Some beam tuning musings from Fall 2004 runs David Hertzog.

Similar presentations


Presentation on theme: "Some beam tuning musings from Fall 2004 runs David Hertzog."— Presentation transcript:

1 Some beam tuning musings from Fall 2004 runs David Hertzog

2 Profiles of unkicked and kicked beam using MuCap setup prior to MuLan run (down kick) ELog 331

3 Reminder: extinction plot Separator not tuned, first part of kick recenters beam Tail indicates new source, not central beam

4 Airscan study using MuCap ePCs and Tom ELog 344 P = 1.05 P  P = 1.04 P  P = 1.03 P  P = 1.02 P  P = 1.01 P  P = 1.00 P  P = 0.99 P  P = 0.98 P 

5 Airscan Key Result: low-momentum sneaky muons ELog 344 Notable result unrelated to low-side of momentum distribution is in final two entries of table and final two figures. Notice the unkicked vs. kicked stopping distribution of the muons. The unkicked muons, at 1.05P_mu, almost all go through the 75 um window, 250 um muSC, muPC, about 50 cm air (to be measured), and stop in the target. BUT, when kicked, essentially NONE reach the target; the stopping distribution peaks about 20 cm of air before the target. Thus, when we kick, we really do extinguish the "main" muons in our beam and what sneaks through seems to be a source of lower- momentum muons from who-know- where. We need to think about this.

6 Airscan Key Result: low-momentum sneaky muons ELog 344 No kick (P=1.05 P  ) Kick 1.02 P 

7 Setup the beamline first “as it was” DAY 1 –Install beamline to the normal end Should have our best understood focus here from last time Get direct T0500 to work at rates below 5 MHz –Make horizontal e decay telescope –Get rate established and general spot Careful job of B2/B1 with no SEP on Careful job of setting SEP-B with 190 kV on Check kicker with full voltage and establish FOM “EXTINCTION” Q8Q9SEP KICKER T1 X S3 EMC T1

8 Make the momentum sweep here to look for the low-momentum tails DAY 2 –90˚ decay rate vs. momentum sweep of beam Thin foil stops narrow momentum bite Q8Q9SEP KICKER T1 X S3 T1 20-40  m mylar Beam Tune DACs x f Rate

9 Determine if Slit 1 is at all dispersive DAY 2 –90˚ decay rate vs. momentum sweep of beam Thin foil stops narrow momentum bite Q8Q9SEP KICKER T1 X S3 T1 20-40  m mylar Beam Tune DACs x f Rate 300 200 100

10 Find and kill low-momentum “kicked” component DAY 3 –A variety of changes to the setup will now take place –Kicker / Sep swap –Slit 4 upstream of Kicker Q8Q9SEP KICKER T1 X S3 T1 20-40  m mylar Beam Tune DACs x f Rate Unkicked Kicked S3 Slit 4

11 And lots more, not yet typed up …

12 Calendar MTWTWSSMTWTWSS

13 Setup implications for June EMC must work reliably from “day 1” –It must be able to be “free mounted” on a stick to move around, or some other provision to hang it in different places like the SWIC Mu decay telescope built with shielding for narrow view – scaler readout implied Beam magnet sweeps vs. scaler readout must work XY Scanner and scintillators a likely option for big-beam scans (end of kicker, where beam is larger than EMC) Kicker on in DC mode like we had in tests during MuCap parasitic time (Anatoly set this up) HV, other counters, scopes, alignment,.. normal things

14 MuLan Power Francoisefull time David W June 1 – run end Dave H June 6 – 23 Peter June _6_ - 17 th ? Paul June _6_ - __ Gerco June 6 – 15 ? RobJune __ - __ AnatolyMay __ - ___ Dan tentative if needed

15 Gerco’s initial polarization calculation Elog 942 / Analysis Lots of these plots. Bottom line. Spin points upstream as expected, with perhaps a slight tilt down but within uncertainties we cannot tell for sure

16 Wild ideas and beamline tests to consider Remove Triplet 1 and work in that space We need parallel beam thru kicker –Optimize Q8Q9 into EMC (too small?) with/without vac extension. Could use XY Scanner with two small scintillators –Do this with/without the two collimator plates in the kicker –Can we use 2 chambers (Johnny chamber + EMC?) –Can we stand the rate here? –We should do this for a full suite of upstream S1/S2 slit sittings Q8Q9SEP KICKER X Q8Q9SEP KICKER X vac EMC collimators