Design of Roadway Drainage Systems Using Geocomposite Drainage Layers by Barry R. Christopher, Ph.D., P.E.

Similar presentations


Presentation on theme: "Design of Roadway Drainage Systems Using Geocomposite Drainage Layers by Barry R. Christopher, Ph.D., P.E."— Presentation transcript:

1 Design of Roadway Drainage Systems Using Geocomposite Drainage Layers by Barry R. Christopher, Ph.D., P.E.

2 PAVEMENT DESIGN TRAFFIC LIFE-CYCLE COST ANALYSIS FAILURE CRITERIA MINIMUM THICKNESS, etc. ENVIRONMENT STRUCTURAL MODEL MATERIALS CONSTRUCTION COSTS RIDEABILITY STRUCTURAL DESIGN

3 OPTIMUM INVESTMENT LEVEL RELIABILITY (pavement condition) PRESENT WORTH OPTIMUM 100 %50 % TOTAL COST FUTURE INVESTMENT Maint., Rehab., User, etc. INITIAL COST

4 CONSIDERATIONS IN PAVEMENT DESIGN   Continuous & Rapid Deterioration with Time   Repeated & Dynamic Loading   Different Load Magnitudes & Configurations   Traffic Distribution and Growth   Change Materials Properties & Characteristics  Drainage   Contamination of Road Materials

5 FAILURE CRITERIA IN PAVEMENTS   RUTTING   FATIGUE CRACKING   THERMAL CRACKING   REFLECTION CRACKING   CONTAMINATION   DRAINAGE/ MOISTURE

6 MECHANISTIC-EMPIRICAL FRAMEWORK IN THE 2002 PAVEMENT DESIGN GUIDE.

7   Temperature   Precipitation   Humidity   Depth to Water Table   Frost Susceptibility   Capillary rise Potential ENVIRONMENTAL / CLIMATIC FACTORS FACTORS

8 Water in the Pavement Structure Primary Cause of Distress

9 Standing water in a pavement indicates low permeability and poor drainage

10 Tire Subgrade DRAINAGE

11 LOADED FLEXIBLE PAVEMENT Deflection of Aggregate Base Free Water Wedge Hydrostatic Pressure Deflection of Subgrade Direction of Travel

12

13 Under traffic loading, water and base material squirting up through joint in PCC pavement

14 Loaded PCC Pavement Free Water Hydrostatic Pressure or Water Jet Direction of Traffic Water is Violently Displaced Carrying Suspended Fines

15 JOINT DETERIORATION

16 Water in Pavements Summary Stripping in HMA Loss of Subgrade Support Reduction of Granular Layer Stiffness Erosion of Cement-Treated Base Layers Reduction in the Pavement Service Life If Base Is Saturated for Sometime Debond between Layers

17 Three important components for a good pavement design Drainage Drainage Drainage

18

19

20 AASHTO Drainage Definitions Quality of Drainage Excellent Good Fair Poor Very Poor Water Removed Within* 2 Hours 1 Day 1 Week 1 Month Water will not Drain AASHTO Guide for Design of Pavement Structures, 1993 *Based on time to drain

21

22 Crushed Outlet Clogged Outlet

23 Time To Drain  For two lane road - Lane width = 24 ft, Slope = 0.01 Base k time to drainQuality OGB 1000 ft/day 2 hrs to drainExcellent DGAB 1 ft/day1 weekFair DGAB w/ fines 0.1 ft/day1 monthPoor Reality no drainsdoes not drainVery Poor

24 Geocomposite Drain Requirements   Sufficient stiffness to support traffic without significant deformation under dynamic loading   Inflow capacity > infiltration from adjacent layers   Sufficient transmissivity to rapidly drain the pavement section and prevent saturation of the base   Sufficient air voids within geo-composite to provide a capillary break

25 Drainage Geocomposite - Important Properties   Transmissivity = 4500 ft 2 /day (0.005 m 2 /sec)   Estimated Discharge: 30 ft 3 /day /ft   Creep Resistance under high Loads   Long-term Resistance to Compression   Stability Traffic Loads = Univ. of Illinois Study   Effective Porosity = 0.7   Geotextile Filtration Requirements

