Presentation is loading. Please wait.

Presentation is loading. Please wait.

WELCOME TO Presentation of NARAYANGANJ CITY CORPORATION.

Similar presentations


Presentation on theme: "WELCOME TO Presentation of NARAYANGANJ CITY CORPORATION."— Presentation transcript:

1 WELCOME TO Presentation of NARAYANGANJ CITY CORPORATION

2 MAP OF NARAYANGANJ CITY CORPORATION NARAYANGANJ CITY CORPORATION NARAYANGANJ DISTRICT

3 ABOUT NARAYANGANJ CITY Background  Narayanganj is about 17 Km Southeast of Capital Dhaka of Bangladesh. It is situated on the bank of the river Shitalakhya, at the confluence of the Shitalakhya and Buriganga rivers.  Narayanganj is well connected with the rest of the country by railway, road and river.  The river port of Narayanganj is considered as one of the busiest ports of the country  This has worked as great advantage for the location of many large and medium scale industries of the country.

4 ABOUT NARAYANGANJ MUNICIPALITY History  The Municipality was commissioned as an urban administrative unit in British period Narayanganj Mnicipality was constituted on 08 September 1876 to control an area of 4.5 square miles with a population of 27,876.  The name of the first Bangali elected Chairman of Narayanganj Municipality was Late Syed Mohammad Maleh.  In 1952, the area of Narayanganj Municipality was extended up to 7.5 sq miles by a declaration of the Dhaka Judge court.  After the liberation first election was held on Late Ali Ahmad Chunka was elected as the first Chairman of Narayanganj Municipality. He was elected two times for his popularity and qualitative leadership for perspective plan and development activities in the Municipality.

5 ABOUT NARAYANGANJ History  It is a matter of fact that there was no elected Municipal Council from 1988 to 2003 due to the demarcation dispute case filed in the court. This long period was run by Administrator.  During that period no remarkable development executed to fulfill the expectation of Municipal dwellers and as a result the infrastructures of Municipality was dilapidated for not to undertake any development activities and routine maintenance work. T ax recovery was so much lesser percentage and was quite vulnerable. The institutional capacity as well as the quality of Municipality services was so poor.  In those circumstances, the election of Narayanganj Municipality was held on 16 January Dr. Salina Hayat Ivy was elected the first Woman Chairman of Narayanganj Municipality as well as in Bangladesh.  Once upon a time it was called the Dundee of east for jute trading. It may be mentioned here that the largest Asian jute mill hereinafter called the Adamjee was established in Narayanganj. With the passage of the time,the jute trading losing its past glorious prospect day by day. I hope this past glorious prospect of jute trading should be recovered by any means.

6 ABOUT NARAYANGANJ CITY CORPORATION  Narayanganj is an important business & industrial centre and economic backbone of Bangladesh. The contribution of this city in the national economy is remarkable. Everyday approximately BDT 3000 million is transacted in banks for different trade & commerce.  Considering the above cited importance-on 05 May 2011, Narayangagnj Municipality was upgraded as City Corporation including two other adjacent Municipalities i.e Siddirganj and Kadam Rasul.  Now a days, it is densely populated area near Dhaka.The total area of Narayanganj City orporation is sq.km (including the river Shitalakhya) having population projection is about approximately million(1.4millon).

7 Establishment : 05 May, 2011 Area : sq. km (Including Shitalakhya river) Population : million (1.4 million) Ward : 27 nos. Date of last election: 30 October 2011 Present Mayor: Dr. Salina Hayat Ivy Councillor: 27 nos. Councillor in Reserved Seat : 9 nos. Date of Charge Takeover : 01 December 2011 Holding Number Government : 316 nos. Non-government : 47,701 nos. Total : 48,017 nos. Total Household: 1,65,637 nos. Total Population: 7,09,381 nos. Municipal own land : acres Trade License: nos. NARAYANGANJ CITY CORPORATION AT A GLANCE (BASIC INFORMATION)

