PROJECT CARRIED OUT BY RZESZOWSKI DISTRICT UNDER THE OPERATIONAL PROGRAMME – DEVELOPMENT OF EASTER POLAND 2007 – 2013 MEASURE 1.3. – SUPPORT FOR INNOVATION.

Similar presentations


Presentation on theme: "PROJECT CARRIED OUT BY RZESZOWSKI DISTRICT UNDER THE OPERATIONAL PROGRAMME – DEVELOPMENT OF EASTER POLAND 2007 – 2013 MEASURE 1.3. – SUPPORT FOR INNOVATION."— Presentation transcript:

1 PROJECT CARRIED OUT BY RZESZOWSKI DISTRICT UNDER THE OPERATIONAL PROGRAMME – DEVELOPMENT OF EASTER POLAND 2007 – 2013 MEASURE 1.3. – SUPPORT FOR INNOVATION Development of investment areas for the construction of Rzeszów-Dworzysko Science and Technology Park Development of investment areas for the construction of Rzeszów-Dworzysko Science and Technology Park Beneficiary: Rzeszowski District

2 THE AGREEMENT WITH THE POLISH AGENCY FOR ENTERPRISE DEVELOPMENT WAS SIGNED ON 5 SEPTEMBER 2012 Financing from the Operational Programme – Development of Easter Poland, Measure 1.3 53,2 mln PLN The gross value of tasks performed under this project 78 mln PLN The own financial contribution of Rzeszowski District 21,4 mln PLN Development of investment areas for the construction of Rzeszów-Dworzysko Science and Technology Park Beneficjary: Rzeszowski District

3 Territorial development within PNT Development of investment areas for the construction of Rzeszów-Dworzysko Science and Technology Park Beneficjary: Rzeszowski District

4 Aerial photos of the PNT site Development of investment areas for the construction of Rzeszów-Dworzysko Science and Technology Park Beneficjary: Rzeszowski District

5 Development of investment areas for the construction of Rzeszów-Dworzysko Science and Technology Park Beneficjary: Rzeszowski District State of the territorial development of the PNT site Water supply network: 5,6 km

6 State of the territorial development of the PNT site Storm water drainage network: 9.4 km Development of investment areas for the construction of Rzeszów-Dworzysko Science and Technology Park Beneficjary: Rzeszowski District

7 Development of investment areas for the construction of Rzeszów-Dworzysko Science and Technology Park Beneficjary: Rzeszowski District State of the territorial development of the PNT site retention tank with fence and access road

8 sanitary sewer : 6,8 km Pumping sanitary sewage PP1, PP2, PP3 : 100 % of the task is done, State of the territorial development of the PNT site Development of investment areas for the construction of Rzeszów-Dworzysko Science and Technology Park Beneficjary: Rzeszowki District

9 State of the territorial development of the PNT site average pressure gas network: 6,2 km Development of investment areas for the construction of Rzeszów-Dworzysko Science and Technology Park Beneficjary: Rzeszowski District

10 State of the territorial development of the PNT site roads: 5,3 km Pavements: 0,8651ha bike paths: 0,9676 ha Development of investment areas for the construction of Rzeszów-Dworzysko Science and Technology Park Beneficjary: Rzeszowski District

11 State of the territorial development of PNT: The complete connection will be built for each specific inwestor by PGE under a complex agreement concluded between Rzeszowski District and PGE Dystrybucja S.A. Rzeszowski District will make payment in the amount of 17 mln PLN, thanks to which PGE Dystrybucja S.A. will build GPZ about power supply at the level of 16 MV. Each investor will be provided with electricity by PGE, hence there will be no need for inwestor to build installations from the main power supply point Development of investment areas for the construction of Rzeszów-Dworzysko Science and Technology ParkBeneficjary: Rzeszowski District

12 Anex with PAED on extending the project: The anex with the Polish Agancy for Enterprise Development on extending the project about the second stage was signed on 4 February 2014. Task covered by the anex: Territorial development of additional 24,9 ha located in the Town and Commune of Głogów Małopolski Innovative fotovoltaic farm with an area of 2 ha about the power energy of 1 MWh per a month regulations of the ditch No 5 which drains the rain water from the area of the Park to the Black River Development of investment areas for the construction of Rzeszów-Dworzysko Science and Technology Park Beneficjary: Rzeszow ski District

13 Anex with PAED on extending the project: Development of investment areas for the construction of Rzeszów-Dworzysko Science and Technology Park Beneficjary: Rzeszowski District

14 I quarter of 2015 – beginning of the territorial development of additional PNT area - 24,9 ha III quarter of 2015 - complition of the territorial development 24,9 ha IV quarter of 2015 - start the process of introducing investors to the area of 24,9 ha September 2015 - completion of the project implementation PROJECT IMPLEMENTATION SCHEDULE 2015 Development of investment areas for the construction of Rzeszów-Dworzysko Science and Technology Park Beneficjary: Rzeszowski District

15 On 12.02.2014 the Council of Ministers adopted a draft regulation amending the regulation on Special Economic Zone EURO PARK MIELEC. This regulation incorporates into the zone the land with an area of 110 ha including the land situated in the Science and Technology Park Rzeszów-Dworzysko Development of investment areas for the construction of Rzeszów-Dworzysko Science and Technology Park Beneficjary: Rzeszowski District

16  COMPLETE DEVELOPMENT OF 84,1 HA OF LAND  WINNING OVER 21 INVESTORS TO 2020 CURRENTLY, RZESZOWSKI DISTRICT IS IN TALKS WITH 6 POTENTIAL INVESTORS WHO ARE PLANNING TO EMPLOY AROUND 1,000 PEOPLE RIGHT AFTER THE CONSTRUCTION OF FACTORIES. Result indicator of the project Development of investment areas for the construction of Rzeszów-Dworzysko Science and Technology Park Beneficjary: Rzeszowski District

17 PARK LOCATION Development of investment areas for the construction of Rzeszów-Dworzysko Science and Technology Park Beneficjary: Rzeszowski District The area of Park is adjacent to the railway line E30 Rzeszow-Krakow and ultimately will be connected with E40, S9 and S19. giving PNT a good location to major communication routes

18 THANK YOU FOR YOUR ATTENTION JÓZEF JODŁOWSKI STAROST OF DISTRICT OF RZESZOW Contakt: WALDEMAR PIJAR – Project Coordinator tel.17 867 14 21 i 22, tel. mobile 795 431 423 e-mail: waldemar.pijar@powiat.rzeszow.pl Development of investment areas for the construction of Rzeszów-Dworzysko Science and Technology Park Beneficjary: Rzeszowski District