1 MBTA Green Line/B Line Station Consolidation and Accessibility Improvements Public Meeting 10/23/2014 1

2 History of Project City of Boston Commonwealth Avenue Improvements: This area of Commonwealth Ave. is under Phase 2A-CAP 2A (COB) Upgrade pedestrian accessibility, create dedicated bike lanes, improve left turn lanes, and to beautify the median Approached MBTA for review 2 MBTA Green Line/B Line Station Consolidation and Accessibility Improvements

3 33

4 Impacts COB Project triggers accessibility at four MBTA stations - BU West, St. Paul, Pleasant, Babcock The stations would need to be code-compliant Necessitate adjustments to COB design - delay Added design and construction costs for COB New design and construction costs for MBTA MBTA requested that the COB project not be progressed until all the issues are vetted 44 MBTA Green Line/B Line Station Consolidation and Accessibility Improvements

5 MBTA Feasibility of making the 4 existing stations code- compliant? Alternatives? Are MBTA goals and needs being met? Cost and Funding? How to accommodate the COB Project 555 MBTA Green Line/B Line Station Consolidation and Accessibility Improvements

6 MBTA Operational Considerations Over the years the MBTA has been reviewing alternatives to consolidate the 4 existing stations in this congested corridor to: – Improve service times – Increase Green Line reliability – Further enhance safety – Provide upgraded service to our patrons 666 MBTA Green Line/B Line Station Consolidation and Accessibility Improvements

7 Code Considerations Code compliance: 780 CMR, 521 CMR (MAAB), & NFPA 130 Two means of accessible egress from each station platform – minimum egress width of forty-four (44) inches per the state building code and forty-eight (48) inches for accessibility. Maximum allowed distance from remote point of a station platform to Point of Safety is 740 feet based on evacuation times. Accessible boarding of the No. 8 cars from all platforms 777 MBTA Green Line/B Line Station Consolidation and Accessibility Improvements

8 Code Impacts for Existing Stations All 4 stations would need to be relocated mid- block to provide two means of egress and stay within the maximum allowed distance of 740 feet from a remote point on the platform to the Point of Safety based on evacuation times. Need sufficient platform width for egress and to store and deploy mobile lifts Not possible for existing stations to meet code 888 MBTA Green Line/B Line Station Consolidation and Accessibility Improvements

9 MBTA Decision MBTA explored alternatives Reviewed Accessibility and Building Code Compliance, Safety, Green Line Operations, and Engineering Compatibility with the COB Project Most of the alternatives didn’t meet criteria Only one alternative met the criteria 999 MBTA Green Line/B Line Station Consolidation and Accessibility Improvements

10 Preferred Option Scope Consolidates Babcock and Pleasant Street Stations Consolidates St Paul and BU West Stations Advantages Consolidates four stations down to two stations Achieves accessibility, improved safety and customer service Favorable to design and construction Stations centrally located Meets code requirements including space for mobile lifts and to provide 150 feet of canopy on each platform 10 MBTA Green Line/B Line Station Consolidation and Accessibility Improvements

11 Preferred Option (Continued) Advantages (cont.) Babcock Inbound platform requires barrier reset to provide required space for compliance. Space available in COB design Two means of egress from the station with under four minutes to a point of safety from either platform with the mid-block platforms Two stations have capacity of four stations Disadvantages New St. Paul/Amory Outbound platform requires 1’-6” for 225’ from proposed left turn lane, but COB can accommodate. This option meets the criteria 11 MBTA Green Line/B Line Station Consolidation and Accessibility Improvements

12 12 MBTA Green Line/B Line Station Consolidation and Accessibility Improvements

13 Benefits Achieves accessibility Consolidates 4 stations down to 2 - operational benefit Provides safety enhancements Significant cost savings: design and construction Advances COB design Benefits stakeholders 13 MBTA Green Line/B Line Station Consolidation and Accessibility Improvements

14 Interagency Coordination COB Project to precede MBTA project - MBTA project cannot commence until COB Project is completed COB design accommodates MBTA needs Close coordination is required in design and construction of both projects 14 MBTA Green Line/B Line Station Consolidation and Accessibility Improvements

15 New Stations Two new stations: – are centrally located – touch same intersections of the 4 current stations – have capacity of the 4 current stations – include added platform width and walkways – are modern/MBTA standards Old stations will be removed and blend-in 15 MBTA Green Line/B Line Station Consolidation and Accessibility Improvements

