Presentation is loading. Please wait.

Presentation is loading. Please wait.

Compton Experiment at the ATF Update since TILC09 Positron Workshop Durham 28-October-2009 Junji Urakawa instead of T.Takahashi KEK for collaborators.

Similar presentations


Presentation on theme: "Compton Experiment at the ATF Update since TILC09 Positron Workshop Durham 28-October-2009 Junji Urakawa instead of T.Takahashi KEK for collaborators."— Presentation transcript:

1 Compton Experiment at the ATF Update since TILC09 Positron Workshop Durham 28-October-2009 Junji Urakawa instead of T.Takahashi KEK for collaborators

2 Optical Cavity for Laser-Compton 325 MHz Lcav Higher laser power L cav = n  L<sub-nm, position for pulse stacking ->more enhancement, then more precision Laser should be focused for high power density Efficient laser-Compton scattering  T < sub-ps Accommodate laser cavity in the accelerator

3 Two Prototype Cavities 4-mirror cavities w/LAL2-mirror cavity high enhancement small spot size complicated control moderate enhancement moderate spot size simple control (Hiroshima / Weseda / Kyoto / IHEP / KEK) demonstration of  ray gen. accum. exp. w/ cavity and acc. intense  ray generation

4 2 MIRROR CAVITY STATUS

5 Experimental R/D in ATF. Make a fist prototype 2-mirror cavity Put it in ATF ring Hiroshima-Waseda-Kyoto-IHEP-KEK L cav = 420 mm

6 Laser Power enhancement 250

7 AFTER TILC09 ► One of the Mirror was replaced with the higher reflectivity one – 99.6% -> 99.9% – power enhancement ● 250 -> ~750 – more precise controll required (~0.1nm) ► Status of the cavity w/ new mirror – Finess ~2000 with feedback on before vacuum on – now in preparation for beam – hope to get 3 times more photons by the end of the year 99.9% 99.6%

8 4 MIRROR CAVITY STATUS March 2009 August 2009

9 α 2D configuration 3D configuration to2D 4mirror cavity has astigmatism. to position in the cavity to spot size go to 3D config. to avoid astgmatism to spot size to position in the cavity

10 R&D of 4 mirrors cavity started at KEK (Reported TILC09) Honda L ring = n (n+1)

11 prototype 4 mirror cavity Constructed

12 tuning mechanizm HV Power Piezo spring Objective: to establish method of: mirror alignment, control cavity length  feed back to the beam compatible cavity

13 Prototype cavity on the optical table

14 status of initial tests circumference of the cavity intensity of transmitted light fundamental resonant mode resonance of the cavity with injecting laser observed

15 two peaks two separated resonant peaks each corresponds to left or right handed polarization 3D cavity only resonates with circular polarization due to geometric phase Useful to: generate circularly pol.  s fast switching

16 Flat mirror Spherical mirror 8°8° Central support Spherical mirror R. Cizeron LAL 30/01/2008 Staus of the LAL cavity French colleagues visited KEK in July. discussed detail of the installation procedure setting up at the ATF beam line working to install the cavity in summer 2010

17 Summary ► 2 mirror cavity to demonstrate photon generation and to accumulate experience w/ beams – At the TILC09 ● enhancement of 250, 27 gammas / crossing – high reflection mirror (99.6% -> 99.9%) ● beam with enhancement ~750 to 1000 this year ► 4 mirror ring cavity for higher enhancement and small spot size – at the TILC09 ● basic test on optical table – first prototype at KEK and being tested – installation of LAL cavity being ready

18 Urakawa

19 Equivalent Optics of the 4-mirror Cavity 4-mirror ring cavity Very Large Focal Point tolerance : 4-mirror = 100 x 2-mirror

20 α 2D configuration 3D configuration

21 concentric confocal Tolerance of 2-mirror cavity Concentric Configuration and Confocal Configuration

22 concentric confocal 4-mirror cavity2-mirror cavity L R1=R2=L/2 R1=R2=L L

23 data summary Normalized  yield seems to decrease as # bunches/train goes up Bunch (size, timing) fluctuation in the ATF suspected bunch /train current [mA] Stacked Laser power[W]  s /train expectationnormarized  s/A/W 12.2 54.7 108.5 1511


Download ppt "Compton Experiment at the ATF Update since TILC09 Positron Workshop Durham 28-October-2009 Junji Urakawa instead of T.Takahashi KEK for collaborators."

Similar presentations


Ads by Google