1 NSS-03-01 SMC/XR Template SMC April 2008; rev19 Program Management
Usage Note: This flow chart has been modified using information from NSS03-01, DoD 5000 and other applicable documentation for use by SMC/XR as a training aid/template (including some draft documentation) It has been tailored for that organizations use and other organizations may follow a different/modified version of what is presented here Planning, DEPSECDEF Oversight Budgeting & Execution Programming, DoD R Effective Interaction is Essential NSS Decision Support Systems Pre KDP-A Concept Studies Phase A Concept Development Joint Capabilities Development System Integration & CJCSI F VCJCS Oversight Space Acquisition National Security NSS-03-01 Process JCIDS process, architecting process, and operators/using entities develop JCIDS products (e.g., Initial Capabilities Development Document (CDD), Joint Operation Concepts, etc.) with support from space acquisition organizations as requested. Once it is clear that a space system needs to be acquired, J8 will notify DoD Space MDA. ICD Includes concept studies, assessments and requirements (e.g., technology development, Capability Development Document). During this phase, baseline development is mature enough to enter the formal acquisition process. Concept Decision Meeting Service/JROC Validation & Approval KDP A KDP B Key PM Topic Areas for KDP Preparation (Details on back side of chart) Acquisition Strategy Mature Document Approvals 11-14) High Level 2a-d) Program Description, Organization & Progress 2f-j) Detailed Budget Information 7-8) Cost Drivers & Trades 3) Exit/Entry Criteria Analysis/Review Document Approvals 11-15) High-Level Program Management 5) SEP 2a-c) Program & Organization Description 5) SEP 2f-j-8-16) Prog Estimate/Executability & Cost Drivers Acquisition Strategy 1) MDA Approved 17) IMS & Architecture Summary 4) Requirements 16) Program Estimate, POM, CARD 18) ADM/APB 2d) Technologies/Studies Accomplished 18) ADM 10) Support Issues 4a-c) Requirements 9) Risk Management & Probability of Program Success Assessment 9) Detailed Risk Management & Probability of Program Success Assessment Objectives: Develop & document a systems engineering process for developing pre-AoA materiel solutions Validate the process using a case study with a stated capability shortfall & document the results Deliverables: Characterization & technical data of the materiel solutions developed for the stated capability shortfall Systems Engineering Plan specifically tailored for pre-AoA material concepts Objectives: Match User Requirements to available technology Plan and Conduct an AoA to determine preferred materiel solution Deliverables: Analysis of Alternatives Report KDP A required documentation Objectives: Mature Technologies to TRL 6 Develop a firm, cost effective program baseline meeting user requirements Deliverables: Approved System Specification and Function Baseline (Note: Key NSS requirement that differs from DoD 5000) KDP B required documentation (see reverse side) Planning must allow time and schedule for iterative technology development – Maturing technology may not achieve SRR or SFR criteria on first attempt Service/JROC Validation & Approval Criteria Exit Met ICD DSAB MDA ADM Criteria Exit KPPs CDD Solution Identification # of options reduced from Pre KDP A to final solution by KDP B Phase 1: Tech Maturation Service/JROC Validation & Approval Phase 2: System Maturation APB Criteria Exit Met DSAB MDA ADM Criteria Exit AOA SRR - Certification (MAIS) - Compliance (all IT) Clinger-Cohen Act SFR Key Activities Flow Diagrams Describing Major Activities and their relationships Characterized Concept Implementable Prgm Baseline Concept Characterization Preferred System Concept Tech Demonstrations & Prototypes INPUTS OUTPUTS ASR Defined User Needs & Concepts Versus Analyze/Assess Environmental Constraints Performance (& Constraints) Develop Concept Definition & Verification Objectives Decompose Concept Functional Definition & Performance into Verification Objectives Versus Functional System Concept Assess/Analyze Capabilities Functional Definition into Assessment Objectives Component Concepts & Develop Component Concepts, Technologies, Constraints i.e., Enabling/Critical & Cost/Risk Drivers Components Versus Enabling/Critical Trades Concept & Verify System Concept’s Performance ITR OUTPUTS Analysis of Alternatives System-Level CONOPS OV Arch Products Initial CDD Acquisition Strategy T&E Strategy IPS Exit Criteria AoA Plan ICD INPUTS Interpret User Needs, Analyze Operational Capabilities & Interpret User Needs. Analyze Operational Capabilities & Environmental Constraints Develop System Perf (& Constraints) Spec & Enabling/Critical Tech Verification Plan Develop Functional Definitions for Enabling/ Critical Technologies & Associated Verification Plan Decompose Functional Definitions into Critical Component Definition & Tech Verification Plan Trades ICD & Draft CDD Preferred Sys Concept Exit Criteria T&E Strategy Support & Maintenance Concepts & Technologies AoA SEP Sys Performance Spec TEMP Validated Sys Support & Maintenance Objectives & Requirements PESHE PPP TRA Inputs to: - IBR ISP STA CDD Acq Strategy Affordability Assessment Cost/Manpower Est. INPUTS OUTPUTS Demo & Validate Sys Concepts & Technology Maturity Versus Defined User Needs Demo System Functionality Versus Plan Demo Enabling/ Critical Technology Components Develop System Concepts, i.e., Enabling/Critical Technologies, Update Constraints & Cost/Risk Drivers Demo/Model Integrated System Versus Performance Spec Key Management Considerations Proposed Materiel Solution Capability Shortfall Concept Characterization ConSEP Inputs into: & Technical Description - - - draft AoA Plan ICD Program Structure Corrosion Prevention Capability Needs Acquisition Approach T&E Considerations Life Cycle Sustainment Data Management Systems Engineering Resource Management Risk Management Information Technology Information Assurance Research & Tech Protection Interoperability ESOH Human Systems Integration Product Support Best Practices Business Considerations MOSA Relief, Exemptions & Waivers Preliminary Integrated - Architecture Demo Plan CRA Interpret User Needs, Analyze Operational Capability Versus Analyze/Assess Environmental Constraints Capability Shortfalls & Environmental Constraints Defined User Needs & Trades Trades Technical Systems Engineering Test & Evaluation Supportability Tradespace Develop & Capability & Verification Constraints Capability & Verify Assess/Analyze Objectives Tradespace Performance Decompose Capability Tradespace into Solution Sets Versus Assess/Analyze Verification Objectives Solution Sets & Functional Performance Funding in Full FYDP Decompose Capability Assess/Analyze Component Solutions & Solution Sets into Component Solutions Enabling/Critical Assessment Objectives Versus Shortfalls Assessment Affordability POE CCA ICE CARD (Designated Programs) Develop Component Solutions, Technologies, Constraints i.e., Enabling/Critical & Cost/Risk Drivers ADM – Acquisition Decision Memorandum AoA – Analysis of Alternatives APB – Acquisition Program Baseline CD – Concept Decision CDR – Critical Design Review DAB – Defense Acquisition Board DSAB – Defense Space Acquisition Board ESOH – Environment, Safety & Occupational Health EVM – Earned Value Management FRPDR – Full-Rate Production Decision Review IBR – Integrated Baseline Review ITAB – Information Technology Acquisition Board LRIP – Low Rate Initial Production MAIS – Major Automated Information System MDA – Milestone Decision Authority MOSA – Modular Open Systems Approach PSR – Program Support Review T&E – Test and Evaluation TLCSM – Total Life Cycle Systems Management Oversight & Review Acronyms

2 9 Guiding Principles of Space Acquisition
Mission Success Accountability Streamlined / Agile Inclusive Flexible Stable Disciplined Credible Cost Realism