ICT 1 A heuristic for maritime inventory routing Oddvar Kloster, Truls Flatberg Molde, 2009-09-22.

Similar presentations


Presentation on theme: "ICT 1 A heuristic for maritime inventory routing Oddvar Kloster, Truls Flatberg Molde, 2009-09-22."— Presentation transcript:

1 ICT 1 A heuristic for maritime inventory routing Oddvar Kloster, Truls Flatberg Molde, 2009-09-22

2 ICT 2 Overview Background Model Algorithms Test example

3 ICT 3 Invent Software library to solve generic Inventory Routing Problems Primary focus on routing and inventories Upstream/downstream activity disregarded Contractual and economic aspects Tramp shipping, industrial shipping and combinations Prototype with initial construction algorithm, genetic algorithm and nascent optimization Three applications used as pilot studies Cement - multiple products, short horizon, no spot Chemical tankers - tramp and inventory, multiple products, cleaning, tank handling LNG - single product, long term, contracts, full loads

4 ICT 4 Model features (1) Heterogeneous vessels One or more tanks with volume capacities Or, simple stowage (max products) Ports, with storages Variable production/ consumption rates Partly interruptible Storage capacities Per-vessel time/distance/cost table

5 ICT 5 Model features (2) Multiple products Keep track of quantity, weight and volume Fixed or variable densities Cleaning of tanks between products Load and discharge rates Boil-off Product evaporates during sailing Full vessel loads Leave from production ports with full loads Discharge completely in consumption port except for boil-off needs

6 ICT 6 Model features (3) Bookings Transportation demands not related to storages Contracts Limit amount delivered to certain ports in certain periods Define prices

7 ICT 7 Model features (4) Priority on storages and contracts Arrival and departure load limits (draft restrictions) Port closure periods Vessel maintenance periods Vessel-port compatibility Restrict # visits to storage in period Inter-arrival gaps

8 ICT 8 Plan structure Action Vessel Port stay Port Storage Port Booking

9 ICT 9 Objectives Basic objectives Income (contract, stream, booking) Cost (sailing, port stay, cleaning) Performance (quantity transported) Penalized constraints Combined objectives Weighted sum Lexical (prioritized)

10 ICT Solution strategy Work with concrete plans Violate constraints by doing too little → penalize Stockout/overflow Unserviced booking Contract limit not met Too few visits in time period Add activities, as efficiently as possibly When doing too much, try delaying 10

11 ICT 11 Construction: overview Start with empty plan Identify earliest (highest priority) penalty event Stockout/overflow Unserviced booking Contract limit Too few visits in time period Generate journeys Rank journeys Add best journey and repeat If no fix found, forget event … until there are no more penalty events

12 ICT 12 Construction: journey generation One storage/booking/contract given Choose (Contract) Counterpart storage (Counterpart contract) Vessel Insertion points P1 P2

13 ICT 13 Construction: journey insertion Large parts of the plan may be affected Schedule for selected vessel changes after new load action Schedules for other vessel are unchanged Schedules may change for storages visited by selected vessel Many constraints to satisfy Roughly: Assume small quantity and propagate time Find maximum possible quantity (including tank allocation) Set quantity, propagate time and quantities Insert tank cleaning actions Check feasibility If necessary, delay and repeat

14 ICT 14 Construction: journey ranking Evaluate criteria for each journey Transport large quantity Short sailing time Large quantity/vessel capacity Large quantity/sailing time Low cost/quantity... Random Sort journeys for each criterion Final score is weighted sum of ranks

15 ICT 15 Genetic algorithm Population of individuals Each individual’s genome is a set of weights Fitness of each individual is evaluated by applying the construction algorithm Weights for new individuals drawn around parents’ weights (+ mutation)

16 ICT 16 Optimization Remove a bit of the solution Any journey starting or ending in random (~10%) interval Compact solution Regenerate the missing part Use criteria weights from the best GA individuals Accept if better or promising Avoid known solutions by objective value

17 ICT Test case LNG. 1 product, boil-off, full loads 2 production ports Fixed purchase price Fixed production rate 2 consumption ports Some interruption allowed Fixed sales price on send-out 3 identical vessels 360 day horizon 17

18 ICT 18

19 ICT 19

20 ICT 20 Example run (GA)

21 ICT 21 Example run (optimization)

22 ICT 22 A heuristic for maritime inventory routing Oddvar Kloster, Truls Flatberg Molde, 2009-09-22