Presentation is loading. Please wait.

Presentation is loading. Please wait.

1 2 3 4 5 6 7 STOP 2 PASCUA-LAMA PROJECT View from Portal Site looking NNW at El Morro Oeste El Morro Oeste Frontera Trend.

Similar presentations


Presentation on theme: "1 2 3 4 5 6 7 STOP 2 PASCUA-LAMA PROJECT View from Portal Site looking NNW at El Morro Oeste El Morro Oeste Frontera Trend."— Presentation transcript:

1

2

3 STOP 2 PASCUA-LAMA PROJECT View from Portal Site looking NNW at El Morro Oeste El Morro Oeste Frontera Trend

4 Pascua Extension Frontera Zone El Morro Oeste Pit Limit Pascua Fault Norte Fault PASCUA-LAMA PROJECT View from Penelope looking WNW towards Pascua STOP 3

5 STOP 4 View from El Morro PASCUA-LAMA PROJECT

6 Penelope Deposit Portal Pascua Fault Penelope Fault Pascua Extension STOP 5 PASCUA-LAMA PROJECT View from Rio Turbio Valley looking SW at Pascua Trend RDH g/t Au DDH g/t Au RDH g/t Ag

7 Penelope Deposit Brecha Penelope STOP 6 PASCUA-LAMA PROJECT Pascua Fault Zone View from Lama Camp looking WNW towards Penelope Discovery Hole RDH g/t Au RDH g/t Au

8 Lama Central El Morro Oeste Penelope Frontera Pascua Extension Nevada Norte Open Pit PASCUA-LAMA PROJECT View from Lower Rio Turbio looking WNW towards Pascua STOP 7 (Optional)

9


Download ppt "1 2 3 4 5 6 7 STOP 2 PASCUA-LAMA PROJECT View from Portal Site looking NNW at El Morro Oeste El Morro Oeste Frontera Trend."

Similar presentations


Ads by Google