Motion Planning for Tower Crane Operation. Motivation  Tower crane impacts the schedule greatly  Safety of tower crane operation is critical.

Similar presentations


Presentation on theme: "Motion Planning for Tower Crane Operation. Motivation  Tower crane impacts the schedule greatly  Safety of tower crane operation is critical."— Presentation transcript:

1 Motion Planning for Tower Crane Operation

2 Motivation  Tower crane impacts the schedule greatly  Safety of tower crane operation is critical

3 Major Challenges  Schedule Predict? Guess?  Special Projects Complex projects Fast-track projects Critical working space constrains

4 Tower Crane Operation Secure structure element to hook Move piece from original location to final position Holding time Repositioning of crane to next piece T1T2T3T4

5 The Crane

6 Configure Space vs World Space {H} {B} Θ1Θ1 Θ4Θ4 d2d2 d3d3 z y x α β γ

7 Planning Algorithm (RRT) While (MaxStep is not reached) 1. Expand Tree_1 (init) & Tree_2 (goal) 2. Connect check if connected, then Generate a Path else goto 1. Expand: 1. Create a random node 2. find nearest node 3. try to add nearest node to tree 4. try to add the random node the tree Connect: 1. Can the new added nodes See any of the nodes from another tree? (collision detection as a straight line) InitGoal