8 Road Type BC: km CC: km RCC: km HBB: km WBM: 4.39 km BFS: km Kacha: km Tota l : km Footpath : km Drain Condition Brick Drain: km RCC Drain: km Pipe Drain: km Kacha Drain: km Total : km Solid waste Condition Daily Generated Waste: 120 ton/day Daily Collection Waste: 103 ton/day Collection Efficiency: 85.88% INFRASTRUCTURAL STATUS OF NARAYANGANJ CITY CORPORATION

9 EXISTING POST PROPOSED POST First Class : 12 Person: 68 Person Second Class : 12 Person : 48 Person Third Class : 102 Person: 435 Person Fourth Class: 50 Person: 246 Person Total : 176 Person: 797 Person CONTINGENT STAFF :495 Person:1195 Person STAFF PATTERN OF NARAYANGANJ CITY CORPORATION NARAYANGANJ CITY CORPORATION

10 PROPOSED BUDGET PROVISION FOR FY  Our proposed budget is million whereas our Revenue income is million.  We have limited resources and need cooperation from Development Partners.

11 FUTURE DEVELOPMENT STRATEGY FUTURE DEVELOPMENT STRATEGY

12  Preparation of City Master plan.  Construction of City Corporation Building (Nagar Bhaban)  Construction of Bridges over the river Shitalakshya.  To Ensure Comprehensive Urban Planning for making Greener and Sustainable City.  Improvement of Integrated Drainage System.  a) Improvement of Existing Drainage Network.  b) Preservation & Beautification of Water Bodies (Canals, Ponds etc.).  Establishment of Integrated Solid Waste Management System through 3R ( Reduce, Reuse, Recycle ).

13  Improvement of Integrated Road Network  a) Expansion of Road Network.  b) Construction of Embankment on both sides of the river Shitalakshya.  c) Construction of Circular Road Network along the river Shitalakshya.  connecting with Dhaka-Chittagong and Dhaka-Munshigonj highway.  Ensuring 100% Sanitation Coverage.  Installation of Water Supply System with Treatment plant.  IT Infrastructure Development.  a) Tax Automation system  b) Establishment. of Office Automation system.  c) Establishment. of IT Park.

14  Improvement of Electricity Sector a) Expansion of street lighting. b) Installation of digital traffic signaling system. c) Installation of power plant  Establishment of Modern Materials Testing Laboratory.  Establishment and Improvement of Recreation Facilities a) Construction of Amusement Park. b) Construction of Playground at each ward. c) Preservation of open Space & Plantation at each Ward. d) Establishment of Tourism Spots.  Establishment of Medical Services System a) Establishment of Community Clinic b) Establishment of Ambulance Service

15  Introducing comprehensive Micro-credit programme to support the  poor Community.  Construction of low cost Housing Poor Community.  Improvement of City Traffic Facilities  a) Construction of Bus Terminal.  b) Construction of Truck Terminal.  c) Introducing City service within City Corporation(Rickshaw free city in core areas)  Construction of Income generating projects.  a) Improvement & Construction of Kitchen markets  b) Construction of Market cum Apartment Building.  c) Construction of other projects.  Improvement of Religious Places (Graveyard, Crematorium, Cemetery etc.).  Establishment of City Cultural Center and Heritage park.

16  Establishment of Educational Institutions  a) Construction of Library at each ward.  b) Establishment of Satellite School in each Ward for poor children.  c) Establishment of Modern Medical College and Hospital.  d) Establishment of Technical University.  f) Establishment of Fine Arts Institution.  Preservation of Archeological and Historical Places.  Women Education and Employment Opportunities.  Ensuring Pollution free Water of the river Shitalakshya  Ensuring City Government System.  To build awareness about natural Hazards and Disaster.  NB: Incomplete Projects will be continued for 10(Ten) years Vision.

