Presentation is loading. Please wait.

Presentation is loading. Please wait.

Design Workgroup National Monitoring Network. Introduction n Overview of Progress to Date n Al Korndoerfer, Chair of Design Workgroup.

Similar presentations


Presentation on theme: "Design Workgroup National Monitoring Network. Introduction n Overview of Progress to Date n Al Korndoerfer, Chair of Design Workgroup."— Presentation transcript:

1 Design Workgroup National Monitoring Network

2 Introduction n Overview of Progress to Date n Al Korndoerfer, Chair of Design Workgroup

3 Applying Charge from CEQ n 10 Resource Areas n Concentrated on first two Environmental Issues u Oxygen Depletion u Nutrient Enrichment n Developed Geographic Areas of concern n Developed Parameter list from charge & existing programs

4 Oxygen Depletion n Parameter list, sampling frequency, spatial resolution, probabilistic vs.. Targeted, sampling protocols n See spreadsheet

5 Nutrient Enrichment n Parameter list, sampling frequency, spatial resolution, probabilistic vs. Targeted, sampling protocols n See spreadsheet

6 Next Steps n Finalize design of first two environmental issues for all resource areas u Decide whether rivers are to be fully characterized within NMN or only monitored for loading to coastal/estuaries. n Expand concept to remaining environmental issues


Download ppt "Design Workgroup National Monitoring Network. Introduction n Overview of Progress to Date n Al Korndoerfer, Chair of Design Workgroup."

Similar presentations


Ads by Google