Presentation is loading. Please wait.

Presentation is loading. Please wait.

Simulation of Georgia Mountain Wind Project, Vermont (2.5 miles) Simulation by Saratoga Associates and Northeast Wind Wind Energy: Toward Building Consensus.

Similar presentations


Presentation on theme: "Simulation of Georgia Mountain Wind Project, Vermont (2.5 miles) Simulation by Saratoga Associates and Northeast Wind Wind Energy: Toward Building Consensus."— Presentation transcript:

1 Simulation of Georgia Mountain Wind Project, Vermont (2.5 miles) Simulation by Saratoga Associates and Northeast Wind Wind Energy: Toward Building Consensus THE VISUAL IMPACTS PROBLEM Jean Vissering Landscape Architecture

2 Gas Station along Scenic Section of Interstate 89, Vermont

3 Simulation of 5-turbine Georgia Mountain Wind Project, Vermont (portion) (.7 miles) Simulation by Saratoga Associates

4 Simulation of Granite Reliable Wind Project, New Hampshire (2.6 miles) Simulation by Northeast Wind

5 Vermont Yankee Nuclear Power Station ► West Virginia Coal Plant

6 Fenner Wind Project, New York Photograph by John Zimmerman, Northeast Wind

7 Scale (Size) Height Horizontal Scale (# turbines) San Gorgonio Wind Facility, California Photo by David Polanski

8 Simulation of 15-tTurbineDeerfield Wind Project, Vermont (6.1 miles) Simulation by Northeast Wind

9 Panorama View of 15-turbine Deerfield Wind Project Site, Vermont, (6.1 Miles Away) Haystack Mountain Factors reducing visual impacts: Distance Away Cultural vs. Natural Context Occupies Limited portion of the View Project would appear lower in elevation and away from major focal point.


Download ppt "Simulation of Georgia Mountain Wind Project, Vermont (2.5 miles) Simulation by Saratoga Associates and Northeast Wind Wind Energy: Toward Building Consensus."

Similar presentations


Ads by Google