SISCAL INTRODUCTION Mar 09 REV2 1 SHIPBOARD INSTRUMENTATION AND SYSTEMS CALIBRATION(SISCAL) DAVE YOUNG DAVE YOUNG.

Similar presentations


Presentation on theme: "SISCAL INTRODUCTION Mar 09 REV2 1 SHIPBOARD INSTRUMENTATION AND SYSTEMS CALIBRATION(SISCAL) DAVE YOUNG DAVE YOUNG."— Presentation transcript:

1 SISCAL INTRODUCTION Mar 09 REV2 1 SHIPBOARD INSTRUMENTATION AND SYSTEMS CALIBRATION(SISCAL) DAVE YOUNG DAVE YOUNG

2 SISCAL INTRODUCTION Mar 09 REV2 2 PROGRAM SISCAL: Shipboard Instrumentation and Systems Calibration –NOT “SYSCAL” Policies and Responsibilities –OPNAVINST –NAVSEAINST B –GYD-10 –JFMM –NAVAIR 17-35QAL-15 (AIMD’s) Engineered Calibration Workload Document –RCM-Based –Maintained by SSES Philosophy and Methodology Applicable to Surface Ships, Carriers, Submarines

3 SISCAL INTRODUCTION Mar 09 REV2 3 POLICY Policies and Responsibilities –OPNAVINST –NAVSEAINST B Assigns policy and responsibility for Shipboard Instrumentation and Systems Calibration (SISCAL) Program. NAVSEA 04RM is the Calibration Technical Authority for Installed Instrumentation SISCAL Engineering Agent: NSWCCD-SSES 953 Responsibilities –NAVSEA 04, SISCAL EA, PEOs, FFC CRL is the AuthoratativeTechnical Document for installed instruments –JFMM Vol VI, Chapter 9 Responsibilities –TYCOM, refers to QAL-15 (AIMD) –NAVAIR 17-35QAL-15 Chapter 4 Responsibilities –CO, EO, RO and AIMD

4 SISCAL INTRODUCTION Mar 09 REV2 4 Why 2 Calibration programs? TMDE Portable Component-Based Single Interval Emphasis - Work Ashore Cal in Lab ICPs –Mfr/Model Specific –Lab Oriented EA = NSWC Corona Instrumentation Installed Application-Based Multiple Intervals Emphasis - Work Afloat Cal in Place Aboard Ship MRCs & SCPs –Application Specific –In Situ Oriented EA = NSWCCD-SSES METCAL SISCAL

5 SISCAL INTRODUCTION Mar 09 REV2 5 WHAT IS SISCAL ? For Installed Instrumentation, a means to determine: –who should calibrate (maintenance level), –what should be used to calibrate (Cal Standards/equipment), –how often calibration should be accomplished (interval), –where it should be calibrated (on site), –why it should be calibrated (criticality analysis) –how it should be calibrated (procedure) Issue Calibration Requirements Lists (CRLs) for Every Hull –Documents Technical Requirements for all installed NAVSEA COG instruments. Excluded are those instruments covered by Reactor plant Manual or SSP instructions.

6 SISCAL INTRODUCTION Mar 09 REV2 6 SISCAL PROCESS

7 SISCAL INTRODUCTION Mar 09 REV2 7 WHY IS IT CALIBRATED ? Decision Logic Module (DLM) Process –Safety/Regulatory/Operational Factors –Criticality and RCM Analysis Calibrate only those instruments that require calibration Documents for this analysis are limited to NSTMs, safety bulletins, NAVOSH manual, regulatory requirements Maintenance, assessment, testing and/or troubleshooting documents are not to be included Engineering Agent (EA) –NSWCCD-SSES 953 Participants –Equipment ISEAs –Fleet

8 SISCAL INTRODUCTION Mar 09 REV2 8 WHEN IS IT CALIBRATED? Scheduled Per SISCAL Periodicity – RCM Methodology Based – Functional Impact Assessed SISCALMER/Fleet Feedback/ISEA Feedback/Etc. Adjusted Intervals (EXCALIBUR SECNAV) –Gages (24-36 months) –Bimetallic Thermometers (36-48 months) –Remote Thermometers (12-36 months) – Age Explored

9 SISCAL INTRODUCTION Mar 09 REV2 9 WHERE IS IT CALIBRATED? ON-SITE / IN-PLACE Eliminates “Damage Potential” Removal, Transportation and Installation Minimizes System Downtime Reduces Tag-Outs Reduces Sailor Workload Uses Shipboard Calibration Procedures

10 SISCAL INTRODUCTION Mar 09 REV2 10 HOW / WHAT / WHO CALIBRATES? Stand alone Instrumentation (Gages/Thermometers/Switches) –Ship’s SGCP FCA or Ship’s AIMD (Cal Activity 1) On-Site –Maintenance Requirement Cards (MRCs) Machinery Control Systems (Transducers/RTDs/Panel Meters/Etc.) –SISCAL Team (Cal Activity 2) On-Site –System Calibration Procedures (SCPs) Unique Cal Support Requirements (Flowmeters/Accelerometers/Vibration Transducers/Magnahelic Gages, etc....) –FMA/RCCs (Cal Activity 3) Off Site/Ashore –METCAL ICPs

