Presentation is loading. Please wait.

Presentation is loading. Please wait.

1 News from ELAN SC of CARE Paris Sept 5 2005. 2 News from ILC  GDE structure founded under B. Barish: 3 GDE regional Directors + ~40 CORE team (4 from.

Similar presentations


Presentation on theme: "1 News from ELAN SC of CARE Paris Sept 5 2005. 2 News from ILC  GDE structure founded under B. Barish: 3 GDE regional Directors + ~40 CORE team (4 from."— Presentation transcript:

1 1 News from ELAN SC of CARE Paris Sept 5 2005

2 2 News from ILC  GDE structure founded under B. Barish: 3 GDE regional Directors + ~40 CORE team (4 from ELAN managt) under ILCSC ‘oversight’  Snowmass meeting (ALCPG->Intal) 2 weeks in August to reach ILC configuration - Physics (Aspen), Detector, Accelerator (after KeK) - Physics (Aspen), Detector, Accelerator (after KeK) - 640 participants (1/3 machine) - 640 participants (1/3 machine) - 10 critical recommendations/decisions - 10 critical recommendations/decisions  EUDET: I3 for detector approved 7 M€ 21 partners

3 3 GDE – Staffing  Staff the GDE Administrative, Communications, Web staff Administrative, Communications, Web staff Regional Directors (one per region) Regional Directors (one per region) Accelerator Experts (covering all technical areas) Accelerator Experts (covering all technical areas) Senior Costing Engineer (one per region) Senior Costing Engineer (one per region) Civil/Facilities Engineer (one per region) Civil/Facilities Engineer (one per region) Detectors (WWS chairs) Detectors (WWS chairs) Fill in missing skills (later) Fill in missing skills (later)  Total staff size about 20 FTE (2005-2006) about 40 heads.  The internal GDE organization and tasks will be organized internationally, not regionally

4 4 GDE – Near Term Plan  Schedule Begin - define Configuration (Snowmass Aug 05)Begin - define Configuration (Snowmass Aug 05) Baseline Configuration Document (end of 2005)Baseline Configuration Document (end of 2005)----------------------------------------------------------------------- Baseline under Configuration Control (Jan 06)Baseline under Configuration Control (Jan 06) Develop Reference Design (end of 2006)Develop Reference Design (end of 2006) Coordinate the supporting R&D programCoordinate the supporting R&D program  Three volumes -- 1) Reference Design Report; 2) Shorter glossy version for non-experts and policy makers ; 3) Detector Concept Report

5 5 The GDE Plan and Schedule 2005 2006 2007 2008 2009 2010 Global Design EffortProject Baseline configuration Reference Design ILC R&D Program Technical Design Bids to Host; Site Selection; International Mgmt LHC Physics

6 6 ELAN and ILC  Support relevant for European WS with acknowledgement of ELAN support (logo) Document(s) ELAN issued Document(s) ELAN issued  List in http://esgard.lal.in2p3.fr/Project/Activities/Current/Networking/N2/ELAN/Workshops/  Support for international (ILC) meetings: LCWS05 (MDI, ACCEL)+SNOWMASS LCWS05 (MDI, ACCEL)+SNOWMASS

7 7 Workshops Supported by ELAN 2005 WIGGLE2005WIGGLE2005 - Mini-Workshop on Wiggler Optimization for Emittance Control WIGGLE2005 21 - 22 February Frascati, Italy Metrology and StabilisationMetrology and Stabilisation - for Linear Colliders Workshop Metrology and Stabilisation 10 - 11 March LAPP, Annecy le Vieux, France LCWS05LCWS05 - International Linear Collider Workshop LCWS05 18 - 22 March Stanford, USA TESLA Collaboration Meeting 30/3 - 1/4/2005 DESY, Germany Positron Sources for International Linear Collider Positron Sources for International Linear Collider 11 - 13 April Daresbury, UK HEEAUP2005HEEAUP2005 - International Workshp on High Energy Electron Acceleration Using Plasmas 2005 HEEAUP2005 8 - 10 June Institut Henri Poincaré, Paris, France ILC-BDIRILC-BDIR London Beam Delivery Systems ILC-BDIR 20 - 23 June London, UK The 2005 International Linear Collider Physics and Detector Workshop and Second ILC Accelerator Workshop The 2005 International Linear Collider Physics and Detector Workshop and Second ILC Accelerator Workshop 14 - 27 August Snowmass, Colorado, USA

8 8 ILC-WWSnowmass E+ Sources DaresburyDoc-05-06Doc-05-07 DRFrascatiDoc-05-12 TTC SR Techno DESYDoc-05-09 LCWS05MDIStanfordDoc-05-05ILC-RegionalLondon ELAN Plenary + 4 Parallel Metrology & StabilisationAnnecy SRF WS CornellOutreach

9 9 Main decisions/recommendations 1 beam and luminosity parameters 2 main linac starting gradient, upgrade gradient, and upgrade path 3 straight or follow earth's curvature? 4 1 or 2 IRs, if two, run interleaved? 5 1, 1.5, or 2 tunnel 6 DR size and shape 7 e+ source type conv/undulator/Compton 8 is there an e+ pre damping ring 9 DR location: 1st half tunnel, 2nd half, ceiling, under cryomodules, separate tunnel 10 cavity shape/material/processing

