Design Engineers: Matthew Den Herder Jason Fullen Daniel Martinez James Sparks Kellyne Winchester Gustavo Barrios Adrian Cedeno Eduardo Ceja German Ontiveros.

Similar presentations


Presentation on theme: "Design Engineers: Matthew Den Herder Jason Fullen Daniel Martinez James Sparks Kellyne Winchester Gustavo Barrios Adrian Cedeno Eduardo Ceja German Ontiveros."— Presentation transcript:

1 Design Engineers: Matthew Den Herder Jason Fullen Daniel Martinez James Sparks Kellyne Winchester Gustavo Barrios Adrian Cedeno Eduardo Ceja German Ontiveros Michael Rueda Dale Steen

2  When will customers find out their critical assets have been compromised?  Currently, the condition of an asset during transport is not known until the asset is received and inspected at its final destination  The SPARTA team is proposing a special asset tracking system that will immediately alert a Sensor Management Center in the event a sensed parameter is beyond acceptable limits.

3

4

5 Overall Dimensions: 203mm x 180mm x 101mm

6 Cutaway Dimensions

7 Overall Dimensions: 90 mm x 90 mm x 35 mm

8 Cutaway Dimensions: 114’’ x 48’’ x 96’’

9  Sensor Node ◦ Power efficient microprocessor MSP-430. ◦ ANT/ANT+ communication  Master Node ◦ Sony Experia ARC ◦ Wi-Fi/GSM or Iridium Satellite  Sensor Management Center ◦ Receive data from Master Node. ◦ Configurable GUI.

10  Sensor ◦ Sensor node battery beyond 2 months. ◦ Accelerometer ±8 G-force range ◦ Temperature 25C – 85C ◦ Humidity 0 – 100% ◦ Pressure 50-150K Pa, 1K Pa accuracy ◦ Light spectral bandwidth 430 – 610 nm. ◦ Hall effect 50 gauss trip and 5 gauss release ◦ ANT network protocol ◦ Sensor Management Center

11  Research and Hardware Selection  Acquisition of Parts  Project Proposal  Sensors Node Software Development  Sensors Node Hardware Design  Master Node Software Development  Master Node Hardware Design  Validation of Components Selected  System Integration and Testing  Monday September 26, 2011  Monday October 3, 2011  Thursday October 13, 2011  Wednesday November 16, 2011  Wednesday November 18, 2011  Thursday November 18, 2011  Wednesday November 21, 2011  Wednesday November 23, 2011  Wednesday November 30, 2011

12  Design Cost ◦ Hours per Week ◦ Number of Weeks ◦ Hourly Wage

13  System Cost ◦ Sensor Costs ◦ Radio Costs ◦ Cell Phone ◦ Miscellaneous

14


Download ppt "Design Engineers: Matthew Den Herder Jason Fullen Daniel Martinez James Sparks Kellyne Winchester Gustavo Barrios Adrian Cedeno Eduardo Ceja German Ontiveros."