Presentation is loading. Please wait.

Presentation is loading. Please wait.

SETTLEMENT AGREEMENT REPORT October - December 2009 Technical Oversight Committee March 2, 2010 Pam Lehr Section Leader Restoration Sciences Department.

Similar presentations


Presentation on theme: "SETTLEMENT AGREEMENT REPORT October - December 2009 Technical Oversight Committee March 2, 2010 Pam Lehr Section Leader Restoration Sciences Department."— Presentation transcript:

1 SETTLEMENT AGREEMENT REPORT October - December 2009 Technical Oversight Committee March 2, 2010 Pam Lehr Section Leader Restoration Sciences Department

2 S UMMARY

3 A.R.M Loxahatchee National Wildlife Refuge Monthly Total Phosphorus Geometric Mean Concentrations

4 A.R.M Loxahatchee National Wildlife Refuge Deviation of monthly geometric mean total phosphorus concentrations with calculated long-term levels

5 Loxahatchee National Wildlife Refuge Total Phosphorus Compliance Tracking

6 Refuge TP Compliance Tracking for October 2009 – February 2010

7 Flow-weighted Mean Concentrations Inflows to ENP through Shark River Slough 12-month FWMC at the end of each water year compared to the TP interim and long-term limits

8 Flow-Weighted Mean Concentrations Inflows to ENP through Shark River Slough 12-month FWMC at the end of each month and the composite TP concentration for each sampling event

9 Shark River Slough TP Concentration Compliance Tracking

10 Shark River Slough TP Concentration Compliance Tracking for October 2009 – December 2009

11 Shark River Slough Daily Flows

12 Daily Flows at individual inflow structures to Shark River Slough

13 Daily Flows at S333 and S334

14 Shark River Slough Sampling Event Daily Flows and FWMC Daily flow at Shark River Slough structures and the corresponding TP FWMCs for individual sampling events

15 The 12-month FWMC at the end of each water year compared to the 11 ppb long-term total phosphorus limit TP Flow-Weighted Mean Concentrations Inflows to the ENP through Taylor Slough and the Coastal Basins

16 TP Flow-Weighted Mean Concentrations Inflows to the ENP through Taylor Slough and the Coastal Basins The 12-month FWMC at the end of each month and the composite TP concentration for each sampling event

17 Taylor Slough and the Coastal Basins TP Concentration Compliance Tracking

18 Taylor Slough and the Coastal Basins TP Concentration Compliance Tracking for October 2009 – December 2009

19 Taylor Slough and S18C Daily Flows Daily flows into Everglades National Park through Taylor Slough and S18C

20 Daily Flows at individual Taylor Slough structures into the ENP

21 Taylor Slough and S18C Sampling Event Flows and FWMC Daily flows at Taylor Slough structures and S18C and the corresponding TP for individual sampling events


Download ppt "SETTLEMENT AGREEMENT REPORT October - December 2009 Technical Oversight Committee March 2, 2010 Pam Lehr Section Leader Restoration Sciences Department."

Similar presentations


Ads by Google