10 10 1.3GeV S-band linac 180 m laser-Compton ring ~100 MeV Accumulator Ring pol. e+ ~100 MeV Accumulator Ring pol. e- to 5 GeV ring to 5 GeV ring Polarized e+/e- source based on Compton back scattering T. Omori, J. Urakawa, KEK K. Moenig, A. Variola, F. Zomer, LAL P. Raimondi Frascati accumulate >100 bunchlets to make nominal bunch; →needs large-acceptance accumulator ring & fast cooling J. Urakawa  highly polarized e + and e - (>90%);  generation decoupled from collider ATF proof-of-principle experiment produced ~10 4 pol. e+ per pulse Frank Zimmermann, CERN LP05

11 11 Cavity shape/material/processing  Summary Talk London (L. Lilje) https://ilcsupport.desy.de/cdsagenda/askArchive.php?base=agenda &categ=a0522&id=a0522s53t3/transparencies/Summary_of_SRF_ WG_LL_.pdf https://ilcsupport.desy.de/cdsagenda/askArchive.php?base=agenda &categ=a0522&id=a0522s53t3/transparencies/Summary_of_SRF_ WG_LL_.pdf  BCD Proposal for Cavity preparation (short) http://alcpg2005.colorado.edu:8080/alcpg2005/program/accelerator/ WG5/helen_edwards20050821164419.ppt http://alcpg2005.colorado.edu:8080/alcpg2005/program/accelerator/ WG5/helen_edwards20050821164419.ppt  BCD Proposal for Cavity preparation (long) http://alcpg2005.colorado.edu:8080/alcpg2005/program/accelerator/ WG5/helen_edwards20050819140512.ppt http://alcpg2005.colorado.edu:8080/alcpg2005/program/accelerator/ WG5/helen_edwards20050819140512.ppt

12 12 Next steps  European GDE meeting in Oxford  GDE meeting in Frascati to finalize decisions for the baseline -> ELAN support is asked by the B. Foster  Prepare for FP7  Contribute to ILC outreach (presentation L. Lilje at Cornell & Snowmass)

13 13 Outreach and Tutorials supported ELAN  Snowmass SRF Cavity tutorial (L. Lilje) http://alcpg2005.colorado.edu:8080/alcpg2005/program/ENO/Super conductingcavitiestutorial_new.pdf http://alcpg2005.colorado.edu:8080/alcpg2005/program/ENO/Super conductingcavitiestutorial_new.pdf  Srf Tutorials at SRF 2005 Workshop WWW-Link: http://www.lns.cornell.edu/public/SRF2005/ Workshop WWW-Link: http://www.lns.cornell.edu/public/SRF2005/  Tutorial session on Sunday: http://www.lns.cornell.edu/public/SRF2005/program.html http://www.lns.cornell.edu/public/SRF2005/program.html  Especially talk by D. Reschke on cleaning (paid by ELAN): http://www.lns.cornell.edu/public/SRF2005/talks/sunday/SuP03_talk _srf2005.pdf http://www.lns.cornell.edu/public/SRF2005/talks/sunday/SuP03_talk _srf2005.pdf

14 14 ELAN Management  New adsociates - US: SLAC (M. Ross) - US: SLAC (M. Ross) - Technion (S. Tarem) - Technion (S. Tarem) - Center for the Advancement of Natural Discoveries using Light Emission, Yerevan, Armenia - Center for the Advancement of Natural Discoveries using Light Emission, Yerevan, Armenia - Cracow University of Technology, (Institute of Applied Mechanics), Krakow, Poland - Cracow University of Technology, (Institute of Applied Mechanics), Krakow, Poland - University of Ankara (K. Ciftci) - University of Ankara (K. Ciftci)  Support ICFA school on ILC ?  ANAD has launched a NEST proposal 1st level selection level selection EUROLEAP: European Laser Electron controlled Acceleration in Plasmas to GeV energy range EUROLEAP: European Laser Electron controlled Acceleration in Plasmas to GeV energy range

15 15 HEEAUP 2005 Paris

16 16

17 17 ELAN Documents

18 18 Conclusion  ELAN activity is mainly driven by the international GDE (WG 3-4)  ELAN support has been instrumental in preparing and supporting the Snowmass meeting  European support has been essential and should be maintained within FP7 should be maintained within FP7  Interesting prospects of collaboration with the laser-plasma community

19 19 From ECFA (T.A.)  ICFA beam dynamics panel, Weiren Chou, European co-sponsoring of a linear collider (more specifically ILC) school in spring 2006 in Japan. He has contacted Japan (JSPS) and the USA (DOE) about co-sponsoring and sent a mail to T.A. about "which European agency to contact". Quantitatively we talk about (JSPS) and the USA (DOE) about co-sponsoring and sent a mail to T.A. about "which European agency to contact". Quantitatively we talk about 40-55'000 euros, assuming 20-25 students and 6-8 lecturers from Europe. 40-55'000 euros, assuming 20-25 students and 6-8 lecturers from Europe.

20 20

21 21 Doc-05-09 Snowmass+Report Cornell WS Snowmass

22 22 London+Snowmass Report expected Paris meeting Euroleap


Download ppt "1 News from ELAN SC of CARE Paris Sept 5 2005. 2 News from ILC  GDE structure founded under B. Barish: 3 GDE regional Directors + ~40 CORE team (4 from."

Similar presentations


Ads by Google