Presentation is loading. Please wait.

Presentation is loading. Please wait.

SUCEES STORY OF BANGRIPOSI BLOCK FOR THE YEAR 2009-10.

Similar presentations


Presentation on theme: "SUCEES STORY OF BANGRIPOSI BLOCK FOR THE YEAR 2009-10."— Presentation transcript:

1 SUCEES STORY OF BANGRIPOSI BLOCK FOR THE YEAR

2 SUCCESS STORY Name of Project:-Renovation of Sadhekala Rengalabeda Tank Name of GP:-Badagaon Name of Village:-Sadheikala Estimated Cost:-Rs. 2,50,000/- Scheme:-MGNREGS Name of Executing Agency:- Gram Panchayat There was no source of water for bathing of human and drinking of cattle for the tribal Villagers of 400 population of Sadheikal Village under Badagaon GP. The project was taken up out of MGNREGA during and it will solve the water problem as well as the job seekers engaged in the project and created 2000 man days.

3 SUCCESS STORY Name of Project:- Imp. of road from Chatraya Dugwell to Jagannath Khunta Primary School Name of GP:-Kalabadia Name of Village:-JN Khunta Estimated Cost:-Rs. 5,00,000/- Scheme:-MGNREGS Name of Executing Agency:- Panchayat Samiti There was no road for the trespassers to their cultivated land. As per labor demand of khadiasole J.N. Khunta village this project, was taken up out of MGNREGS The job seekers were engaged and created 3000 mandays and the villagers have well communication.

4 SUCCESS STORY Name of Project:-Farm Pond of Bhima Hembram Name of GP:-Sorisapal Name of Village:-Sannedam Estimated Cost:-Rs. 500,00/- Scheme:-MGNREGS Name of Executing Agency:- Panchayat Samiti

5 SUCCESS STORY Name of Project:-Imp. of road from Tilla to Kalapathar Name of GP:-Bhuasuni Name of Village:-Tilla Estimated Cost:-Rs. 5,00,000/- Scheme:-MGNREGS Name of Executing Agency:- Gram Panchayat

6 SUCCESS STORY Name of Project:-Renovation of Kadadihia Tank Name of GP:-Shyamsundarpur Name of Village:-Kadadihia Estimated Cost:-Rs. 5,00,000/- Scheme:-MGNREGS Name of Executing Agency:- Gram Panchayat

7 SUCCESS STORY Name of Project:-Farm Pond of Trilochan Naik Name of GP:-SSpur Name of Village:-Asabani Estimated Cost:-Rs. 50,000/- Scheme:-MGNREGS Name of Executing Agency:- Panchayat Samiti

8 DISBURSHEMENT OF WAGES THROUGH POSTAL UNDER MGNREGA

9 DISBURSHEMENT OF WAGES THROUGH BANK UNDER MGNREGA

10 SUPPLY OF DRINKING WATER TO LABOURERS UNDER MGNREGA

11 CRECHE AT WORK SITE UNDER MGNREGA

12 MGNREGA MELA AT BLOCK HEAD QUATER

13 GRAM SANJOYAKA TRAINING AT GP HEAD QUARTER

14 SOCIAL AUDIT AND MUSTER ROLL VERIFICATION AT GP HEAD QUARTER

15 VISIT OF NLM AT WORK SITE

16 LOK- ADALAT AT BLOCK HEAD BLOCK HQ UNDER MGNREGA

17 CONSTRUCTION OF MISSION FARM POND OF SRI BANABIHARI DAS VILLAGE - MAJHIGAON, GP – BANGRIPOSI, YEAR – NREGS , EXECUTING AGENCY - PS, ESTT. COST – RS /- This Farm Pond provided water to his agriculture land in the month of Sept-09 at the time of drought period.

18 CONSTRUCTION OF MISSION FARM POND OF SRI GALU SING VILLAGE - GOHIRAPAL, GP – NISCHINTA YEAR – NREGS , EXECUTING AGENCY - PS ESTT. COST – RS /-

19 CONSTRUCTION OF FIELD CHANNEL WITH WHS AT CHAKDAR VILLAGE - CHAKDAR, GP – BHUASUNI YEAR – NREGS , EXECUTING AGENCY - PS ESTT. COST – RS /-

20 CONSTRUCTION OF FIELD CHANNEL AT S.S.PUR VILLAGE - S.S.PUR, GP – S.S.PUR YEAR – NREGS , EXECUTING AGENCY - PS ESTT. COST – RS /-

21 EXCAVATION OF TANK AT GHTIDUBA VILLAGE - GHATIDUBA, GP – SORISAPAL YEAR – NREGS , EXECUTING AGENCY - GP ESTT. COST – RS

22 MISSION FARM POND OF SRI RATIKANTA PATRA VILLAGE - BHUASUNI, GP – BHUAUSNI YEAR – NREGS EXECUTING AGENCY - PS ESTT. COST – RS /-

23 IMP. OF ROAD FROM BASILAKACHA TO PHULJHARAN VILLAGE – BASILAKACHA, GP- SORISAPAL YEAR – NREGS EXECUTING AGENCY - PS ESTT. COST – RS /-

24 IMP. OF ROAD FROM KALAPATHAR TO TILA RD ROAD VILLAGE – KALAPATHAR, GP- BHUAUSNI YEAR – NREGS , EXECUTING AGENCY - GP ESTT. COST – RS /-

25 IMP. OF ROAD FROM RD ROAD PURUSOTTAM PUR TO BHIM SAHI VILLAGE – PURUSOTTAMPUR, GP- BHUASUNI YEAR – NREGS EXECUTING AGENCY - PS ESTT. COST – RS /-

26


Download ppt "SUCEES STORY OF BANGRIPOSI BLOCK FOR THE YEAR 2009-10."

Similar presentations


Ads by Google