“Cave” presumed from Collins video to be 15’ downstream along north side of Pier 5 footing.

Similar presentations


Presentation on theme: "“Cave” presumed from Collins video to be 15’ downstream along north side of Pier 5 footing."— Presentation transcript:

1 “Cave” presumed from Collins video to be 15’ downstream along north side of Pier 5 footing

2

3

4

5

6

7

8

9

10

11

12 Upstream pier plan – Southwest corner of nose Undermining courtesy of Blueview Teledyne Plan view- south edge of leveling footer Potential for deeper penetrations picked up by scan Undermining

13 Sonar Scan Location Bridge Footer Scour/Undercut

14 Sonar Scan location ~0.75 m undercut ~4.5 m footer face

15 Face of bridge footer/leveling concrete pad Scour beyond face ~0.75 m undercut Curved concrete pier footing nose here

16 Upstream pier undermining courtesy of Blueview Teledyne