1 Montgomery County Rapid Transit System (RTS) Service Planning and System Integration Study Steering Committee Meeting Presented to Montgomery County Department of Transportation Presented by Dan Goldfarb, P.E. Chris Conklin, P.E. Vanasse Hangen Brustlin, Inc. December 17, 2013

2 Montgomery County Rapid Transit System (RTS) Service Planning and System Integration Study Presentation Overview Review Project Status Present Integrated Service Plan Concepts MD Route 355 - N Frederick Rd/N Frederick Ave/S Frederick Ave/Rockville Pike/Wisconsin Ave Randolph Road/North Bethesda Transityway Feedback

3 Montgomery County Rapid Transit System (RTS) Service Planning and System Integration Study Study Team Activities Reviewed Previous Reports Compiled Existing Conditions Data Provided Comment on the Countywide Transit Corridor Functional Master Plan Draft Developed System Cost Estimate Developed Service Integration Concepts Working on Developing Corridor Specific Service Plans → Last 2 Corridors Accepting the Countywide Transit Corridor Functional Master Plan Infrastructure

4 Montgomery County Rapid Transit System (RTS) Service Planning and System Integration Study Linked System Overlay Concepts Veirs Mill Road (MD 586) University Blvd. (MD 193) Georgia Avenue (MD 97) New Hampshire Avenue (MD 650) Colesville Road (US 29) Randolph Road /North Bethesda Transitway Rockville Pike (MD 355) North & South

5 Montgomery County Rapid Transit System (RTS) Service Planning and System Integration Study Connectivity Focus of Service and Integration Study Activity Centers (Montgomery College, Twinbrook) Transfer Points (Rockville, White Flint, White Oak) Multimodal Opportunities and Connections (MARC, Red Line, Purple Line)

6 Montgomery County Rapid Transit System (RTS) Service Planning and System Integration Study Land Use - Production Side (Randolph Road)

7 Montgomery County Rapid Transit System (RTS) Service Planning and System Integration Study Land Use - Attraction Side (Randolph Road)

8 Montgomery County Rapid Transit System (RTS) Service Planning and System Integration Study Land Use – Production Side (MD 355)

9 Montgomery County Rapid Transit System (RTS) Service Planning and System Integration Study Land Use – Attraction Side (MD 355)

10 Montgomery County Rapid Transit System (RTS) Service Planning and System Integration Study Busway Treatments (Randolph Road) Assumption from Countywide Transit Corridors Functional Master Plan (Draft) Based on Proposed Treatment Service Plan Concepts Flexible

11 Montgomery County Rapid Transit System (RTS) Service Planning and System Integration Study Busway Treatments (MD 355) Assumption from Countywide Transit Corridors Functional Master Plan (Draft) Based on Proposed Treatment Service Plan Concepts Flexible

12 Montgomery County Rapid Transit System (RTS) Service Planning and System Integration Study SERVICE PLANNING CONCEPTS RTS Route Randolph Road/North Bethesda Transitway

13 Montgomery County Rapid Transit System (RTS) Service Planning and System Integration Study Randolph Rd/N Bethesda TransitwayService Plan  Provide Faster East-West Transit Options Northern Purple Line - Light  Key Connections Montgomery Mall White Flint Glenmont White Oak  Diverse Land Use  Stable Neighborhoods  Developing Commercial Centers  Future Connections

14 Montgomery County Rapid Transit System (RTS) Service Planning and System Integration Study Randolph Rd/N Bethesda TransitwayService Plan Route Structure Trunk Portion Montgomery Mall to University Blvd (11.1 miles) Every Other Trip to White Oak via New Hampshire Ave (2.6 miles) or Randolph Rd and U.S. 29 (5.4 miles) Service Headway (minutes)Speed (mph) AM Off- Peak PMAM Off- Peak PM Existing 1 15 13.714.812.6 RTS 2,3,4 10 14.017.014.0 Difference 55---4.06.75.7 Percent Travel Time Savings -- 2%15%11%

15 Montgomery County Rapid Transit System (RTS) Service Planning and System Integration Study Randolph Rd/N Bethesda TransitwayService Plan Modifications to Local Service  Metrobus Route C8 would serve as the local option between White Flint and White Oak.  Ride On Route 10 would serve as the local option between Twinbrook and White Oak.