26 l l Design guidance for a new alternative drainage method   Horizontal geocomposite drainage layer tied directly and continuously into an edge drain system.   RoaDrain™ 100-2 by the Tenax Corporation)   Current AASHTO and Corps of Engineers pavement design codes l l Application   Used directly to replace drainable aggregate layers in rigid or flexible pavement systems, or   Enhance the drainage of dense graded aggregate layers often used in flexible and rigid pavement systems. Design Manual for Roadway Geocomposite Underdrain Systems: SCOPE

27 Factors Affecting The Design   Pavement slopes   Aggregate gradation   Porosity and effective porosity   Layer saturation   Permeability

28 Pavement Slopes SxSx SRSR S W LRLR () SSS Rx =+ 22 05. LRLR W S SXSX =        1 2 0.5 TanA S SXSX () =      

29 Pavement Slopes  Surface and subsurface slopes  Always positive S R  Recommended slopes:  0.02 m/m (normal conditions)  0.025 m/m (high rainfall)  Surface and subsurface slopes  Always positive S R  Recommended slopes:  0.02 m/m (normal conditions)  0.025 m/m (high rainfall)

30 t=T x m x 24 Time-to-Drain Calculation m-factor (days) Time factor Time to drain (hrs)

31 Time to drain t = T x m x 24 t = T x m x 24 where, t = time to drain in hours T = Time Factor T = Time Factor m = “m” factor m = “m” factor S l = L R S r /H

32 How to Estimate Time to Drain (t)   Input:   S and S x   W, H, k,  d, G sb, WL (for permeable base)   Interim Output:   S R, L R, S 1 {S 1 = (L R x S R )/H}   T for a desirable degree of drainage (U)   N and N e   N = [1- {  d / (9.81 x G sb )}]   N e = N x WL   “m” factor: m = (N e x L R 2 ) / (k x H)   Output: t = T x m x 24 Transmissivit y

33 Time-to-Drain Sensitivity   Factors affecting time-to-drain:   Effective porosity   Coefficient of permeability   Resultant slope   Resultant length   Permeable base thickness

34 03056109151220 2 4 6 Coefficient of Permeability, m/day Time to Drain, hrs Effect of k L R = 7.6 m H = 0.15 m U = 50% S R = 0.02 m/m

35 Effect of S R.02.04.060.2.4.6.8 1 Resultant Slope, m/m Time to Drain, hrs L R = 7.6 m H = 0.15 m U = 50% N e = 0.25 k = 915 m/day

36 Effect of L R 03.67.210.814.4 1 2 Resultant Length, m Time to Drain, hrs S R = 0.02 m/m H = 0.15 m U = 50% N e = 0.25 k = 915 m/day

37 0100200300.5 1 1.5 Permeable Base Thickness, mm Time to Drain, hrs S R = 0.02 m/m U = 50% N e = 0.25 m/m k = 915 m/day L R = 7.6 m Effect of Thickness

38 1 2 3 5 7 0.01.03.10.30.60 Slope Factor (S 1 ) Time Factor (T 50 ) T for U = 50% Drained

39 RoaDrain TM Time to Drain  Case B - Beneath Pavement  Time to Drain < 10 min  Case A - Beneath Subbase  for 15 in subbase with k = 1 ft/day  Time to drain ~ 3 hours

40 Wisconsin DOT, Highway 60

41 GPR Survey

42 Conclusions  The RoaDrain TM geocomposite drainage layer is an effective alternative for pavement drainage.  Calculations based on time-to drain approach indicate:  adequate infiltration rates to handle significant storm events.  < 10 min. to drain the geocomposite layer.  < 2 hours hours to drain the road even when placed beneath moderately permeable dense graded aggregate base.  i.e. excellent drainage based on AASHTO 1998 criteria.  Five case studies in progress with 3 monitored study showing:  Excellent to good drainage following major storm events.  Geocomposite drains in subgrade found most effective, especially during spring thaw.  Geocomposite drains facilitated construction and may have improved roadway section stiffness.  FEM study shows good potential for Strain Energy Absorption

43 QUESTIONS ? www.roadrainage.com