Presentation is loading. Please wait.

Presentation is loading. Please wait.

Opening Ceremony GSZo&safe=active Flight over the site under construction

Similar presentations


Presentation on theme: "Opening Ceremony GSZo&safe=active Flight over the site under construction"— Presentation transcript:

1 Opening Ceremony http://www.youtube.com/watch?v=7QL_uG2 GSZo&safe=active Flight over the site under construction http://www.youtube.com/watch?v=C0pXZTz NVAc&safe=active Olympic Village Guided Tour http://www.youtube.com/watch?v=ujQsoimky _w&safe=active

2 Figure 1 – A 2012 Games Factfile

3 Figure 2 – A map of the UK showing the 20 venues

4 Figure 3a – Map of Olympic Park venues in east London

5 Figure 3b – The location of the Olympic Park

6 Figure 3c – An image of the Olympic Park and beyond looking south

7 Figure 4 – Map showing the underground (tube) and surface rail network of Stratford in east London

8 Figure 5 – The age-sex structure of Newham’s population compared to the UK, 2001

9 Figure 6 – The ethnic structure of Newham compared to England in 2006

10 Figure 7 – Deprivation in Newham compared to the least and most deprived areas of England and Wales, 2008

11 Figure 8 – How incomes in Newham (shown by the arrow) compare with the rest of England and Wales, 2008 Figure 9a – Employment status in Newham, 2001 Figure 9b – Employment type in Newham, 2001

12 Figure 10 – The % of the population with no educational qualifications, 2001

13 Figure 11 – Forman’s smoked salmon factory in 2007, now demolished

14 Figure 12 – Forman’s replacement factory, overlooking the new Olympic Stadium

15 Figure 13 – Protest in 2006 outside a business on the site of the new Olympic Stadium

16 Figure 14 – The old Hackney Stadium, a former greyhound stadium, and used as a bus depot until 2007. It was cleared to make way for the new Hockey Stadium

17 Figure 15 – An abandoned factory which had to be cleared for the new Olympic Park

18 Figure 16 – Building the Olympic Stadium – a boom for construction jobs

19 Figure 17 – Housing tenure in Newham, 2001

20 Figure 18 – Housing in Newham

21 Figure 19 – Student halls of residence in Clays Lane in 2007 before clearance

22 Figure 20 – The travellers’ site at Clays Lane in 2007 before clearance

23 Figure 21 – Clays Lane Community Housing (2007) before clearance. As residents moved out, windows were boarded up

24 Figure 22 – Clays Lane – one resident’s story of being moved

25 Figure 23 – Government assessment of housing deprivation in Newham (shown by the arrow) compared to the rest of England and Wales, 2008

26 Figure 24 – Some of the new flats built by private developers since 2005

27 Figure 25 – Waste dumping ground before clearance

28 Figure 26 – Electricity pylons before power lines were buried underground

29 Figure 27 – An artist’s image of the Olympic Park after 2012

30 Figure 28 – The Olympic Stadium roof – made out of unwanted gas pipelines

31 Figure 29 – Your assessment of how well London is meeting the aims for sustainability of the 2012 Games

32

33

34 Proposal - page 1 Outline you and your company: We would like to know what background you have and why you and your company might be of interest to the committee

35 Proposal - page 2 The site location: Describe the site location in relation to the UK and London. Use maps and images to help you

36 Proposal - page 3 Background Newham/Stratford: Use the booklet provided and outline what you see as the key areas that need to be tackled when redeveloping the Olympic Site

37 Proposal page 4 Your Vision: Decide what option your company will opt for (Booklet page 27 option 4,5,6) Tell the committee why your chosen option is ‘best’ for the legacy of the Olympic Site.

38 The proposal needs to be printed in colour and submitted in an envelope to your teacher. The committee expects there to be a great deal of interest in the venture so think how your proposal will differ from the rest.

39 Resources: http://blog.ordnancesurvey.co.uk/wp- content/uploads/2010/11/olympic_site_map -low-resolution.pdfhttp://blog.ordnancesurvey.co.uk/wp- content/uploads/2010/11/olympic_site_map -low-resolution.pdf http://www.eastvillagelondon.co.uk/we-are- london.aspxhttp://www.eastvillagelondon.co.uk/we-are- london.aspx http://www.edexcel.com/migrationdocumen ts/GCSE%20New%20GCSE/5GB3%20Jun e%202012%20Resource%20Booklet.pdfhttp://www.edexcel.com/migrationdocumen ts/GCSE%20New%20GCSE/5GB3%20Jun e%202012%20Resource%20Booklet.pdf


Download ppt "Opening Ceremony GSZo&safe=active Flight over the site under construction"

Similar presentations


Ads by Google