BUILDING STRONG ® USACE/FEMA 2011 Remedial Action Program Workshop December 6-9, 2011 Orlando, FL
2
BUILDING STRONG ® Temporary Emergency Power Mission 2011 USACE/FEMA RAP Workshop
3
BUILDING STRONG ® Temporary Power Mission Capabilities and Improvements USACE Resources: 7 PRT’s, DTOS’s, 249 th Engineer Battalion, 3 ACI Contracts, World Wide Power Contract FEMA: ~800 generators at 4 CONUS DC’s and 3 OCONUS DC’s. Pre-Scripted Mission Assignments developed for 4 different “Configuration Packages” for resources based on mission requirements. New tools and technology: EPFAT, Temp Power Mission Common Operating Picture (GIS modeling and mission tracking), SAVER (GIS generator tracking/data-bank).
4
BUILDING STRONG ® IssueRecommendationsStatus Temporary Emergency Power 1.Action #1: Integrate and identify gaps to current ISB and Staging area locations to interagency COP. Start Date: Jan 2012 Est. Completion Date: June 2012 Action Lead: FEMA USACE 2.Action #2: Develop list of USACE facilities for potential use as forward staging areas. Start Date: Jan 2012 Est. Completion Date: June 2012 Action Lead: USACE Ongoing Resolutions: -Some regions already have ISB locations in SAVER -Hurricane/New Madrid planning Obstacles: -Firewall and data sharing protocols PDT Members (Action #2): FEMA R5 USACE USACE national OMBIL coordinator Issue Title: Power Mission Support Site Planning Problem Statement: Lack of understanding and/or preparedness of the requirements for ISBs and staging areas for temporary emergency power. Key Discussion Points: Regions may not be aware of temp power requirements Need to have ISB/Staging area COP from both region and state and USACE
5
BUILDING STRONG ® Temporary Emergency Power IssueRecommendationsStatus 1.Action #1: Assemble PDT and draft doctrine Start Date: Jan 2012 Est. Completion Date: June 2012 Action Co-Lead: Pete Navesky, T.J. Fichera Ongoing Resolutions: - Used algorithm developed by Pittsburgh District Obstacles: 1. Lacks institutional knowledge 2. PRT Staffing limitations PDT Members: Jason Wind (FEMA) Mark Gallagher (FEMA) Tim Barnett (FEMA) Tom Murray (FEMA) Lauren Mclane (FEMA) Issue Title: Doctrine for Multi-jurisdictional ISB’s Problem Statement: Current temporary power doctrine lacks the capability to direct or instruct multi-region and multi-jurisdiction events. Key Discussion Points: FOS EM declaration and Major declaration PSMAs needed Discussion on how we will handle multi- jurisdiction Con ops development Hard part is what color money Not having enough AO’s for multi state events Resource allocation and adjudication
6
BUILDING STRONG ® Temporary Emergency Power IssueRecommendationsStatus 1.Action #1: Finalize the changes with the technology integration Start Date: April 2011 Est. Completion Date: June 2012 Action Co-Lead: Darrell Ransom (FEMA) Dave Bishop (USACE) 2.Action #2: Develop action plan to provide: outreach, demonstration and presentation to embrace concept by community Start Date: Jan 2012 Est. Completion Date: Jan 2013 Action Lead: Darrell Ransom (FEMA) Dave Bishop (USACE) Ongoing Resolutions: - Completion of program development - Continuation of PDT Obstacles: - Firewall and data sharing protocols - USACE visibility of FEMA generator transponders PDT Members: Darrell Ransom (FEMA) Dave Bishop (USACE) Dana Thorpe (FEMA) Frank Vargas (FEMA) Frank Appelfeller (USACE) Issue Title: Tools and Technology Problem Statement: Final integration of interagency technology Key Discussion Points: Great progress on: EPFAT, SAVER, LPRAT, USACE COP
7
