Presentation is loading. Please wait.

Presentation is loading. Please wait.

BUILDING STRONG SM Los Angeles District American Council of Engineering Companies Briefing by COL Thomas H. Magness District Commander Los Angeles District.

Similar presentations


Presentation on theme: "BUILDING STRONG SM Los Angeles District American Council of Engineering Companies Briefing by COL Thomas H. Magness District Commander Los Angeles District."— Presentation transcript:

1 BUILDING STRONG SM Los Angeles District American Council of Engineering Companies Briefing by COL Thomas H. Magness District Commander Los Angeles District US Army Corps of Engineers 22 JULY 2009 Title Page

2 BUILDING STRONG SM Los Angeles District 226,000 square miles Provides support to 8 million acres of military installations 80,000 acres of USACE project properties 420 miles of shore line / 14 harbors ENVIRONMENTAL “EXTREMES” ( in contiguous 48 states ) : Hottest and Driest Locations ( Death Valley ) Highest Elevation - Mount Whitney ( 14,494 feet above sea level ) Lowest Elevation - Bad Water, Death Valley ( 282 feet below sea level ) Critical Habitat / Biodiversity ( 385 Threatened / Endangered Species ) 30 Million people ( 1 in 10 Americans ) Population growing by 500,000 annually 3 of 7 Most Populated US cities ( Los Angeles / San Diego / Phoenix ) 8 U.S. SEN / 44 U.S. REP / 4 GOV World’s 8th largest economy ( > Canada / Spain ) CA ports = 40% US trade by volume Ports of LA / Long Beach = US No. 1 and 3 LA Customs = US No. 1 ( $300 BIL annually ) LA Metro = US No. 1 manufacturer ( employment ) Navigation Flood Control Engineering Design Military Construction Emergency Operations ( PL 84 – 99 ) Environmental Restoration Regulatory Permitting ( § 404, Clean Water Act ) International and Interagency Support Overseas Contingency Operations / Homeland Security Civil Works Military Army Installation Air Force Installation Area Office Resident Office OREGON IDAHO WYOMING COLORADO NEVADA NEW MEXICO TEXAS UTAH ARIZONA CALIFORNIA

3 BUILDING STRONG SM Los Angeles District Davis-Monthan AFB Fort Huachuca Military Program FY08 = $ 362.7M FY09 = $ 380.1M Army ‘08 = $ 178.7M Army ’09 = $ 82.6M Operations & Maint = $99.6M Environmental = $ 27.4M Air Force ‘08 = $ 112.5M Air Force ’09 = $ 170.5M

4 BUILDING STRONG SM Los Angeles District Construct Barracks w/Co Ops Facility –$12M - $22M –MATOC/Unrestricted (Barracks) –8(a) Competitive (COF) –4th QTR/FY09 Repair Barracks Bldg 264 –$2.5M - $3.5M –POCA –4 th QTR/FY09 Repair Barracks Bldg 261 –$1.5M - $2M –POCA –4 th QTR/FY09 Return Fort Irwin Repair Chilled/Hot Loop Feed System –$1.5M - $2M –POCA –4th QTR/FY09 Repair Athletic Center –$500K - $1M –POCA –4 th QTR/FY09 Repair Road Shoulders –$500K - $1.5M –POCA –4 th QTR/FY09

5 BUILDING STRONG SM Los Angeles District Repair Fence & Install Cable Barrier at Coast Gate –$50K - $100K –POCA –4 th QTR/FY09 Replace Water Line –$1.5M - $2M –POCA –4 th QTR/FY09 Replace HVAC –$500K - $1M –POCA –4 th QTR/FY09 Vandenberg AFB Replace Water System –$2M - $3M –DB –4 th QTR/FY09 Replace Water Line –$1M - $2M –POCA –4 th QTR/FY09 Maintain Backflow Prevention Devices Basewide –$100K - $200K

6 BUILDING STRONG SM Los Angeles District Lighting System – Sensors (ECIP) –$1.5M –SB-Set-Aside –4 th QTR/FY09 High Speed Gravel Test –$5M –SB-Set Aside –3rd QTR/FY09 Security & Safety Improvements –$1M - $3M –SB-Set Aside –3rd QTR/FY09 Yuma Proving Grounds

7 BUILDING STRONG SM Los Angeles District Fire/Crash Rescue Station –$10M - $20M –SB-Set-Aside –4 th QTR/FY09 Davis-Monthan AFB

