Presentation is loading. Please wait.

Presentation is loading. Please wait.

Project of construction work Church of the Nazarene “C UTERVO – CAJAMARCA - PERU”

Similar presentations


Presentation on theme: "Project of construction work Church of the Nazarene “C UTERVO – CAJAMARCA - PERU”"— Presentation transcript:

1 Project of construction work Church of the Nazarene “C UTERVO – CAJAMARCA - PERU”

2 Geographic Location Cutervo, province of the departament of Cajamarca, has a population of about 138 thousand people.

3 CURRENT STATE OF THE TEMPLE The temple has 3 floors of rustic material, that is, adobe and stone. It is 45 years old. DECLARED IN EMERGENCY BY CIVILDEFENSE

4 DESIGN OF CONSTRUCTIÓN Construction Project Cost S/. 800 000 40 % self- finacing nature 60 % national & international help.

5 FINAL CONSTRUCTION TEMPLE 3 floors of 15 x 30 meters First floor : a public funeral awake. Second floor: A mini auditorium and clasrooms for workshops. Third floor:Temple, P astoral and administrative house.

6 THANKS With your help, we will get our dream and getting souls for the Kingdom of Christ. Committee pro-construction


Download ppt "Project of construction work Church of the Nazarene “C UTERVO – CAJAMARCA - PERU”"

Similar presentations


Ads by Google