Presentation is loading. Please wait.

Presentation is loading. Please wait.

GLAST LAT Project I&T Integration Kickoff Meeting 03/09/04 Online 1 GLAST Large Area Telescope: I&T Integration Kickoff Meeting EGSE Hardware March 9th,

Similar presentations


Presentation on theme: "GLAST LAT Project I&T Integration Kickoff Meeting 03/09/04 Online 1 GLAST Large Area Telescope: I&T Integration Kickoff Meeting EGSE Hardware March 9th,"— Presentation transcript:

1 GLAST LAT Project I&T Integration Kickoff Meeting 03/09/04 Online 1 GLAST Large Area Telescope: I&T Integration Kickoff Meeting EGSE Hardware March 9th, 2004 Ric Claus SU-SLAC Online Department Manager claus@slac.stanford.edu 650-926-3480 Gamma-ray Large Area Space Telescope

2 GLAST LAT Project I&T Integration Kickoff Meeting 03/09/04 Online 2 Single Tower EGSE Processor: Motorola Power-PC Flight Software PMCIA LAT Communication Board for –LAT Communication Transition Board –Trigger TEM DAQ Assembly TEM Power-Supply Assembly 28-V Supply LAT-TD-00861 Tower Power Supply Assembly (1.5V/2.5V/3.3V/ 0-100V/0-150V) TEM DAQ Assembly LCB: LAT Communication Module Transition-card: Trigger Module 28-V Power Supply Power-PC Processor Flight Software

3 GLAST LAT Project I&T Integration Kickoff Meeting 03/09/04 Online 3 Test Stand Definitions

4 GLAST LAT Project I&T Integration Kickoff Meeting 03/09/04 Online 4 AEM/TEM Single Tower EGSE Configuration (TS-1 / 2a) VME Chassis LAT-COMM External Trigger Electronics/Online Subsystem/simulator Subsystem (or simulator) Ethernet Router and Firewall Ethernet Main Dataflow Ethernet Back door debug RS-232 WAN Online Workstation Test Exec Configuration Commanding Telemetry Event Processing Monitoring Visualization Data base Message logger Alerts Electronic log CPU Commanding Telemetry Monitoring Hardware Drivers Central Database DC Power External Hardware

5 GLAST LAT Project I&T Integration Kickoff Meeting 03/09/04 Online 5 T&DF System (LAT)EGSE AEM CPU LCB EGSE Crate WAN Central Database GASU CAL, TKR or Sensor Simulator ACD or Sensor Simulator Online Workstation TEMs SLAC GEM EBM Firewall 28 V Supply VME Multi-Tower EGSE (TS-2b)

6 GLAST LAT Project I&T Integration Kickoff Meeting 03/09/04 Online 6 LATEGSE LAT Assembly Configuration (TS-3x) AEM CPU 1553 LCB SIU LCB EGSE Crate CPU LCB 3 EPUs WAN Central Database GASU Test Point on LAT EMI Skirt CAL, TKR or Sensor Simulator ACD or Sensor Simulator Online Workstation TEMs SLAC GEM CPU EBM Firewall SSR Spacecraft simulator 1553 Discretes 28 V Supply

7 GLAST LAT Project I&T Integration Kickoff Meeting 03/09/04 Online 7 LATEGSE Complete Flight Unit Configuration (TS-4x) AEM CPU 1553 LCB SIU LCB EGSE Crate CPU LCB 3 EPUs WAN Central Database GASU Test Point on LAT EMI Skirt CAL, TKR ACD Online Workstation TEMs SLAC GEM CPU EBM Firewall SSR 1553 Discretes Spacecraft simulator 28 V Supply

8 GLAST LAT Project I&T Integration Kickoff Meeting 03/09/04 Online 8 LAT Flight Unit On-Orbit Configuration AEM CPU 1553 LCB SIU CPU LCB 3 EPUs WAN Central Database GASU Test Point on LAT EMI Skirt (Flight cover installed - Green Tag item) CAL and TKR ACD IOC Workstation SSR TEMs SLAC GEM Spacecraft EBM 1553 Discretes 28 V Supply Firewall MOC

9 GLAST LAT Project I&T Integration Kickoff Meeting 03/09/04 Online 9 Test Stand vs Test

10 GLAST LAT Project I&T Integration Kickoff Meeting 03/09/04 Online 10 EGSE Need Milestones This item includes an EM-2 TEM, a TEM Power Supply, a Crate Test System with LCB and Front-end Electronics (shared). It is to be used by Ric Claus for development of Online software. This item includes an EM-2 TEM, a TEM Power Supply, a Crate Test System with LCB and Front-end Electronics (shared). It is to be used by Selim Tuvi for development of Online software. This item includes an EM-2 TEM, a TEM Power Supply, a Crate Test System with LCB and Front-end electronics (shared). It is is to be used by Jim Panetta for development of Online software. This item includes a Crate Test System, an EM GASU and Front-end Electronics (shared). It is to be used by Ric Claus for development of Online software. This item includes an Early Release of Flight Software and Hardware interfaces. It is to be used by Ric Claus for development of Online software for full LAT testing through SIU. This item includes an EM-2 TEM, a TEM Power Supply, a Crate Test System with LCB. It is to be used in the building 33 room 103 Integration Test Facility. This item includes a Crate Test System with LCB, EM GASU and EM PDU. It is to be used in the building 33 room 104 Integration Test Facility for single and multi- tower tests during integration.


Download ppt "GLAST LAT Project I&T Integration Kickoff Meeting 03/09/04 Online 1 GLAST Large Area Telescope: I&T Integration Kickoff Meeting EGSE Hardware March 9th,"

Similar presentations


Ads by Google