8 BUILDING STRONG SM Los Angeles District UAS –$8M - $12M –8a Competitive –4th QTR/FY09 Repair Admin Building –$1M - $2M –POCA –4 th QTR/FY09 Replace Evap Cooling –$2M - $3M –POCA –4 th QTR/FY09 Fort Huachuca Construct Mezzanine-Barnes Field House –$50K - $150K –POCA –4th QTR/FY09 Repair Base Wide EMCS –$500K - $1M –POCA –4th QTR/FY09

9 BUILDING STRONG SM Los Angeles District Main Gate/Sewer Transfer Station –$4M - $8M –SB-Set-Aside –4 th QTR/FY09 Creech AFB

10 BUILDING STRONG SM Los Angeles District Airfield Fire Rescue Station –$5M - $15M –SB-Set-Aside –4 th QTR/FY09 Child Development Center (ARRA project) –$10M - $15M –Unrestricted –4 th QTR/FY09 Child Development Center (NAF funded) –$3M - $7M –SB-Set-Aside –4 th QTR/FY09 Hangar/Maint Unit –$25M - $35M –Unrestricted –4 th QTR/FY09 Nellis AFB

11 BUILDING STRONG SM Los Angeles District California Air National Guard HVAC/Electrical Upgrade/Window Replacement & Latrines –$500K - $1M –POCA –4 th QTR/FY09 Camp Pendleton 22190 Dental Renovation –$1M - $2M –POCA –4 th QTR/FY09

12 BUILDING STRONG SM Los Angeles District Civil Works Program Flood Risk Management: Prado Dam Ecosystem Restoration: Tres Rios Navigation, Ports & Harbors: Port of L.A.

13 BUILDING STRONG SM Los Angeles District CIVIL WORKS PROJECTS TYPES of WORK The Civil Works program contracts for Architect Engineer services primarily though Indefinite Delivery Type contracts. All AE contracts are advertised in FEDBIZOPS and about 2 new AE’s are hired each year, on average. Delivery orders are issued from these contracts for Plans and Specifications, Surveys, Geotechnical Investigations, etc. The Civil Works program awards Construction Contracts for channel and levee improvements, environmental restoration, shore protection, harbor dredging, water and wastewater facilities, and other civil works projects. Contracts are typically awarded based on competitive bidding. Service Contracts are awarded for professional services for development of Environmental Assessments and Environmental Impact Statements and the associated studies and field surveys.

14 BUILDING STRONG SM Los Angeles District Construction Contracts Harbor/South Bay, CA –$1.5M – $3M –4 th QTR/FY09 LA County Drainage Area, CA –$2.8M - $4M –4 th QTR/FY09 Nogales Wash, AZ –$500K - $2M –4 th QTR/FY09 Rural Nevada Searchlight, NV –$2M - $3M –4 th QTR/FY09

15 BUILDING STRONG SM Los Angeles District Construction Contracts Santa Ana River Mainstem, CA (2) –$3M - $25M –4 th QTR/FY09 Santa Paula, CA –$3M - $4M –4 th QTR/FY09 Santa Maria River, CA (2) –$5M - $20M –4 th QTR/FY09 Tres Rios, AZ –$9M - $15M –4 th QTR/FY09

16 BUILDING STRONG SM Los Angeles District Construction Contracts Tropicana & Flamingo Washes, NV –$1M - $2M –3 rd QTR/FY09 Upper Newport Bay Eco, CA –$5M – 13M –4 th QTR/FY09 O&M Dana Point, CA –$100K - 200K –4 th QTR/FY09 O&M San Diego – Mission Bay –$4M - $5M –4 th QTR/FY09 O&M Santa Barbara Harbor, CA –$500K - $8.5K –4 th QTR/FY09

17 BUILDING STRONG SM Los Angeles District Construction Contracts Upper Newport Bay Eco, CA –$5M – 13M –4 th QTR/FY09 O&M Dana Point, CA –$100K - 200K –4 th QTR/FY09 O&M San Diego – Mission Bay –$4M - $5M –4 th QTR/FY09 O&M Santa Barbara Harbor, CA –$500K - $8.5K –4 th QTR/FY09

18 BUILDING STRONG SM Los Angeles District A/E Services QA Services (SB Set - aside), SPD Wide –$1M - $5M –4 th QTR/FY09 Coastal Planning Services (SB Set - aside), CA –$1M - $5M –4 th QTR/FY09 Coastal Planning Services (Unrestricted), CA –$1M - $5M –4 th QTR/FY09

19 BUILDING STRONG SM Los Angeles District A/E Services Water Resources, H&H Eng (SB Set - aside), CA –$1M - $5M –4 th QTR/FY09 Water Resources, H&H Eng (Unrestricted), CA –$5M - $10M –4 th QTR/FY09 Civil Engineering, Design (SB Set - aside), CA (2) –$1M - $5M –4 th QTR/FY09 Civil Engineering, Design (Unrestricted), CA (2) –$5M - $10M –4 th QTR/FY09

