Presentation is loading. Please wait.

Presentation is loading. Please wait.

- CENTRU DE RESURSE GRID 05.12.2008 ICI - Bucharest 1 Grid site RO-12-ICI Grid site RO-12-ICI Bildea Ana ICI Bucharest, December 5, 2008.

Similar presentations


Presentation on theme: "- CENTRU DE RESURSE GRID 05.12.2008 ICI - Bucharest 1 Grid site RO-12-ICI Grid site RO-12-ICI Bildea Ana ICI Bucharest, December 5, 2008."— Presentation transcript:

1 - CENTRU DE RESURSE GRID 05.12.2008 ICI - Bucharest 1 Grid site RO-12-ICI Grid site RO-12-ICI Bildea Ana ICI Bucharest, December 5, 2008

2 - CENTRU DE RESURSE GRID Overview of RO-12-ICI (1)   RO-12-ICI - member of EGEE  lcg-CE glite-TORQUE_utils, glite-TORQUE_server, BDII_site, glite-MON, glite-WN, glite-MON,Glite-UI  Services : glite-SE DPM, lcg-CE glite-TORQUE_utils, glite-TORQUE_server, BDII_site, glite-MON, glite-WN, glite-MON,Glite-UI   Others VO's:Ops, Seegrid, Dteam   1 LHC VO's: LHCb

3 - CENTRU DE RESURSE GRID Overview of RO-12-ICI (2)   7 Server SUN Fire X4100 ( dual procesor AMD Opteron X64 2.6 Ghz )   14 CPU   Storage capacity – 2 TB   Direct connection to the ICI-RNC backbone at 1 Gbps   100 Mbps connectivity between ICI and RoEduNet   10 Mbps back-up between ICI and Telecom INES   air conditioning with redundant power total of 100,000 BTU   UPS ≈ 30KW

4 - CENTRU DE RESURSE GRID What happened in the last year?   upgrade from O.S. - SLC 3.0.8 to O.S. - SLC 4.6   software upgrade from gLite 3.0 to gLite 3.1   site testing   renewing the site certificates

5 - CENTRU DE RESURSE GRID Grid view of RO-12-ICI

6 - CENTRU DE RESURSE GRID Visibility of RO-12-ICI list : Sam admin list:

7 - CENTRU DE RESURSE GRID Response time

8 - CENTRU DE RESURSE GRID GStat: RO-12-ICI 12/03/08 GMT

9 - CENTRU DE RESURSE GRID RO-12-ICI report

10 - CENTRU DE RESURSE GRID Future plans Hardware & software upgrade :  To became member with all rights in LHCb VO  To extend the site from 7 servers to 15 servers(17 Server SUN Fire X4100 )-30 CPU  To install another : 8 WN (SLC 4.7, GLite 3.1 )  Migrate with all WNs to SLC 4.7  Changing the RO-12-ICI status from “candidate” to “production”  Increase the Storage capacity - 40 TB  1 Gbps connectivity between ICI and RoEduNet

11 - CENTRU DE RESURSE GRID RO-12-ICI GRID resources

12 - CENTRU DE RESURSE GRID Thank you !


Download ppt "- CENTRU DE RESURSE GRID 05.12.2008 ICI - Bucharest 1 Grid site RO-12-ICI Grid site RO-12-ICI Bildea Ana ICI Bucharest, December 5, 2008."

Similar presentations


Ads by Google