1
Design Engineers: Matthew Den Herder Jason Fullen Daniel Martinez James Sparks Kellyne Winchester Gustavo Barrios Adrian Cedeno Eduardo Ceja German Ontiveros Michael Rueda Dale Steen
2
When will customers find out their critical assets have been compromised? Currently, the condition of an asset during transport is not known until the asset is received and inspected at its final destination The SPARTA team is proposing a special asset tracking system that will immediately alert a Sensor Management Center in the event a sensed parameter is beyond acceptable limits.
5
Overall Dimensions: 203mm x 180mm x 101mm
6
Cutaway Dimensions
7
Overall Dimensions: 90 mm x 90 mm x 35 mm
8
Cutaway Dimensions: 114’’ x 48’’ x 96’’
9
Sensor Node ◦ Power efficient microprocessor MSP-430. ◦ ANT/ANT+ communication Master Node ◦ Sony Experia ARC ◦ Wi-Fi/GSM or Iridium Satellite Sensor Management Center ◦ Receive data from Master Node. ◦ Configurable GUI.
10
Sensor ◦ Sensor node battery beyond 2 months. ◦ Accelerometer ±8 G-force range ◦ Temperature 25C – 85C ◦ Humidity 0 – 100% ◦ Pressure 50-150K Pa, 1K Pa accuracy ◦ Light spectral bandwidth 430 – 610 nm. ◦ Hall effect 50 gauss trip and 5 gauss release ◦ ANT network protocol ◦ Sensor Management Center
11
Research and Hardware Selection Acquisition of Parts Project Proposal Sensors Node Software Development Sensors Node Hardware Design Master Node Software Development Master Node Hardware Design Validation of Components Selected System Integration and Testing Monday September 26, 2011 Monday October 3, 2011 Thursday October 13, 2011 Wednesday November 16, 2011 Wednesday November 18, 2011 Thursday November 18, 2011 Wednesday November 21, 2011 Wednesday November 23, 2011 Wednesday November 30, 2011
12
Design Cost ◦ Hours per Week ◦ Number of Weeks ◦ Hourly Wage
13
System Cost ◦ Sensor Costs ◦ Radio Costs ◦ Cell Phone ◦ Miscellaneous