11 SISCAL INTRODUCTION Mar 09 REV2 11 CALIBRATION REQUIREMENTS LIST Calibration Technical Authority Document for Installed Instrumentation per NAVSEAINST B Identifies: –Instrument Configuration (Unique Reference Number) System, Function Location (deck-frame-space-compartment), Level, Compartment Name (alphabetical) Nomenclature Model, Range Inst No –Calibration Requirements (Y or N) –Calibration Support Documentation (CSD) Procedures Intervals Activity On Site

12 SISCAL INTRODUCTION Mar 09 REV2 12 CRL SNAPSHOT (TM CD)

13 SISCAL INTRODUCTION Mar 09 REV2 13 CRL SNAPSHOT (TM CD)

14 SISCAL INTRODUCTION Mar 09 REV2 14 CALIBRATION REQUIREMENTS LIST Inventory –Initial Measure Inventories on New Construction Ships –Installed Instrumentation Configuration Review (IICR) Accomplish during construction CRL published w/in 90 days of delivery Data Available Electronically, Download to Excel, Word, etc. –User’s Guide –“What’s New” File –Update Buttons, Comparisons of Current versus Last CRL CD Additions, Deletions Changes to Data –PMS Links in CRL Records –Form View versus Datasheet View

15 SISCAL INTRODUCTION Mar 09 REV2 15 CRL TMDER TMDER –QAL-15 Par 4.3.3,.3.4, Responsibility for submitting and receiving AIR Process: –Each department submit TMDER to LSC or MSC –CNAF N432 reviews and submits to NSDSA SURF Process: –Brokered by Port Heuneme –Submit copy via to SISCAL if possible

16 SISCAL INTRODUCTION Mar 09 REV2 16 WHAT ARE WE DOING TO REDUCE WORKLOAD? Decision Logic Module (DLM) –new Rev 12 –Applying Criticality Analysis and RCM to Calibrate Only Those Instruments That Require Calibration Evaluating Calibration Interval Extensions –Age Exploration based upon function Improved Cal Standards –Portable Pressure Calibrator –Multi-Function Calibrator Instrument-Specific Procedures in PMS –Better Information to Accomplish the Job Streamlining Cal Procedures –Restrict Calibration to System Operating Range

17 SISCAL INTRODUCTION Mar 09 REV2 17 Calibration Procedures Cal Activity 1 PMS –Organizational Level (SGCP FCAs/AIMDs) –Gages/Thermometers/Switches/Switchboard meters –9802 MIP Series Currently 9 MIPs with 63 MRCs –System MIPs and MRCs Currently 4992 MRCs System, function, range specific –‘H’ Code MRCs on MIP PMSMIS ISEA 100 Designates as SSES 953 SISCAL responsibility Cal Activity 3 ICPs –FMA (Unique Cal Support Requirements) –Flowmeters, Magnehelic Gages Laboratory Facilities NAVAIRs

18 SISCAL INTRODUCTION Mar 09 REV2 18 Calibration Procedures Cal Activity 2 System Calibration Procedures Machinery Control Systems –SISCAL Team only No AIMD per QAL-15 No Contractor Companies Only SSES certifies teams –Coordinate with RMC Submit 2-kilo requesting visit –Instruments that are not standalone Pressure transducers, RTD, thermistors, thermocouples, tachometers, magnetic pickups, TLI radar sensor, signal conditioners, PLC Modules, panel meters, digital display System loop calibration

19 SISCAL INTRODUCTION Mar 09 REV2 19 Calibration Procedures CVN68 Class TM ST700-EG-PRO-010 –Under development Currently developed/validated –AC Plants HFC-236 –ICAS/Smart Carrier CVN70, 72, 73, 74 and 75 –MACHALT 501 Installation, SSAC Cap 12 and O2N2 Compressors Cap 16 –TLI Receivers, certain systems Current designation as TBD in CRL –TLI Radar Sensors, ongoing development fleet wide –EDG Temperature Panel, 1TM panel etc… –PMS312 funded »CD N TBDs –Development/Validation ongoing

20 SISCAL INTRODUCTION Mar 09 REV2 20 MEASURE CRL versus Measure Comparison Program –PMS 312 funded development of CRL to Measure Comparison program Program tailored for ships force use with MEASURE MIQ and CRL Uses Access database

21 SISCAL INTRODUCTION Mar 09 REV2 21 PMS vs. MIQ PMS VERSUS MIQ: – PMS for Engineering, Weapons, Operations, etc.. System MRC Contains Test Points/ Tolerances Or Set/Reset Point/Tolerances For Instrument CRL Fields: System MIP And System MRC (MRCs To Be Changed To R Periodicity From A-16r) Not All Instruments Have System MIPs/MRCs. Still In Process Of Development. – May use TFBR Process for changes. CRL will change at the same time. Uses SKED To ‘Take Credit’ – MIQ For AIMD Cal Lab Uses 9802 MIP Series Per COMNAVAIRSYSCOM Msg z Jun 05 CRL Fields Cal Document, Cal Procedure, Cal Activity, Periodicity, On Site Uses MIQ To ‘Take Credit’

22 SISCAL INTRODUCTION Mar 09 REV2 22 SISCAL POINTS OF CONTACT NSWCCD-SSES 953 –Ed Gormley(215) NAVSEA –Mr. K. PanditSEA 04RM3(202) TWH –Mr. D. YoungSEA 04RM32(202) SISCAL program manager


Download ppt "SISCAL INTRODUCTION Mar 09 REV2 1 SHIPBOARD INSTRUMENTATION AND SYSTEMS CALIBRATION(SISCAL) DAVE YOUNG DAVE YOUNG."