17  Improvement of drainage System and Installation of Sewerage Line a) Improvement of Drainage Network b) Preservation & Beautification of Water Bodies ( Cannel, Ponds) c) Installation of Sewerage Line and Construction of Strom Water drainage.  Construction of Bridges over the river Shitalakshya.  Establishment of modern Solid Waste Management System through  3R (Reduce, Reuse, Recycle)  Construction of Circular Road Network along the river Shitalakshya  connecting with Dhaka-Chittagong and Dhaka-Munshigonj highway  Installation of Water Supply System with Treatment plant  Establishment of Modern Materials Testing Laboratory.  Ensuring Pollution free Water of the river Shitalakshya.

18  Construction of Income generating projects.  a) Improvement & Construction of Kitchen markets  b) Construction of Markets.  c) Construction of Market cum Apartment Building.  d) Other projects  Improvement of City Traffic Facilities  a) Rapid Bus transit with high speed.  b) Connectivity with National Metro rail.  c) Rail based mass transit system.  d) Construction of Ropeway over the river Shitalakshya.  e) Establishment of Circular Waterways  Expansion of City Corporation Area  Installation of own Power plant  a) Installation of own Power generation plant from Solid Waste.  b) Installation of own Power generation plant from others. NB: Incomplete Projects will be continued for 25(Twenty Five) years Vision.

19  Establishment of Surface Water treatment Plant for Domestic Supply.  Construction of Sewerage system with Treatment Plant.  Installation of Industrial Treatment Plant.  Ensuring Pollution free Water of the river Shitalakshya.  Establishment of Educational Institution. a) Establishment of Modern Medical College and Hospital.  b) Establishment of Technical University.  Ensuring City Government System.   NB: Incomplete Projects will be continued for 50(Fifty) years Vision.

20  Establishment of 100% Surface Water treatment Plant for  Domestic Supply  Ensuring 100% Installation of Industrial Treatment Plant.  Construction of 100%Sewerage system with Treatment Plant.  Ensuring 100%Pollution free Water of Shitalakshya River.  Ensuring 100% City Government System.

21  JICA is now working at NCC with “Inclusive City Government Project (ICGP)”.  The goal of ICGP is to establish a framework for the improvement of:  1. Urban Governance  2. Infrastructure Development  Inclusive City Government consist of:  i. Inclusive City Corporation Administration : Coordination in planning and implementation for various infrastructure  ii. Inclusive Beneficiaries : Current & Coming Generation, Marginalized People  iii. Inclusive Agencies : Coordination among various Central Government Agencies

22  A Project Implementation Unit of City Corporation (PIUCC) has also been formed at NCC to coordinate, support and assist JICA as below:  Name/DesignationStatus  Mr. ABM Amin Ullah Nuri, CEO, NCC Chairperson  Mr. Khan Muhammad Nurul Islam, SE, NCC Member  Executive Engineer, LGED, Narayanganj Member  Mr. Md. Nazrul Islam, Panel Mayor-2, NCCMember  Mrs. Sharmin Habib, Panel Mayor-3, NCC Member  Mr. Sultan Ahmed, Ward Coucilor-22, NCCMember  Mr. Mohammad Moinul Islam, TP, NCC Member  Mr. Hasib Mahmud, Medical Officer, NCC Member  Representative, RAJUK Member  Mr. Tarik Bin Yousuf Babu, Social Worker Member  Secretary, NCC Member Secretary

23 Arranged inception meeting in presence of Honorable Mayor, Chief Engineer LGED, Representative of LGD, Representative of Local Administration, Councellors, Member of Civil Society, Media Personnel & NCC Officials. Conducted 03 (Three) PIUCC Meeting Developed Vision of NCC Arranged 01(One) stockholder Meeting Prepared 05(Five) Development Planning jointly NCC and JICA

24 JICA Expert team observed NCC Coordination meeting JICA Expert team visited 03 (three) Zone of NCC JICA Expert team exchanges views with local people and other Government agencies. Department wise Discussions was arranged at NCC in presence of ICGP experts. ICGP Team members partially surveyed and evaluated current position of Narayanganj City Corporation and former 03(three) Municipalities. Honurable Mayor & NCC Official attended National Steering Committee, Inception Workshops and ICGP Working group session.

