Presentation is loading. Please wait.

Presentation is loading. Please wait.

1.2.2 Stakeholder Role By: Seth Byers Vince Primer Evan Davis Jacob Barton.

Similar presentations


Presentation on theme: "1.2.2 Stakeholder Role By: Seth Byers Vince Primer Evan Davis Jacob Barton."— Presentation transcript:

1

2 1.2.2 Stakeholder Role By: Seth Byers Vince Primer Evan Davis Jacob Barton

3 Roles Vince Cost Estimator Seth Construction Contractor/Manager Evan Landscape Architect Jacob Health And Safety Engineer

4 Cost Estimator Cost estimators collect and analyze data in order to estimate the time, money, materials, and labor required to manufacture a product, construct a building, or provide a service. They generally specialize in a particular industry or type of product.

5 Construction Contractor/Manager Construction managers plan, coordinate, budget, and supervise construction projects from development to completion.

6 Landscape Architect Landscape architects plan and design land areas for parks, recreational facilities, private homes, campuses, and other open spaces.

7 Health And Safety Engineer Health and safety engineers develop procedures and design systems to prevent people from getting sick or injured and to keep property from being damaged. They combine knowledge of systems engineering and of health and safety to make sure that chemicals, machinery, software, furniture, and other consumer products will not cause harm to people or buildings

8 Concept Map


Download ppt "1.2.2 Stakeholder Role By: Seth Byers Vince Primer Evan Davis Jacob Barton."

Similar presentations


Ads by Google