16 Montgomery County Rapid Transit System (RTS) Service Planning and System Integration Study Randolph Rd/N Bethesda TransitwayService Plan Recommended Phasing Phase I Enhanced limited stop bus service along the Randolph Road Corridor between White Flint and White Oak/FDA with peak period service at 10-minute headways. Phase II Enhanced limited stop bus service along the Randolph Road Corridor between Montgomery Mall and White Oak/FDA with 10-minute headways. Service between Montgomery Mall and New Hampshire Avenue would operate with a 10-minute frequency, while service to White Oak/FDA would be have a 10-minute effective headway with 20-minute headway along New Hampshire and Randolph/US 29. Phase III As ridership increases and demand warrants, headways will be increased to accommodate the level of demand. According to the ridership projections in the CTCFMP, peak demand in the future would warrant six minute headways in the peak period and eight minute headways in the mid-day.

17 Montgomery County Rapid Transit System (RTS) Service Planning and System Integration Study SERVICE PLANNING CONCEPTS RTS Route MD 355

18 Montgomery County Rapid Transit System (RTS) Service Planning and System Integration Study MD 355 Service Plan  Provide Faster Transit Option for Commuters from Clarksburg to Rockville  Key Connections Clarksburg Metropolitan Grove (MARC) Gaithersburg Montgomery College Rockville Twinbrook White Flint Grosvenor Bethesda  Connecting Developing Commercial Centers  Multimodal Transit Connection

19 Montgomery County Rapid Transit System (RTS) Service Planning and System Integration Study MD 355 Service Plan Route Structure Trunk Route Between Metropolitan Grove and Grosvenor (11.8 miles) Branch 1 to Clarksburg (6.7 miles)* Branch2 to Friendship Heights (4.5 miles )** Service Headway (minutes)Speed (mph) AMOff-PeakPMAMOff-PeakPM Existing 1 15 14.715.614.4 RTS 2,3,4 1010/301017.019.017.0 Difference 5552.33.42.6 Percent Travel Time Savings -- 16%22%18%

20 Montgomery County Rapid Transit System (RTS) Service Planning and System Integration Study MD 355 Service Plan Modifications to Local Service  Portions of Ride On Routes 34, 46, 55, & 75 would be realigned to continuously operate along the corridor and service as the local option for RTS.  All Metrobus J routes would take advantage of the proposed RTS infrastructure at any time they are operating on MD 355.

21 Montgomery County Rapid Transit System (RTS) Service Planning and System Integration Study MD 355 Service Plan Recommended Phasing Phase I Enhanced limited stop bus service (e.g., Metro Extra) along the MD 355 Corridor between the Lake Forest Transit Center and Friendship Heights with peak period service at 10-minute headways. Phase II Enhanced limited stop bus service between Clarksburg and Friendship Heights with 10-minute peak period headways and 30-minute peak period headways between Clarksburg and Montgomery College and Montgomery College and Friendship Heights. The headway will be 10 minutes all day for service between Metropolitan Grove (pending Watkins Mill overpass) and Grosvenor. Phase III All-day RTS service utilizing the two-lane median busway will be provided, with 10-minute headways all-day between Metropolitan Grove and Grosvenor. Branch Service will be provided between Clarksburg and Montgomery College and Montgomery College and Friendship Heights at 10- minute peak period and 30-minute off-peak period headways.

22 Montgomery County Rapid Transit System (RTS) Service Planning and System Integration Study QUESTIONS

23 Montgomery County Rapid Transit System (RTS) Service Planning and System Integration Study 23

24 Montgomery County Rapid Transit System (RTS) Service Planning and System Integration Study 24

25 Montgomery County Rapid Transit System (RTS) Service Planning and System Integration Study 25

26 Montgomery County Rapid Transit System (RTS) Service Planning and System Integration Study 26

27 Montgomery County Rapid Transit System (RTS) Service Planning and System Integration Study 27

28 Montgomery County Rapid Transit System (RTS) Service Planning and System Integration Study 28

29 Montgomery County Rapid Transit System (RTS) Service Planning and System Integration Study 29


Download ppt "Montgomery County Rapid Transit System (RTS) Service Planning and System Integration Study Steering Committee Meeting Presented to Montgomery County Department."

Similar presentations


Ads by Google