20 BUILDING STRONG SM Los Angeles District A/E Services Civil Engineering, Design (Unrestricted), CA (2) –$5M - $10M –4 th QTR/FY09 Geotechnical, (SB Set - aside), CA (2) –$1M - $5M –4 th QTR/FY09 Geotechnical, (Unrestricted), CA (2) –$5M - $10M –4 th QTR/FY09

21 BUILDING STRONG SM Los Angeles District Other Services Vegetation and Sediment Removal (6) –Ranging from $100K to $2M –4 th QTR/FY09 Graffiti Removal (1) –$200K to $1M –4 th QTR/FY09 Master Plans (3) –Ranging from $200K $1M –4 th QTR/FY09

22 BUILDING STRONG SM Los Angeles District New Acquisitions THREE MATOC’s - $49.5M each VA Specific (SDVOB) Source Selection – 2 Jun 09 Phase II RFP – 02 Jul 09 Scheduled award for - Aug 09 Vertical RFP Phase I – Re-issue 4 th Qtr FY09 Award - 1 st Qtr FY10 Horizontal RFP Phase I Issued – 4 th Qtr 09 Scheduled for Award 1 st Qtr 10 Regional DB MATOC <$500M Civil, Military, IIS, for horizontal and vertical construction within SPD Issue RFP (Phase I) 4 th Qtr FY09 Award – FY 10 Regional DB MATOC(s):

23 BUILDING STRONG SM Los Angeles District NEVADA Interagency & International Support ARIZONA UTAH CALIFORNIA CBP Tactical Infrastructure Vertical Infrastructure ( 225 miles ) Border Patrol / Customs and Border Patrol Bureau of Indian Affairs Bureau of Land Management Bureau of Prisons Department of Agriculture Drug Enforcement Agency Environmental Protection Agency Federal Emergency Management Agency Department of Homeland Security Food and Drug Administration International Boundaries and Water Commission Veteran’s Administration VA Support CA - 92 Projects (2008-2009 ~ $101M) LOS ANGELES LAS VEGAS PHOENIX Yuma Wellton Ajo Tucson Casa Grande Florence Wilcox Douglas Naco Nogales Brown Field Campo Chula Vista El Cajon Imperial Beach San Clemente Murrieta Calexico El Centro Indio Riverside Blythe CBP Support 162 projects Vertical Construction (2005-2008 ~ $399M) SBI-NET Support Border Fence 46 Projects (2007-2009 ~ $775M)

24 BUILDING STRONG SM Los Angeles District Other Contracting Opportunities *Expecting ~$10M-$20M in additional VA projects - information will not be available until VA prioritizes among 65+ desired projects Veterans Administration,* VISN #22, CA – SB Set-Aside San Diego -- $1.7M - $2.2M/FY09 Long Beach -- $7M - $8.1M/FY09 Greater Los Angeles -- $25M - $33M/FY09 Loma Linda -- $6M - $7.5M/FY09 CBP Stations, AZ Naco -- $34M 3 rd QTR/FY10 Ajo -- $39M, 1 st QTR/FY10

25 BUILDING STRONG SM Los Angeles District Sustainable “Green” Engineering Cambria Desalinization Plant Cambria, CA 850kW Wind Power Generator Fort Huachuca, AZ MOUT Site Fort Irwin, CA (NTC) Walls made of studcast Cut the budget by 30% Accelerated constr by 50% Will provide potable water supply; contamination currently limiting available sources Sustainable Need and Potential! Opportunity for new partnerships in: MILCON Civil Works I&IS Wind Solar Land area Lack of water Growing population

26 BUILDING STRONG SM Los Angeles District Doing Business With the Corps Proven record of performance Relationships, relationships, relationships Understand the Army Corps of Engineers Project Delivery Process Know you strengths and weaknesses Use the Corps and the Federal Business Opportunities website Be a part of the solution - help us meet our goals Deliver!

27 BUILDING STRONG SM Los Angeles District Los Angeles District: www.spl.usace.army.mil Los Angeles District Commander: Thomas.H.Magness@usace.army.mil Los Angeles District Small Business Administrator: Mary.E.Spencer@usace.army.mil Doing Business With the Corps http://ebs.spl.usace.army.mil/ www.fedbizopps.gov

28 BUILDING STRONG SM Los Angeles District Questions?


Download ppt "BUILDING STRONG SM Los Angeles District American Council of Engineering Companies Briefing by COL Thomas H. Magness District Commander Los Angeles District."

Similar presentations


Ads by Google