2008 NEWARK CAMPUS CAPACITY STUDY AYERS | SAINT | GROSS Stormwater and Ecological Management Opportunities May 2008.

Similar presentations


Presentation on theme: "2008 NEWARK CAMPUS CAPACITY STUDY AYERS | SAINT | GROSS Stormwater and Ecological Management Opportunities May 2008."— Presentation transcript:

1 2008 NEWARK CAMPUS CAPACITY STUDY AYERS | SAINT | GROSS Stormwater and Ecological Management Opportunities May 2008

2 2008 NEWARK CAMPUS CAPACITY STUDY AYERS | SAINT | GROSS University of Delaware Newark Campus

3 2008 NEWARK CAMPUS CAPACITY STUDY AYERS | SAINT | GROSS Stormwater and Ecological Observations Unique geologic setting on fall line (divide between Piedmont and Coastal Plain) Two major watersheds (White Clay Creek and Christina River) Opportunities to reestablish and improve north/south “green” corridor Opportunities to develop integrated stormwater management to both improve existing conditions and address future growth Approximate Fall Line Stormwater and Ecological Analysis Overview

4 2008 NEWARK CAMPUS CAPACITY STUDY AYERS | SAINT | GROSS White Clay Creek / Laird and Main Campuses Stormwater and Ecological Analysis Overview

5 2008 NEWARK CAMPUS CAPACITY STUDY AYERS | SAINT | GROSS White Clay Creek / Laird Campus Significant erosional features due to uncontrolled or inadequately controlled runoff Large student parking lot is source of many impacts which need to be addressed New dorms have missed several landscape opportunities to provide integrated stormwater management Existing best management practices are mix of good bad and ugly Stormwater management has challenges with steeper Piedmont setting Stormwater and Ecological Analysis Overview

6 2008 NEWARK CAMPUS CAPACITY STUDY AYERS | SAINT | GROSS Christina River / South Campus Stormwater and Ecological Analysis Overview

7 2008 NEWARK CAMPUS CAPACITY STUDY AYERS | SAINT | GROSS South Campus Several existing BMPs in place but abundant other stormwater management opportunities Coastal Plain setting provides opportunities to infiltrate. Flatter slopes means areas may stay wetter longer. Research forest somewhat impacted due to uncontrolled runoff Opportunities to work with neighbors to east to create vegetated buffer Create buffers along streams and wetland areas Make pathway and ecological corridor connections to main campus Look to daylight conveyances and incorporate more vegetated swales and depressional areas for water quality treatment and recharge Stormwater and Ecological Analysis Overview

8 2008 NEWARK CAMPUS CAPACITY STUDY AYERS | SAINT | GROSS From GIS base maps analyses were performed Streams and floodplains were mapped and forest patches >25 ac were identified Ecological Areas of Interest Preliminary Findings Stormwater and Ecological Analysis Overview

9 2008 NEWARK CAMPUS CAPACITY STUDY AYERS | SAINT | GROSS Forested areas were visited Qualitative plot data was taken (see points) Scores were tallied Using the scores, areas were statistically ranked based on ecological value: Red = high value, Yellow = medium value, Green = low value Ecological Areas of Interest Preliminary Findings Stormwater and Ecological Analysis Overview

10 2008 NEWARK CAMPUS CAPACITY STUDY AYERS | SAINT | GROSS Green areas, with low scores, are more suitable for development. Yellow areas are more intact and valuable areas, where development should be carefully considered Red areas are more ecologically valuable and less suitable for development Ecological Areas of Interest Preliminary Findings Stormwater and Ecological Analysis Overview

11 2008 NEWARK CAMPUS CAPACITY STUDY AYERS | SAINT | GROSS Ecological Areas of Interest Preliminary Findings Areas 1 and 2 support the most ecologically intact forest investigated Area 1Area 2 Stormwater and Ecological Analysis Overview

12 2008 NEWARK CAMPUS CAPACITY STUDY AYERS | SAINT | GROSS Ecological Areas of Interest Preliminary Findings Areas 3 and 4 contain Fairfield Run and Blue Hen Creek. Both streams are heavily impacted by stormwater. These areas directly affect water quality in White Clay Creek. Area 3 Area 4 Stormwater and Ecological Analysis Overview

