Presentation is loading. Please wait.

Presentation is loading. Please wait.

M. Vogel SPECTRAP status. Manuel VogelGSI X SPECTRAP.

Similar presentations


Presentation on theme: "M. Vogel SPECTRAP status. Manuel VogelGSI X SPECTRAP."— Presentation transcript:

1 M. Vogel SPECTRAP status

2 Manuel VogelGSI X SPECTRAP

3 Manuel Vogel infrastructure overview UNILAC SIS 400 MeV/u ESR U 92+ Pb 81+ Bi 80,82+ 4 MeV/u Electron cooling and deceleration Stripper target Post decelerator Cooler trap Experiments with cold ions 10 5 cold highly charged ions every 10 s HITRAP

4 Manuel Vogel closer look: deceleration

5 Manuel Vogel future experimental area

6 Manuel Vogel SPECTRAP platform

7 Manuel Vogel client experiments: arrangement SPECTRAP g-factor setup offline source H1 H5 H2

8 Manuel Vogel setup overview (schematic)

9 Manuel Vogel new trap

10 Manuel Vogelyesterday

11 damage

12 "clean room"


Download ppt "M. Vogel SPECTRAP status. Manuel VogelGSI X SPECTRAP."

Similar presentations


Ads by Google