - d s + Incision and Widening

5

6 Schumm’s River Metamorphosis Response Slope S o Grain Size d 50 Width w Depth d Ratio w/d Meander Wavelength Sinuosity P Q+Q+ - + ++++ Q-Q- + - ---- Q sb + + - +-++- Q sb - - + -+--+ Alteration

7 Schumm’s River Metamorphosis – Part II Response Slope S o Grain Size d 50 Width w Depth d Ratio w/d Meander Wavelength Sinuosity P Q + Q sb + ±±+±++- Q - Q sb - ±±-±--+ Q + Q sb - -+±+±±+ Q - Q sb + +-±-±±- Alteration

8


Download ppt "LANE’S BALANCE Construction Phase - Sediment Delivery  Q + S ~ Q s + d s Post-Construction - Sediment Delivery  Q ++ S -- ~ Q s - d s + Incision."

Similar presentations


Ads by Google