13 2008 NEWARK CAMPUS CAPACITY STUDY AYERS | SAINT | GROSS Ecological Areas of Interest Preliminary Findings Area 5 is a relatively isolated fragment of forest, the channel of the stream which flows through it is deeply incised and eroded. Stormwater and Ecological Analysis Overview

14 2008 NEWARK CAMPUS CAPACITY STUDY AYERS | SAINT | GROSS Ecological Areas of Interest Preliminary Findings Areas 6 and 7 have qualities which enhance their ecological value such as older forest canopy trees and wetland areas. Area 6Area 7 Stormwater and Ecological Analysis Overview

15 2008 NEWARK CAMPUS CAPACITY STUDY AYERS | SAINT | GROSS Stormwater Management Zones Laird Campus Zone Central Campus Zone Athletics Zone Agriculture Zone Facilities and Biotech Park Zone

16 2008 NEWARK CAMPUS CAPACITY STUDY AYERS | SAINT | GROSS Laird Campus Laird Campus Zone

17 2008 NEWARK CAMPUS CAPACITY STUDY AYERS | SAINT | GROSS Green Infrastructure Opportunities Rooftops Quads Streets Parking lots Turf areas Laird Campus Zone

18 2008 NEWARK CAMPUS CAPACITY STUDY AYERS | SAINT | GROSS Stormwater curb extensions Stormwater tree pits Permeable pavers Infiltration Grass swales Filter Strips Streets Laird Campus Zone

19 2008 NEWARK CAMPUS CAPACITY STUDY AYERS | SAINT | GROSS Existing Conditions Laird Campus Zone

20 2008 NEWARK CAMPUS CAPACITY STUDY AYERS | SAINT | GROSS Proposed Conditions Laird Campus Zone Curb Extension – Stormwater Planter

21 2008 NEWARK CAMPUS CAPACITY STUDY AYERS | SAINT | GROSS Existing Conditions Laird Campus Zone

22 2008 NEWARK CAMPUS CAPACITY STUDY AYERS | SAINT | GROSS Proposed Conditions Laird Campus Zone Curb Extension – Stormwater Tree Pit

23 2008 NEWARK CAMPUS CAPACITY STUDY AYERS | SAINT | GROSS Existing Conditions Laird Campus Zone There are examples across campus of good management and runoff control/treatment practices. At the Dickinson Complex curb cuts allow runoff to enter a rain garden/bioretention area.

24 2008 NEWARK CAMPUS CAPACITY STUDY AYERS | SAINT | GROSS Rooftops Regenerative Stormwater Conveyance Bioretention/Rain Garden Detention Infiltration Trench Stormwater planters Cisterns Grass channel/ Filter Strip Laird Campus Zone

25 2008 NEWARK CAMPUS CAPACITY STUDY AYERS | SAINT | GROSS Proposed Conditions Laird Campus Zone Existing Conditions

26 2008 NEWARK CAMPUS CAPACITY STUDY AYERS | SAINT | GROSS Reforestation/ impervious cover removal Linear bioretention/ Bioswale Regenerative Stormwater Conveyance Grass channel/ filter strip Bioretention islands Infiltration Permeable pavers Parking Laird Campus Zone

27 2008 NEWARK CAMPUS CAPACITY STUDY AYERS | SAINT | GROSS Existing Conditions Laird Campus Zone

28 2008 NEWARK CAMPUS CAPACITY STUDY AYERS | SAINT | GROSS Proposed Conditions Laird Campus Zone Permeable PaversPerimeter Sand Filter

29 2008 NEWARK CAMPUS CAPACITY STUDY AYERS | SAINT | GROSS Existing Conditions Laird Campus Zone Retrofitted curb cuts have been implemented, offering some benefit. However, in some cases they are not well designed or maintained for optimum treatment.

30 2008 NEWARK CAMPUS CAPACITY STUDY AYERS | SAINT | GROSS Proposed Conditions Laird Campus Zone Linear Bioretention

31 2008 NEWARK CAMPUS CAPACITY STUDY AYERS | SAINT | GROSS Existing Conditions Laird Campus Zone

32 2008 NEWARK CAMPUS CAPACITY STUDY AYERS | SAINT | GROSS Proposed Conditions Laird Campus Zone Linear Bioretention

33 2008 NEWARK CAMPUS CAPACITY STUDY AYERS | SAINT | GROSS Existing Conditions Laird Campus Zone

