About Water Purification Station Changgen Yang. Main water purification station. It is too high in this plot, we would like to change to ~4m. It is located.

Similar presentations


Presentation on theme: "About Water Purification Station Changgen Yang. Main water purification station. It is too high in this plot, we would like to change to ~4m. It is located."— Presentation transcript:

1 About Water Purification Station Changgen Yang

2 Main water purification station. It is too high in this plot, we would like to change to ~4m. It is located 50m south of the intersection point of the construction tunnel with main tunnel 13m 11m

3 A B C Pump for water transfer Pump for water circulation Pump for waste water Seepage water Water pre-treatment Pure Water System City water Pool 0# Pool 3# Pool 1#Pool 2# Drain stainless pipeline for water pool filling pressure pump circulation pump waste water pump pressure pump circulation pump waste water pump DN65 flux 1.7 km Attenuation:0.4MPa DN65 flux 1.7 km Attenuation:0.4MPa pressure pump sink Waste water pool, pump inside Pool #0 dry pump room pressure pump waste water pool waste water pump waste water level Further calculation needed to see if we can share the pump in the circulation System - it may waster energy to do so since the lift path needn’t be large.l city water pool waste water waste water pump room pressure pump room pure water pipeline system - s. steel exchange water pipeline - plastic or s. steel pre-treatment water pipeline - plastic or Carbon steel. Use canal above. waste water pipeline - plastic or Carbon steell

4 A One may use the same pump for water circulation and water transfer between pool 1~3 and pool 0, but these pumps may different for different purpose. B It is possible to use the tunnel seepage water if we add a pre- treatment at least to filter the seepage water, the estimated cost is about 30k$. C One can put all the pumps in the sump, the sump exit can be in the EH (crane access easier but ditch will be needed from water circulation room to the sump ), or in the water circulation room (no crane and no ditch). Put the water circulation pump in the water pool may not good because it’s operation might cause noise to the PMTs.

5 Move the pump pit to the other corner of the pool or directly to the water purification room? (need a crane to lower pump) water well drain strobe RPC rail RPC rail travel limit scale Unit for pipe diameter is mm, others m concrete spray-concrete armor plate brick wall crane hook limit fire doors #3 laboratory diagram (detectors 2x2) Low noise lab Shelter room toilet Main tunnel Gas room Electro- nics room Water purification room Emergency exit fire door Control cabinet