Presentation is loading. Please wait.

Presentation is loading. Please wait.

ENGINEERING COUNCIL OF SOUTH AFRICA LIMPOPO ROADSHOW ECSA STRATEGIC REPOSITIONING Date: Thursday 10 April 2014 1.

Similar presentations


Presentation on theme: "ENGINEERING COUNCIL OF SOUTH AFRICA LIMPOPO ROADSHOW ECSA STRATEGIC REPOSITIONING Date: Thursday 10 April 2014 1."— Presentation transcript:

1 ENGINEERING COUNCIL OF SOUTH AFRICA LIMPOPO ROADSHOW ECSA STRATEGIC REPOSITIONING Date: Thursday 10 April 2014 1

2 Presentation Outline 2 i.Purpose of the meeting ii.What purpose does ECSA fulfil? iii.ECSA’s Functions: Mandatory & Discretionary iv.ECSA’s Stakeholders v.Composition of ECSA Council

3 Purpose of the Presentation 3 Share strategic direction of ECSA Outline transformation evolution and agenda of ECSA Future activities of ECSA Matters of mutual interest

4 ECSA Brand 4 “What are people without institutions and what are institutions without people”

5 ECSA Brand 5 Custodian of the Engineering Intellectual Capital in South Africa Supports Social and Economic Activities of the Government Committed to the Transformation of the Engineering Profession

6 What purpose does ECSA fulfil ? 6 The purpose of the ECSA is to.......... promote the health, and safety interests of citizens & the environment........... in relation to work by the engineering professionals. Engineering Professions Act (No. 46 of 2000)

7 ECSA’s Functions: Mandatory 7 (a)Accreditation of engineering programmes; (b) Registration of professionals and candidates; (c)Regulation of engineering practice o Managing a Code of Conduct; o Managing complaints & discipline; o Managing continual professional development; o Identification of Engineering Work (IDoEW); (d)Provide audited financial statements.

8 ECSA’s Functions: Discretionary 8 (a) Take measures to protect public health and safety; (b) Conduct research; (c) Improve standards of services delivered by registered persons; (d) Uphold the integrity and dignity of the profession;

9 ECSA’s functions: Discretionary 9 (e ) Create awareness of the need to protect the environment; (f) Recognise and interact with Voluntary Associations; (g) Advise the Council for the Built Environment (CBE) & Minister of Public Works or any other minister on matters relating to the engineering profession; and (h)Provide strategic services to serve and develop the engineering profession and the nation.

10 ECSA Stakeholder Relations 10 CBE The Public International Partners Voluntary Associations Engineering Practitioners Registered Persons Engineering Higher Education SETAs DPW Africa DTI DBE DPE DAFF CHE SAQA DoL DMR HESA DED DoT Industry, Firms Sectors, … NRCS DHET DoCDE End Users SABS PPC

11 Composition of ECSA Council Racial profile 11 White Black African Coloured Indian 200128221534 200525 1348 200920301929 201212382846

12 Transformation Process and Model 12 3 rd Council (24 August 2009). Considered the Six Dimensions of Transformation  Processes & Systems  People & Culture  Infrastructure  Legal Framework Council Transformation Task Team (August 2010) 4 th Council (5 th July 2012). Established a Transformation Committee

13 ECSA Transformation Model Transformation Pillar 1 Legitimacy Transformation Pillar 1 Legitimacy Transformation Pillar 3 Efficiency Transformation Pillar 3 Efficiency Variable 8 Regulation of the Profession Variable 8 Regulation of the Profession Variable 9 Funding of ECSA initiatives Variable 9 Funding of ECSA initiatives Variable 10 Presidents forum, Deans forum, Business, VAs, etc Variable 10 Presidents forum, Deans forum, Business, VAs, etc Variable 7 ECSA’s participation in social and economic initiatives Variable 7 ECSA’s participation in social and economic initiatives Variable 6 Objective, fair and reasonable registration process Variable 6 Objective, fair and reasonable registration process Variable 5 ECSA’s participation in Training and development of Engineering practitioners Variable 5 ECSA’s participation in Training and development of Engineering practitioners Variable 4 Active and equitable participation of Engineering practitioners of all race groups Variable 4 Active and equitable participation of Engineering practitioners of all race groups Variable 3 Active interaction with Government, Department of Public Works (DPW) and Council for the Built Environment (CBE) Variable 3 Active interaction with Government, Department of Public Works (DPW) and Council for the Built Environment (CBE) Variable 2 Transformation of ECSA systems, processes and infrastructure Variable 2 Transformation of ECSA systems, processes and infrastructure Variable 1 Transformation of ECSA structures Variable 1 Transformation of ECSA structures

14 THANK YOU 14


Download ppt "ENGINEERING COUNCIL OF SOUTH AFRICA LIMPOPO ROADSHOW ECSA STRATEGIC REPOSITIONING Date: Thursday 10 April 2014 1."

Similar presentations


Ads by Google