34 2008 NEWARK CAMPUS CAPACITY STUDY AYERS | SAINT | GROSS Proposed Conditions Regenerative Stormwater Conveyance Laird Campus Zone

35 2008 NEWARK CAMPUS CAPACITY STUDY AYERS | SAINT | GROSS Preliminary Opportunities Stormwater Retrofits (LR) Stream/Outfall Repair (LS) Invasive Plant Removal (LI) Laird Campus Zone

36 2008 NEWARK CAMPUS CAPACITY STUDY AYERS | SAINT | GROSS Preliminary Opportunities $ $100K Laird Campus Zone

37 2008 NEWARK CAMPUS CAPACITY STUDY AYERS | SAINT | GROSS Central Campus Central Campus Zone

38 2008 NEWARK CAMPUS CAPACITY STUDY AYERS | SAINT | GROSS Green Infrastructure Opportunities Rooftops Quads Streets Parking lots Turf areas Central Campus Zone

39 2008 NEWARK CAMPUS CAPACITY STUDY AYERS | SAINT | GROSS Grass swales Stormwater curb extensions Stormwater tree pits Permeable pavers Infiltration Filter Strips Streets Central Campus Zone

40 2008 NEWARK CAMPUS CAPACITY STUDY AYERS | SAINT | GROSS Existing Conditions Central Campus Zone

41 2008 NEWARK CAMPUS CAPACITY STUDY AYERS | SAINT | GROSS Proposed Conditions Central Campus Zone Infiltration, Bioretention & Stormwater Tree Pits

42 2008 NEWARK CAMPUS CAPACITY STUDY AYERS | SAINT | GROSS Existing Conditions Central Campus Zone

43 2008 NEWARK CAMPUS CAPACITY STUDY AYERS | SAINT | GROSS Proposed Conditions Central Campus Zone Curb Extension – Stormwater Planter

44 2008 NEWARK CAMPUS CAPACITY STUDY AYERS | SAINT | GROSS Bioretention/Rain Garden Detention Infiltration Trench Stormwater planters Cisterns Grass channel/ Filter Strip Rooftop Central Campus Zone

45 2008 NEWARK CAMPUS CAPACITY STUDY AYERS | SAINT | GROSS Existing Conditions Central Campus Zone

46 2008 NEWARK CAMPUS CAPACITY STUDY AYERS | SAINT | GROSS Proposed Conditions Central Campus Zone Downspout Disconnect to Rainbarrel

47 2008 NEWARK CAMPUS CAPACITY STUDY AYERS | SAINT | GROSS Existing Conditions Central Campus Zone

48 2008 NEWARK CAMPUS CAPACITY STUDY AYERS | SAINT | GROSS Proposed Conditions Central Campus Zone Downspout Disconnection to Rain Garden

49 2008 NEWARK CAMPUS CAPACITY STUDY AYERS | SAINT | GROSS Existing Conditions Central Campus Zone

50 2008 NEWARK CAMPUS CAPACITY STUDY AYERS | SAINT | GROSS Proposed Conditions Central Campus Zone Green Roof

51 2008 NEWARK CAMPUS CAPACITY STUDY AYERS | SAINT | GROSS Reforestation/ impervious cover removal Linear bioretention/ Bioswale Perimeter bioretention Grass channel/ filter strip Bioretention islands Infiltration Permeable pavers Parking Central Campus Zone

52 2008 NEWARK CAMPUS CAPACITY STUDY AYERS | SAINT | GROSS Existing Conditions Central Campus Zone

53 2008 NEWARK CAMPUS CAPACITY STUDY AYERS | SAINT | GROSS Existing Conditions Central Campus Zone Parking lot behind the Center for the Arts - another example of good management and runoff control/treatment practices.

54 2008 NEWARK CAMPUS CAPACITY STUDY AYERS | SAINT | GROSS Proposed Conditions Central Campus Zone

55 2008 NEWARK CAMPUS CAPACITY STUDY AYERS | SAINT | GROSS Bioretention Grass channels Reforestation Native vegetation Turf Central Campus Zone

56 2008 NEWARK CAMPUS CAPACITY STUDY AYERS | SAINT | GROSS Existing Conditions Central Campus Zone

57 2008 NEWARK CAMPUS CAPACITY STUDY AYERS | SAINT | GROSS Proposed Conditions Central Campus Zone Downspout Disconnection to Rain Garden

