Presentation is loading. Please wait.

Presentation is loading. Please wait.

Kevin Tran Sewon Kim.  Why do we need criteria?  Origin of procurement criteria  Typical criteria  How do we decide the priority  Conclusion  References.

Similar presentations


Presentation on theme: "Kevin Tran Sewon Kim.  Why do we need criteria?  Origin of procurement criteria  Typical criteria  How do we decide the priority  Conclusion  References."— Presentation transcript:

1 Kevin Tran Sewon Kim

2  Why do we need criteria?  Origin of procurement criteria  Typical criteria  How do we decide the priority  Conclusion  References

3

4 1.Why do we need criteria?

5  A lot of clients, needs  To meet the needs of the purchaser

6 2.Origin of procurement criteria

7 Developing a strategy for the project on the basis of the client’s needs

8  ‘Thinking about Building’  8 procurement factors

9  The importance of appropriate procurement route

10 3.Typical criteria

11 1. Time

12 2. Quality

13 3. Cost

14 4. Complexity

15 5. Controllable variation

16 6. Degree of competition

17 7. Client responsibility

18 8. Risk in the project

19 4.How do we decide the priority

20  Using the survey  10 criteria  Scale 1-10

21

22

23

24  Using the χ ² test

25  Using the Friedman one-way Anova  The higher value, the higher priority

26 5.Conclusion

27  A lot of values and client  Priority is different from every clients  Decide to depending on the needs of client

28 6.References

29   NEDO (1985)., ‘Thinking about building - a successful business consumer’s guide to using  the construction industry’, Building Economic Development Committee, London.   Latham, Michael, (1994). Constructing the Team, Final Report of the Government/Industry  Review of Procurement and Contractual Arrangements in the UK Construction Industry,  HMSO, London.   Turner, A. (1990). Building Procurement. Macmillan, London.   Rowlinson, S.M., and Newcombe, R. (1984). ‘Comparison of Procurement Forms for  Industrial Buildings in the UK’ The 4th International Symposium on Organisation and  Management of Construction, University of Ontario, Canada.   Brian Cooke and Peter Williams, (2009), ‘Construction Planning, Programming and Control’,


Download ppt "Kevin Tran Sewon Kim.  Why do we need criteria?  Origin of procurement criteria  Typical criteria  How do we decide the priority  Conclusion  References."

Similar presentations


Ads by Google