BUILDING STRONG ® Temporary Emergency Power IssueRecommendationsStatus 1.Action #1: Develop draft concept of operations to customize the temporary power mission resources to the event. Start Date: Jan 2012 Est. Completion Date: Long Term Action Lead: Dave Bishop (USACE) 2.Action #2: Develop early pre-event planning for emergency power resources. Start Date: Jan 2012 Est. Completion Date: Long Term Action Lead: Dave Bishop (USACE) Ongoing Resolutions: -Use of EPFAT -Employment of the 249 th -Power Interagency Task Force development Obstacles: -Integration between EPFAT and ENGLink -Understanding state capabilities PDT Members: Kerri Stark (USACE) Dana Thorpe (FEMA) Jamie Clark (DOE) T.J. Fichera (USACE) Kent Weathers (FEMA) Issue Title: Customize and tailor temporary power response packages to meet mission requirements Problem Statement: USACE and FEMA have been increasingly successful at customizing Temporary Emergency Power response packages based on the anticipated requirements and/or the available funding Key Discussion Points: Better interagency coordination and early planning Use tools and technology
8
BUILDING STRONG ® Temporary Emergency Power IssueRecommendationsStatus 1.Action #1: Establish coordination procedures Start Date: Jan 2012 Est. Completion Date: June 2012 Action Lead: Bill Irwin (USACE) Jeremy Greenberg (DOT) 2.Action #2: Federal Legislative Changes Start Date: Jan 2012 Est. Completion Date: Long term Action Lead: Bill Irwin (USACE) Jeremy Greenberg (DOT) Ongoing Resolutions: - Will provide more rapid issuance of permits through a network -ID regional reps at DOT to facilitate issuance of permits Obstacles: -DOT determined that there is not a current viable federal waiver option PDT Members: Tommy Welden (FEMA) Chris Dresel (USACE) Michelle Anderson (FEMA) Issue Title: Transportation of oversized and overweight power resources Problem Statement: USACE generator leasing contractor had to transport oversize/overweight equipment across states lines, and these loads were detained by state police at weight stations and were unable to be delivered on time. Key Discussion Points: load coordination and movement Information transfer between contractor, region, state Standardized waivers and approvals
9
BUILDING STRONG ® Temporary Emergency Power IssueRecommendationsStatus 1.Action #1: Develop generator leasing matrix Start Date: Immediate Est. Completion Date: June 2012 Action Lead: Dave Bishop (USACE) Darrell Ransom (FEMA) Ongoing Resolutions: -Region 4 developing leasing capabilities through local contracts -National ACI will continue to assist in service and install -Work and coordinate with NEMA Obstacles: - Local contract may be impacted by disaster Issue Title: Generator Leasing Procedures Problem Statement: Lack of coordination between agencies which causes competition for the same resources Key Discussion Points: Regions are encouraged to solve at the lowest level Organic generators purpose is to meet initial requirements FEMA organic generators are a national strategic commodity
10
BUILDING STRONG ® Temporary Emergency Power IssueRecommendationsStatus 1.Action #1: Develop a buy/lease strategy that can be used during an event Start Date: Oct 2011 Est. Completion Date: June 2012 Action Lead: Darrell Ransom (FEMA) Dave Bishop (USACE) Ongoing Resolutions: -Awarded maintenance contract for FY ‘12 - Budgeted new BOM components Obstacles: - Funding for capital re-investment PDT Members: Darrell Ransom (FEMA) Dave Bishop (USACE) David Reid (FEMA) Annette Wright (FEMA) Sgt. Darling (USACE) Issue Title: Temporary power capital investment for FEMA generator inventory Problem Statement: A buy/lease strategy does not exist. Key Discussion Points: Poor FEMA fleet balance Great partnership with 249th
Similar presentations
© 2018 SlidePlayer.com Inc.
All rights reserved.
Authenticity of the bible ppt on how to treat Ppt on index numbers page Ppt on different types of computer softwares free Ppt on leadership development training Ppt on atrial septal defect closure Ppt on good engineering practices Ppt on limits and continuity examples Ppt on open cast coal mining Ppt on steps of agriculture Ppt on railway track