58 2008 NEWARK CAMPUS CAPACITY STUDY AYERS | SAINT | GROSS Existing Conditions Central Campus Zone

59 2008 NEWARK CAMPUS CAPACITY STUDY AYERS | SAINT | GROSS Proposed Conditions Central Campus Zone Stream Buffer Planting

60 2008 NEWARK CAMPUS CAPACITY STUDY AYERS | SAINT | GROSS Detention/ rainwater harvest Pervious concrete Permeable Pavers Stormwater planters/bioswales Quads Central Campus Zone

61 2008 NEWARK CAMPUS CAPACITY STUDY AYERS | SAINT | GROSS Existing Conditions Central Campus Zone

62 2008 NEWARK CAMPUS CAPACITY STUDY AYERS | SAINT | GROSS Proposed Conditions Central Campus Zone Landscape Conversion: N ative Vegetation

63 2008 NEWARK CAMPUS CAPACITY STUDY AYERS | SAINT | GROSS Existing Conditions Central Campus Zone

64 2008 NEWARK CAMPUS CAPACITY STUDY AYERS | SAINT | GROSS Proposed Conditions Central Campus Zone Landscape Conversion: Designed Public Use & Rain Garden

65 2008 NEWARK CAMPUS CAPACITY STUDY AYERS | SAINT | GROSS Preliminary Opportunities Stormwater Retrofits (CR) Buffers (CB) Central Campus Zone

66 2008 NEWARK CAMPUS CAPACITY STUDY AYERS | SAINT | GROSS Preliminary Opportunities $ $100K Central Campus Zone

67 2008 NEWARK CAMPUS CAPACITY STUDY AYERS | SAINT | GROSS Athletics Athletics Zone

68 2008 NEWARK CAMPUS CAPACITY STUDY AYERS | SAINT | GROSS Green Infrastructure Opportunities Rooftops Quads Streets Parking lots Turf areas Athletics Zone

69 2008 NEWARK CAMPUS CAPACITY STUDY AYERS | SAINT | GROSS Bioretention Detention Infiltration Trench Stormwater planters Cisterns Grass channel/ Filter Strip Rooftop Athletics Zone

70 2008 NEWARK CAMPUS CAPACITY STUDY AYERS | SAINT | GROSS Existing Conditions Athletics Zone

71 2008 NEWARK CAMPUS CAPACITY STUDY AYERS | SAINT | GROSS Proposed Conditions Athletics Zone Combined Treatment : Cistern & Linear Bioretention

72 2008 NEWARK CAMPUS CAPACITY STUDY AYERS | SAINT | GROSS Reforestation/ impervious cover removal Linear bioretention/ Bioswale Perimeter bioretention Grass channel/ filter strip Bioretention islands Infiltration Permeable pavers Parking Athletics Zone

73 2008 NEWARK CAMPUS CAPACITY STUDY AYERS | SAINT | GROSS Existing Conditions Athletics Zone

74 2008 NEWARK CAMPUS CAPACITY STUDY AYERS | SAINT | GROSS Proposed Conditions Athletics Zone Parking Lot Bioretention Island

75 2008 NEWARK CAMPUS CAPACITY STUDY AYERS | SAINT | GROSS Bioretention Grass channels Reforestation Native vegetation Turf Athletics Zone

76 2008 NEWARK CAMPUS CAPACITY STUDY AYERS | SAINT | GROSS Existing Conditions Athletics Zone

77 2008 NEWARK CAMPUS CAPACITY STUDY AYERS | SAINT | GROSS Proposed Conditions Athletics Zone Stream Daylighting

78 2008 NEWARK CAMPUS CAPACITY STUDY AYERS | SAINT | GROSS Preliminary Opportunities Stormwater Retrofit (ATR) Stream/Outfall Repair (ATS) Athletics Zone

79 2008 NEWARK CAMPUS CAPACITY STUDY AYERS | SAINT | GROSS Preliminary Opportunities $ $100K Athletics Zone

80 2008 NEWARK CAMPUS CAPACITY STUDY AYERS | SAINT | GROSS Agriculture Agriculture Zone

81 2008 NEWARK CAMPUS CAPACITY STUDY AYERS | SAINT | GROSS Restoration Opportunities Pasture Riparian corridor Forest Agriculture Zone

82 2008 NEWARK CAMPUS CAPACITY STUDY AYERS | SAINT | GROSS Existing Conditions Agriculture Zone