16 Accessibility MBTA’s mission Green Line accessibility is a priority All platforms will be accessible for No. 8 cars First time these stations to have detectible warning strips 150 foot Canopy and benches on platforms Distances between stations 16 MBTA Green Line/B Line Station Consolidation and Accessibility Improvements

17 Operations Benefits of station consolidation Travel time improvements Green Line reliability 17 MBTA Green Line/B Line Station Consolidation and Accessibility Improvements

18 18 MBTA Green Line/B Line Station Consolidation and Accessibility Improvements Boston College South St Chestnut Hill Ave Chiswick Rd Sutherland Rd Harvard Ave Packards Corner Babcock St Pleasant St St Paul St BU West BU Central Washington St Warren St Allston St Griggs St B Line, current, average spacing 1231 feet Boston College South St Chestnut Hill Ave Chiswick Rd Sutherland Rd Harvard Ave Packards Corner Babcock/Pleasant St Paul/BU West BU Central Washington St Warren St Allston St Griggs St B Line, proposed average spacing 1396 feet 18%33%26% 27 % 36%20%12%9% 6%16% 43 % 29%20%15% Station usage compared to line volumes, source CTPS (2010) 18%33%26% 27 % 36%20% 14%16% 43 % 29%20%15%

19 19 MBTA Green Line/B Line Station Consolidation and Accessibility Improvements B Line, current stop spacing Packards Corner Babcock/Pleasant St Paul/BU West BU Central B Line, proposed stop spacing Packards Corner Babcock St Pleasant St St Paul St BU West BU Central 949ft760 ft764 ft599ft1926 ft 1476ft1284ft2238ft

20 Safety Enhances safety by providing walkways to platforms Faster pedestrian unloading of crosswalks Improved queuing for trains No mid-block crossing Pedestrians flow to signalized intersections 20 MBTA Green Line/B Line Station Consolidation and Accessibility Improvements

21 Security and Communications Extension of the Fiber Optic based Wide Area Network – from Kenmore Station to the proposed new stations. – Incorporate Blandford, BU East, and BU Central Stations to the east and the remainder of the B Line stations to the west in the future. – dedicated connectivity for all Security and Communications Systems. 21 MBTA Green Line/B Line Station Consolidation and Accessibility Improvements

22 Security and Communications Video Surveillance System – Provide CCTV cameras at each station to view platforms and intersections. Video shall be centrally stored, and remotely accessible. Emergency Call Box System – Provide Emergency Call Boxes on each platform to provide customers with direct access to the MBTA. 22 MBTA Green Line/B Line Station Consolidation and Accessibility Improvements

23 Security and Communications Public Address / Visual Message System – Provide audio and visual ADA compliant broadcast messages from the OCC. System will be compatible with future Green Line Next Train Announcements. Telecommunications – Provide local telephone service for employees. 23 MBTA Green Line/B Line Station Consolidation and Accessibility Improvements

24 Cost (based on Conceptual Design) Professional Services $600,000 Construction of 2 new stations Including Canopies, Security and Communications, and demo/restoration of old stations Construction$5,800,000 Flagging, Admin, Inspection,… $2,000,000 Total Project cost $8,400, MBTA Green Line/B Line Station Consolidation and Accessibility Improvements

25 Schedule Design 30% completed by end of % Design completed by next summer Bid Phase Out to bid, Award and NTP to a Contractor in late 2015 Construction 12 to 18 months (Will have schedule & cost estimate at 30% design) Schedule dependent upon COB Project 25 MBTA Green Line/B Line Station Consolidation and Accessibility Improvements

26 Potential Benefits and Risks Coordination with COB Commonwealth Avenue Phase 2A - CAP 2A Project Coordination with MHD Superstructure Replacement (B ) Commonwealth Avenue over I-90 & MBTA Project Efficiencies to be gained through interagency coordination/cooperation 26 MBTA Green Line/B Line Station Consolidation and Accessibility Improvements

27 Summary Accessibility improvements Operational benefits Enhanced safety Design and Construction benefits Facilitates COB Project Requires close design/construction coordination with COB Project MBTA project to follow COB Project 27 MBTA Green Line/B Line Station Consolidation and Accessibility Improvements

28 Summary (Continued) COB Project to set the curb and barrier lines The MBTA project could take up to a year to design and months to construct B Line continues to run during construction Greater detail to be shared at 60% design Goal - To build a better transportation system for all patrons! 28 MBTA Green Line/B Line Station Consolidation and Accessibility Improvements

29 Thank You! Questions? 29 MBTA Green Line/B Line Station Consolidation and Accessibility Improvements