Presentation is loading. Please wait.

Presentation is loading. Please wait.

The service truck operated by the victim was parked in this area after refueling the tanks. The victim waited for the other equipment operators to break.

Similar presentations


Presentation on theme: "The service truck operated by the victim was parked in this area after refueling the tanks. The victim waited for the other equipment operators to break."— Presentation transcript:

1

2

3 The service truck operated by the victim was parked in this area after refueling the tanks. The victim waited for the other equipment operators to break for lunch. This area was sloped toward the roadway. Drainage Pond The roadway from the Highsplint work area to the Lowsplint work area was approximately 500 feet in length and an overall grade of 22 percent. Highsplint Work Area Lowsplint Work Area Outslope Highwall The road berm was an average height of 54 inches. The victim was pinned under the bed of the overturned service truck. Back dump spoil material Click to animate

4


Download ppt "The service truck operated by the victim was parked in this area after refueling the tanks. The victim waited for the other equipment operators to break."

Similar presentations


Ads by Google