83 2008 NEWARK CAMPUS CAPACITY STUDY AYERS | SAINT | GROSS Proposed Conditions Agriculture Zone Stormwater Wetland

84 2008 NEWARK CAMPUS CAPACITY STUDY AYERS | SAINT | GROSS Existing Conditions Agriculture Zone

85 2008 NEWARK CAMPUS CAPACITY STUDY AYERS | SAINT | GROSS Proposed Conditions Agriculture Zone Stream Buffer Planting

86 2008 NEWARK CAMPUS CAPACITY STUDY AYERS | SAINT | GROSS Existing Conditions Agriculture Zone

87 2008 NEWARK CAMPUS CAPACITY STUDY AYERS | SAINT | GROSS Proposed Conditions Agriculture Zone Stream Buffer Planting

88 2008 NEWARK CAMPUS CAPACITY STUDY AYERS | SAINT | GROSS Preliminary Opportunities Stormwater Retrofit (AGR) Buffers (AGB) Invasive Plant Removal (AGI) Agriculture Zone

89 2008 NEWARK CAMPUS CAPACITY STUDY AYERS | SAINT | GROSS Preliminary Opportunities $ $100K Agriculture Zone

90 2008 NEWARK CAMPUS CAPACITY STUDY AYERS | SAINT | GROSS Facilities and Biotech Park Zone

91 2008 NEWARK CAMPUS CAPACITY STUDY AYERS | SAINT | GROSS Green Infrastructure Opportunities Rooftops Quads Streets Parking lots Turf areas Facilities and Biotech Park Zone

92 2008 NEWARK CAMPUS CAPACITY STUDY AYERS | SAINT | GROSS Stormwater curb extensions Stormwater tree pits Permeable pavers Infiltration Grass swales Filter Strips Streets Facilities and Biotech Park Zone

93 2008 NEWARK CAMPUS CAPACITY STUDY AYERS | SAINT | GROSS Bioretention Detention Infiltration Trench Stormwater planters Cisterns Grass channel/ Filter Strip Rooftop Facilities and Biotech Park Zone

94 2008 NEWARK CAMPUS CAPACITY STUDY AYERS | SAINT | GROSS Reforestation/ impervious cover removal Linear bioretention/ Bioswale Perimeter bioretention Grass channel/ filter strip Bioretention islands Infiltration Permeable pavers Parking Facilities and Biotech Park Zone

95 2008 NEWARK CAMPUS CAPACITY STUDY AYERS | SAINT | GROSS Bioretention Grass channels Reforestation Native vegetation Turf Facilities and Biotech Park Zone

96 2008 NEWARK CAMPUS CAPACITY STUDY AYERS | SAINT | GROSS Existing Conditions Facilities and Biotech Park Zone

97 2008 NEWARK CAMPUS CAPACITY STUDY AYERS | SAINT | GROSS Proposed Conditions Facilities and Biotech Park Zone Stream Restoration

98 2008 NEWARK CAMPUS CAPACITY STUDY AYERS | SAINT | GROSS Preliminary Opportunities Stream/Outfall Repair (FBS) Invasive Plant Removal (FBI) Facilities and Biotech Park Zone

99 2008 NEWARK CAMPUS CAPACITY STUDY AYERS | SAINT | GROSS Preliminary Opportunities $ $100K Facilities and Biotech Park Zone

100 2008 NEWARK CAMPUS CAPACITY STUDY AYERS | SAINT | GROSS Conclusions University of Delaware Restoration Opportunities Stormwater Retrofits Outfall/ Stream Repair Buffer Restoration Invasive Plant Species Management

101 2008 NEWARK CAMPUS CAPACITY STUDY AYERS | SAINT | GROSS Conclusions University of Delaware Restoration Opportunities Stormwater Retrofits Outfall/ Stream Repair Buffer Restoration Invasive Plant Species Management

102 2008 NEWARK CAMPUS CAPACITY STUDY AYERS | SAINT | GROSS End

103 2008 NEWARK CAMPUS CAPACITY STUDY AYERS | SAINT | GROSS Conclusions University of Delaware Restoration Opportunities A copy of table in full won’t really be readable and is not necessarily a strong way to end a presentation. How about a collection of practices to implement or emulate? SEE NEXT SLIDE- otherwise I need to replace this with the revised table.. JD