Presentation is loading. Please wait.

Presentation is loading. Please wait.

Circulation Solutions that Preserve the Current Dinky Terminus Alain L. Kornhauser 24 Montadale Circle Princeton Township.

Similar presentations


Presentation on theme: "Circulation Solutions that Preserve the Current Dinky Terminus Alain L. Kornhauser 24 Montadale Circle Princeton Township."— Presentation transcript:

1 Circulation Solutions that Preserve the Current Dinky Terminus Alain L. Kornhauser 24 Montadale Circle Princeton Township

2 View in “Slide Show” mode There are a substantial number of important animations

3

4 z 100% 30% 70% Road Flow North-Bound Alexander Road Flow North-Bound Alexander

5 100% 50% Road Flow South-Bound Alexander Road Flow South-Bound Alexander

6 Congestion @ Alexander & University Place

7 Solution: One – Way Flow Solution: One – Way Flow

8 Flow Pattern @ Alexander & University Pl.

9 Minimal Conflicts; Readily Accommodates Pedestrians Minimal Conflicts; Readily Accommodates Pedestrians

10 Before - After Traffic Flow Impacts: NB Alexander – RT University (Largest Flow) Before - After Traffic Flow Impacts: NB Alexander – RT University (Largest Flow) Before 70% 100% No Change! 100% 70% After

11 Before - After Traffic Flow Impacts: NB Alexander – RT Mercer (Largest Flow) Before - After Traffic Flow Impacts: NB Alexander – RT Mercer (Largest Flow) 100% 15% Before 15% After Incr. NB Univ Decr. NB Alex. & Mercer 100% Before - After Traffic Flow Impacts: NB Alexander – RT Mercer Before - After Traffic Flow Impacts: NB Alexander – RT Mercer

12 Before - After Traffic Flow Impacts: NB Alexander – RT Mercer (Largest Flow) Before - After Traffic Flow Impacts: NB Alexander – RT Mercer (Largest Flow) 100% ~ 10% Before 7.5% After Incr.: NB Univ &WB College & Mercer Decr.: NB Alex. Decr.: NB Alex. 100% 15% ~ 5% 7.5% 2.5% Before - After Traffic Flow Impacts: NB Alexander – LT College or Mercer Before - After Traffic Flow Impacts: NB Alexander – LT College or Mercer

13 Incr.: SB Alex. &WB College Decr.: SB Univ. Decr.: SB Univ. Before - After Traffic Flow Impacts: SB University Before - After Traffic Flow Impacts: SB University 50% 100% Before 50% After 100%

14 Before - After Traffic Flow Impacts: SB Alexander Before - After Traffic Flow Impacts: SB Alexander No Change! 50% 100% Before 50% After 100%

15 Before - After Traffic Flow Impacts: Combined Before - After Traffic Flow Impacts: Combined

16 Endangered?

17 50% Walk & Ride ~500 patrons/day 50% Walk & Ride ~500 patrons/day 43/150 Solid Top 30%

18 Preferred Dinky Terminus

19 Kiss& Ride FreeB, taxi ~10 62 32 25 26 ~7 On-street: ~100 Small lot: ~62 Commute Lot : ~150 Total: ~340 Yield: ~375 Boarders/day; ~680 McCarter Patrons On-street: ~100 Small lot: ~62 Commute Lot : ~150 Total: ~340 Yield: ~375 Boarders/day; ~680 McCarter Patrons 62 Baker surface lot 62 Baker surface lot ~150 (Commuter Lot) ~150 (Commuter Lot) 178 (Each Floor of Lot 7) 178 (Each Floor of Lot 7) Existing Dinky Parking Dinky / McCarter Parking

20 East-West Pedestrian Flow

21 At-grade Xings ??? At-grade Xings ???

22 East-West Pedestrian and Vehicular Flow

23 Thank You

24


Download ppt "Circulation Solutions that Preserve the Current Dinky Terminus Alain L. Kornhauser 24 Montadale Circle Princeton Township."

Similar presentations


Ads by Google