25  Five years development plan for NCC prepared by JICA and NCC Jointly Sl. No. SectorName of ProjectCost(In Million) 01 a) WSS Installation of Water Supply System in Kadam Rusul Zone b) WSS Installation of Water Supply System in Siddirganj Zone c) WSS Fesibility study for construction of Surface Water Treatment Plant intake from Shitallakhya river a)BridgeConstruction of Foot Over Bridge over Shitalakhya River b)Bridge Construction of Luhia Bridge over Nobiganj Khal c)Bridge Construction of Kuripara Bridge over Kuripara Khal d)BridgeConstruction of Tribini Bridge over Tribini Khal e)Bridge Construction of Baparipara Bridge over Baparipara Khal 50.00

26  Five years development plan for NCC prepared by JICA and NCC Jointly Sl. No. SectorName of ProjectCost(In Million) 03 a) SWM Construction of Sanitary Land Fill, Dustbins, Procurement of Equipment and Treatment Facility at Jimkhana and Chapatoli a) SLS Installation of Street Lighting System and ornamental Lighting in Kadam Rusul Zone b) SLS Installation of Street Lighting System and ornamental Lighting in in Siddirganj Zone a) Park Construction of Park and Rehabilitation of Pond with Plantation b) Stadium Construction of Stadium and Rehabilitation of Pond c) Wter Body Improvement and Beautification of water bodies and Lake Renovation

27  Five years development plan for NCC prepared by JICA and NCC Jointly Sl. No. SectorName of ProjectCost(In Million) 06 a)BuildingConstruction of Community Center-Cum Cultural Center b)BuildingConstruction of Community Center c)BuildingConstruction of Public Toilet /Community Latrin 52.00

28  Five years development plan for NCC prepared by JICA and NCC Jointly Sl. No. SectorName of ProjectCost(In Million) 07 DrainRe-excavation &Beautification of Cannel in Siddirganj Construction of Road side RCC Drain startng from Madanganj Powergrid to Nabiganj Bus Stand via Bandar Construction of RCC Drain Cum Footpath at Ali Ahamed Chunka Road from 2 no rail gate to Nagbari more Construction of RCC Drain Cum Footpath at Jale Para Road from Jelepara Bridge to Lucky Bazar Construction of RCC Drain Cum Footpath at Khal Ghat road 3.74 Construction of RCC Drain at Allamah Iqbal Road Construction of RCC Drain cum footpath from Willson road to Madanganj-Madanpur road (X-Rail line) via Graveyard at Bandar Construction of RCC Drain from Amirabadh Bus Stand to Shitalakhya River Construction of Drain by RCC from Nobiganj Bazar to Dakesshay Mill

29  Five years development plan for NCC prepared by JICA and NCC Jointly Sl. No. SectorName of ProjectCost(In Million) 08 a) Road Construction of Road by BC starting from Madanganj Powergrid to Nabiganj Bus Stand via Bandar Bazar b) Road Construction of Ali Ahamed Chunka Road by RCC from 2 no rail gate to Nagbari more c) Road Construction of Jale Para Road by RCC from Jelepara Bridge to Lucky Bazar d) RoadConstruction of Allama Iqbal Road by RCC e) Road Construction of Road by BC from Willson road to Madanganj-Madanpur road (X-Rail line) via Graveyard at Bandar f) Road Construction of City Protection Embankment with Plantation & Beautification on the both sides of Shitalakhya River g) Road Construction of Road by RCC from Amirabadh Bus Stand to Shitalakhya River h) RoadConstruction of Road by RCC from Nobiganj Bazar to Dhakeshary Mill

30 DR. SALINA HAYAT IVY Honourable Mayor Narayanganj City Corporation

31  Five years development plan for NCC prepared by JICA and NCC Jointly  STACKHOLDER MEETING CHAIRED BY HONOURABLE MAYOR OF NCC

32  PIUCC MEETING CHAIRED BY CHIEF EXECUTIVE OFFICER OF NCC

33

34


Download ppt "WELCOME TO Presentation of NARAYANGANJ CITY CORPORATION."

Similar presentations


Ads by Google